OAK - PART IV MISSION 4017 29 APRIL - 3 MAY 1965

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP03T02227R000100070001-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
63
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 9, 2006
Sequence Number: 
1
Case Number: 
Publication Date: 
May 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP03T02227R000100070001-9.pdf5.29 MB
Body: 
Approved For Release 2008/03/06: CIA-RDP03T02227R000100070001-9 Copy "x 56 Pages OAK - PART IV MISSION 4017 29 APRIL - 3 MAY 1965 Handle Via Control Only Declass Review by NGA May 1965 For Release 2008/03/06: CIA-RDP03TO2227ROO01 00070001-9 Approved Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 MISSION 40171.29 APR 3 MAY.65 TABLE OF CONTENTS TRACK OF MISSION HIGHLIGHTS MISSILES AIR FACILITIES NAVAL ACTIVITY/PORTS- ELECTRONICS/COMMUNICATIONS MILITARY ACTIVITY. COMPLEXES ATTACHMENTS TOP SECRET Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 TOP 5I:LKt I MISSION 4017.29 APR - 3 MAY 65 OAK - PART IV MISSION 4017 THIS IS THE FOURTH OF FIVE OAK REPORTS ON MISSION 4017 AND PROVIDES INFORMATION ON THOSE COMMITTEE ON OVERHEAD RECONNAISSANCE (COMDR) TARGETS OBSERVED ON THE PHOTOGRAPHY. TARGETS ARE ARRANGED IN THE OAK BY SUBJECT AND WITHIN EACH SUBJECT BY.COMOR TARGET NUMBER. TARGETS OF OPPORTUNITY: OBSERVED DURING THE OAK REPORTING PERIOD ARE LISTED NUMERICALLY-UNDER THE APPRO- PRIATE SUBJECT AFTER THE LISTING OF?COMOR TARGETS. LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY.THE COUNTRY-CODE PRECEDING THE COORDINATES. SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND REPORTED FOLLOW THE DESCRIPTION OF THE. TARGET6 PASS NUMBERS ARE SUFFIXED WITH THE LETTER D FOR DESCENDING (NORTH-TO-SOUTH). FRAMES ARE INDICATED BY THE LETTERS FR FOLLOWED BY THE FRAME NUMBER AND AN INDEX NUMBER RUNNING CONSECUTIVELY.FROM THE BEGINNING OF EACH PASS -- FR 4/8 FOR EXAMPLE, MEANS FRAME 44 INDEX 8. UNIVERSAL REFERENCE GRID (X-Y).COORDINATES ARE GIVEN IN PARENTHESIS AFTER THE INDEX NUMBER TO WHICH THEY APPLY. THIS GRID IS IDENTIFIED AS UNIVERSAL GRID NO. If FEB 64. SYMBOLS INDICATING CONDITIONS WHICH AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE AS FOLLOWS -- C (CLEAR), H (HAZE),. CS (CLOUD SHADOW), HC (HEAVY. CLOUD COVER)e.SC (SCATTERED CLOUD COVER), SD (SEMIDARKNESS), 0 (OBLIQUITY), S (SNOW), PQ (POOR IMAGE QUALITY)... OAK RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF THE PHOTOGRAPHY IS BEING ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEMERAL DATA. CONSEQUENTLY, FUTURE DETAILED ANALYSIS MAY RESULT IN MINOR-ALTERATIONS. TOP SECRET Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Iq Next 3 Page(s) In Document Denied Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Highlights Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 HIGHLIGHTS A NEWLY. IDENTIFIED SITE, DESIGNATED F109.IS LOCATED AT 56-12N 092?06E. SITE F5 IS NOW A CONFIRMED SITE. A,NEWLY IDENTIFIED PROBABLE SINGLE SILO SITE IS LOCATED AT 56-13N 092-00E. IT IS DESIGNATED-G4. ERECTORS ARE PRESENT ON ALL 4-LAUNCH PADS AND MISSILE EXERCISES ARE APPARENTLY.UNDERWAY ON EACH OF.THE PADS. 4. KURGANCHA MRBMLAUNCH SITE 1 ERECTORS ARE VISIBLE ON EACH LAUNCH PAD AND APPROXIMATELY. 