PROJECT OXYGAS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
02379707
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
1
Document Creation Date: 
September 6, 2019
Document Release Date: 
September 12, 2019
Sequence Number: 
Case Number: 
Publication Date: 
December 21, 1964
File: 
AttachmentSize
PDF icon PROJECT OXYGAS[15687543].pdf101.39 KB
Body: 
!�': " XERO " COP Approved for Release: 2019/07/30 CO2379707 � � 21 December 1964 MEMORANDUM FOR: DAD/LS/ORD SUBJECT: Project OXYGAS REFERENCE: ORD 2690-64 dated 3 December 1964 1. We have reviewed the referenced memorandum and our response to the various questions will be covered in succeeding paragraphs. It should be noted that we agree in general with the program and your plans for supporting it through FY-65. 2. Maritime Branch will be interested in the program pro- viding the contractor successfully completes the current tech- nical feasibility study. Maritime Branch will take the lead in determining operational feasibility once technical feasibility, has been demonstrated. 3.3(h)(2)� . 6.2(d) 3. We concur in the program submitted by the contractor. We have no additional tasks to add. The system design study appears satisfactory; however, we would like to include sea launch and recovery and air transportation of the animals. Maritime Branch will arrange for the necessary support to carry out these evolutions. We only ask that we be kept apprised of all developments in order that the necessary arrangements for � transportation may be made on a timely basis. 4. We welcome the opportunity for active participation by Maritime Branch personnel in this study. We will be happy to be mutually agreed upon by both our 0x/ices. have a member of our staff survey at a time to � 5. We expect to be in a position to provide funds to assist in the study. Your reluctance to invest in specialized maritime equipment is understood and where such items may be required, we will plan to provide. 6. Our participation with your office in this project has in our opinion been a more than satisfactory arrangement. It is understood that as the project attains a more operational than technical complexion your office's input will diminish and ours will increase. �I feel there will be need for continuing conferences between our offices as this transition takes place ' in order that properly balanced participation can be achieved. rX140.4 COP .Chief, Maritime Branc4/ Special Operations Dibttlan--___;-- X ERO COPY pproved for Release: 2019/07/30 CO2379707 1 CCU? I Ex cluded Ireri culumallt dewn:redin; ;ad . dcula:eilleellen