(Classified) OPERATIONS PLAN 42-59 1959 TASK FORCE STAGING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP33-02415A000100190004-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
59
Document Creation Date:
November 11, 2016
Document Release Date:
July 29, 1998
Sequence Number:
4
Case Number:
Publication Date:
April 1, 1959
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 1.29 MB |
Body:
Sanitized - Approved o teLelrsl~~P33-02415A000100190004-5
Sanitized - App : FCIA-RDP33-02415A000100190004-5
Sanitized - ApprovTMR& flfJTDP33-O241 5A0001 00190004-5 -4
OPERATIONS PLAN
42-59
1959
TASK FORCE STAGING
COPY 1 OF 5 COPIES
TOP SECRET CONTROL NUMBER
160426
OPERATIONS PLAN 42-59
1 APRIL 1959
Sanitized - ApprovelOPRee C L'LDP33-02415A000100190004-5
&S I
Sanitized - ApprovecTFO PeIGREP33-0241 5A0001 00190004-5
OFFICIAL:
25X1A9a
ANNEXES: A - Operations
B - Logistics: Appendix 1 - Supply
Appendix 2 - Equipment
Appendix 3 - Transportation
Appendix 4 - Personnel
Appendix 5 - Personnel Recap
Appendix 6 - Cargo Recap
Appendix 7 - Packing, Crating and Marking
C - Communications
D - Security
E - Medical/Personal Equipment
F - Intelligence (omitted)
DISTRIBUTION:
Copy 1 - Project Director
Copy 2 - Project Director of Operations
25X1 C4a Copy 3 - Commander,
Copy 4 - Operations
Copy 5 - Materiel,
Sanitized - ApprovedT IeSE (RL1P33-02415A000100190004-5
4 Tsl6O 26
Conv of 5
Sanitized - Approved TcOPIeSECCRETP33-O241 5A000 100190004-5
Sanitized -Approve
e RIDP33-02415A000100190004-5
fjjKq,"(c
Sanitized - Appr
SVQ CA
or Fe A-RDP33-O2415A000100190004-5
42-59
1959
COPY 1 OF 5 COPIES
TOP SECRET CONTROL NUMBER
/6e '2C
ANNEX "A", OPERATIONS PLAN 42-59
1 April 1959
Sanitized - Approved For Release : CIA-RDP33-02415A000100190004-5
Sanitized - Approved For ,:5f( 0b2415A000100190004-5
25X1 C4a
1 April 1959
Annex "A", Operations Plan 42-59
"OPERATIONS"
25X6C
1. MISSION:
a. Upon receipt of an order of execution, deploy personnel
and equipment as outlined in this Operation Plan to a designated
Advance Base and return within the specified time schedule.
b. Arrange for dispatch of one/two U-2 aircraft from
to Advance Base, after Task Force is in place
at Advance Base,
2. AIRCRAFT DEPLOYMENT :
a. Ferry flight of U-2 aircraft will be as directed by
Project Headquarters or Detachment Commander.
b. U-2 aircraft ferry configuration:
(1) Takeoff fuel: As dictated by ferry route.
(2) Minimum fuel reserve: Optimum altitude 100
gallons. Ferry mission will be flown at optimum altitude utilizing
pre-computed celestial observations for course lines.
c. Special UHF radio channelization will be as dictated
by Project Headquarters Operations Order.
TS160426
Copy !-of 5
Sanitized - Approved FOJF S6 KPT3-02415A000100190004-5
Sanitized - Approved Fo%fheSE(R'T4sAooo1 [ 0 0190004-5
25X1 C4a
d. Aircraft will launch from on a
"Local Flight Clearance", AF Form 113,
e. Standard emergency procedures will apply.
f. Emergency bases enroute: As briefed, dependent on
deployment route.
3. TASK FOR SUBORDINATE UNIT:
a. Commander, REAR, will:
(1) Maintain a replacement aircraft on standby for
dispatch to Advance Base. Execution for deployment will come from
Project Headquarters.
