STATEMENT OF WORK 9 AMPERE-HOUR PRISMATIC MERCURIC OXIDE/ZINC CELL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP09-02457R000100330010-9
Release Decision: 
RIFPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 13, 2012
Sequence Number: 
10
Case Number: 
Publication Date: 
July 14, 1977
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP09-02457R000100330010-9.pdf88.07 KB
Body: 
Declassified and Approved For Release 2012/09/13: CIA-RDP09-02457R000100330010-9 STATEMENT OF WORK 9 Ampere-Hour Prismatic Mercuric Oxide/Zinc Cell 1. INTRODUCTION This document describes the U. S. Government's need for the development and engineering of a capability to fabricate moderate numbers of highly reliable, sealed, high energy density mercuric oxide/zinc cells. One hundred ten (110) sample cells will be delivered for evaluation 9 months after contract start. Later phases of this program may involve the construction of 550 cells for qualification in FY-79 and 1 -- 2,000 cells for operational use in FY-80. This contract action involves the first phase only (Task 1). 2. PROJECT GOALS The contractor will review existing electrochemical and mechanical performance parameters and process techniques for mercuric oxide/zinc cell construction. The contractor will then duplicate the design of this cell which could reasonably be expected to meet the target specifications. Sample cells will then be tested against those specifications. Additional design work will be conducted to overcome any shortcomings in performance. A statistically significant number of cells will be constructed and tested to confirm design performance against the electrical, mechanical, and enviornmental requirements. One hundred ten (110) engineering samples will be delivered to the government for test and evaluation. All engineering test data, design drawings, and process specifications will be included in a final report. Declassified and Approved For Release 2012/09/13: CIA-RDP09-02457R000100330010-9 Declassified and Approved For Release 2012/09/13: CIA-RDP09-02457R000100330010-9 3. TARGET SPECIFICATIONS a. Voltage b. Capacity c. Rate d. Shelf Life le. Leakage f. Deflection g? Temperature h. System i. Environmental j. Life k. Size 4. PROGRAM PLAN Attached (Figure 1) 5. DELIVERABLES a. One hundred ten (110) each hermetically-sealed, corrosion resistant cells meeting the target specifications. 1.34 nominal 1.0V cutoff 9AHr @ 2 ma @ 75?F 15mA max at 75?F 90% rated capacity after 3 years at 75?F 10-8 cc/sec Helium @ STP 0.050" at center of case under any rated condition of temperature, rate or discharge 55?F to 140?F Mercuric oxide/NaOH:H20/Zinc Type I equipment 3 years combined storage and use 1.4" X 1.6" X 0.6" max b. Five (5) copies of monthly letter reports on technical and financial status. . c. Five (5) copies of a final report including test data, design drawings, and process specifications 6. TECHNICAL PROPOSAL REQUIREMENTS The technical proposal should contain: a. The background and test data base necessary to design the required cells. .b. Envisioned design alternatives including, if possible, a preferred design concept. Declassified and Approved For Release 2012/09/13: CIA-RDP09-02457R000100330010-9 Declassified and Approved For Release 2012/09/13: CIA-RDP09-02457R000100330010-9 c. Design calculations to indicate theoretical feasibility of meeting each of the target specifications. d. A detailed project plan. e. A list of applicable references and supporting documents. f. A detailed cost proposal for 10 and 100 deliverable units. 14 July 1977 Declassified and Approved For Release 2012/09/13: CIA-RDP09-02457R000100330010-9