50 VEHICLES/PIECES OF EQUIPMENT ARE LOCATED THROUGHOUT THE LAUNCH SITE. FIVE FAGOT/FRESCO ARE OBSERVED WITHIN THE LAUNCH AREA. THESE AIRCRAFT HAVE BEEN IN POSITION SINCE AT LEASTI -BUT WERE NOT IDENTIFIABLE. ERECTORS ARE VISIBLE ON EACH LAUNCH PAD AND 17 VEHICLES/PIECES OF EQUIPMENT ARE LOCATED THROUGHOUT THE LAUNCH SITE. NO CHANGE. IN THE 5 BEAGLE AIRCRAFT PARKED WEST OF'.THE SITE. 6. KAPUSTIN.VAR LAUNCH COMPLEX B A:POSSIBLE WINGED OBJECT APPROXIMATELY IS NEWLY.OBSERVED ON THE SOUTH PAD OF LAUNCH AREA B1. AT LAUNCH AREA B39 THE MECHANISMS UNDER THE OVERHEAD TRAVELING CRANE APPEAR TO BE IDENTICAL TO CRUISE-MISSILE LAUNCHERS SEEN ON ECHO-CLASS SUBMARINES. TOP SECRET Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 AT LAUNCH AREA 2C, ANSS-4 EXERCISE IS UNDERWAY-AT LAUNCH PAD 20-20 ALSO, A MISSILE EXERCISE .IS TAKING PLACE ON THE NORTH PAD OF SITE 5C-1, LAUNCH. AREA'5C0 8m KAPUSTIN YAR LAUNCH COMPLEX D. THREE?STRAIGHT-WING DRONES WITH A ~ WING SPAN AND 25-FT FUSELAGE ARE OBSERVED_IN LAUNCH AREA 3De 9e KAPUST N. VAR LAUNCH COMPLEX EI A PROBABLE SCUD EXERCISE IS INPROGRESS IN THE BIVOUAC. TRAINING AREA LOCATED WSW OFTHE COMPLEX. EXERCISE CONTAINS A TRANSPORTER-ERECTOR-LAUNCHER, AN A-FRAME CRANE, A PROBABLE TRANSPORTER, AND 6 OTHER UNIDENTIFIED VEHICLES, 10e AKHTUBINSK/VLADIMIROVKA AIRFIELDI X 150 FT--HAS BEEN CONSTRUCTED SINCE .AND PARALLELS THE 13,350 FT CONCRETE RUNWAY. SINCEI IA SOD RUNWAY, APPROXIMATELY-11-9360 X 320 FT, HAS BEENADDED PARALLELING THE 2:WNW/ESE-_RUNWAYS0 ONE-PROBABLE KANGAROO ASM IS OBSERVED-IN FRONT OF THE HANGAR--TYPE BUILDING IN THE AMM AREA,&:- A TOTAL OF 196 AIRCRAFT WAS OBSERVED WITHIN THE AIRFIELD PROPER, INCLUDING -- BLINDER,:BEAGLE, BADGER, MANDRAKES FITTER, FI,SHPOT, FI.SHBED, FIREBAR, FLASHLIGHT/FIREBAR,.FARMER, FAGOT/FRESCO, CATJCUB, COOKPOT, COKE, CRATE, AND BULL. A TALL KING FACILITY.IS NEWLY IDENTIFIED 303 NM.SSE OF PENSARO ONE-HUNDRED--TWENTY--FIVE COMOR TARGETS WERE OBSERVED DURING THE OAK ;REPORTING- PERIOD .AND ARE CONTAINED IN THIS OAK. TOP SECRET Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Missiles Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 TOP SECRET MISSION 4017.29 APR ? 3 MAY 65 MISSILES GLADKAYA ICBM LAUNCH AREA B (SITE 2) UR 5624N 09227? IDENTIFICATION ONLY. GLADKAYA ICBM LAUNCH AREA D (SITE 5) LAUNCH AREA D IS COVERED ON FAIRS NON-STEREO PHOTOGRAPHY. NO SIGNIFICANT CHANGE SINCE A NEWLY IDENTIFIED SITE, DESIGNATED F10, IS LOCATED AT 56-12N 092-06E. A SECURITY FENCE, A SILO EXCAVATION, A GRADED ACCESS, AND A CABLE DITCH LEADING TO SITE F1 CAN BE IDENTIFIED. SITES F1-F4 (SITES 7, 89 9, 14). AND F8 (SITE 15) CAN BE IDENTIFIED ONLY. F9 (SITE 13) IS CLOUD COVERED. SITE F5 (SITE 10) IS NOW A CONFIRMED SITE. THE SECURITY FENCE IS NOT YET COMPLETE. IT CONSISTS OF A SILO EXCAVATION? POSSIBLY CONTAINING A SILO, AND A GRADED ACCESS PARALLELING THE OTHERS IDENTIFIED IN THIS LAUNCH GROUP. SITE F6 (SITE 11) APPEARS THE SAME AS SITE F5 WITH THE EXCEPTION-OF .A COMPLETE SECURITY FENCE. THE GRADED LEVEL AND A PORTION OF THE GRADED LEVEL ACCESS TO SILO F? (SITE 12) CAN BE IDENTIFIED BUT DARKNESS PRECLUDES DETAILED INTERPRETATION. PORTIONS OF SEVERAL CABLE DITCHES OBSERVED THROUGHOUT THE AREA. THEY-APPEAR TO CONNECT INDIVIDUAL. SITES TO EACH OTHER AND TO THE SUPPORT/CONTROL BUT SCATTERED CLOUDS PRECLUDE COMPLETE INTERPRETATION. A NEWLY IDENTIFIED PROBABLE SINGLE SILO SITE IS LOCATED AT 56--13N 092-00E. IT IS DESIGNATED G4 SINCE IT. TOP SECRET Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 Approved For Release 2008/03/06: CIA-RDP03TO2227R000100070001-9 APPEARS TO BE MORE CLOSELY POSITIONED WITH THE G GROUP THAN THE F GROUP. IT CONSISTS OF A SMALL SECURED AREA ENCLOSING AN EXCAVATION OR GRADING ACTIVIT=Y.. LACK OF STEREO PHOTOGRAPHY LIMITS DETAILED INTERPRETATION. NO OTHER SITES IN THE G GROUP=ARE COVERED. ERECTORS ARE PRESENT ON ALL 4 LAUNCH PADS AND MISSILE EXERCISES ARE APPARENTLY UNDERWAY ON EACH OF THE PADS. AT