(2) Keep Commander, Advance Base, informed on location
of support aircraft.
(3) Support additional requirements of Commander,
25X1 C4a Advance Base, within the capability of
4. TASK FORCE OPERATIONS EQUIt1,MTT: Operations staging kit,
to include all necessary maps, logs, intelligence data, escape and
evasion currency, references and supplies, will be deployed.
X. GENERAL INSTRUCTIONS:
a. All phases of mission planning, briefing and de-briefing
to include pilot pre-breathing will be conducted in the C-130 aircraft.
b. Mission pilot will be loaded directly from support air-
craft to the mission aircraft and unloaded from mission aircraft to
support aircraft.
c. Mobile Control will operate from the unit MA-2 power unit
and/or C-130 aircraft.
TS160426
Copy 1 of 5
Sanitized - Approved For'te . F3'1-02415A000100190004-5
Sanitized - Approved ForeSji""*-OT-02415A000100190004-5
Sanitized - Approved Fo fjse EIJ.02415A0001001900045
af Tan
Sanitized - Appr or'ReIda,e k a1tIA-RDP33-02415A000100190004-5
ANNEX "B"
OPERATIONS PLAN
r{d_~o
-42.-59---
TABLE OF CONTENTS
Paragraph 1 Supply
2 Transportation
" 3 Service
4 Personnel
5 Miscellaneous
Appendix 1 SUPPLY
" 2 EQUIPMENT
" 3 TRANSPORTATION
4 PERSONNEL
r1 5 PERSONNEL RECAP
if 6 CARGO RECAP
It 7 PACKING, GRATING AND MARKING
COPY 1 OF 5 COPIES
TOP SECRET CONTROL NUMBER
160426
ANNEX "B" s OPERATION'S PLAN 42-59
1 April 1959
SECflET
Sanitized - Approved For Release : CIA-RDP33-02415A000100190004-5
Sanitized - Approved For Re 4 C I p415A000100190004-5
25X1 C4a
1 April 1959
25X1 C4a
Annex n}3", Operations Plan 42-59
"LOGISTICS:"
1. SUS PPI :
a. Fuel for U-2 aircraft will be propositioned/or accompany
Deployment Force as dictated by total weights involved. Fuel will
be obtained from existing storage points as directed by Project
"Chalice" Headquarters. Support aircraft will refuel as necessary
to complete mission,
b. Minimum aircraft and equipment spares to support one
U-2 mission will be withdrawn from Flyaway Kit at
and moved by support aircraft. Packing and marking will be IAW
Unit Mobility Plan. (See Appendix 7) (List of FAK requirements,
Appendix 1)
c. Minimum equipment to support one U-2 mission will be
25X1 C4a moved from
25X1 C4a
by support aircraft. Packing and
marking will be IAW Unit Mobility Plan. (See Appendix 7) (List of
Equipment.. Appendix 2)
d. Personnel involved will eat and sleep with support
aircraft. Blankets, sleeping bags, and IFR's will be provided by
Unit Supply,
TS 160426
Copy ?1 of 5
Sanitized - Approved Fbr''~RIleaE . QU33-02415AO001 00190004-5
aff
Sanitized - Approved Fo pseS E-E!T3O24l 5A0001 00190004-5
e. Supplies and equipment accompanying the operation will
be minimum to support one U-2 Mission (Special Equipment, ELINT,
25X1 B6a Weather, or M and Ball Sampler) Concept of maintenance provides
for no major disassembly or repair of aircraft or equipment during
period of operation. Time allowable will provide at most only for
installation and pre-flight check of equipment involved.
2. TRANSPORTATION:
a. Aj s
(1) USAFE will provide necessary C-130 support aircraft
to airlift supplies, equipment and personnel.
(2) C-130 aircraft will make only necessary stops for
refueling.
25X1 C4a
(3) USAF will direct USAFE to provide required amber
of C-130 aircraft plus one spare C-130 at or other
location during conduct of operation.
b. Ground s
No surface transportation required.
3. SERVICE:
Medical: Medical support will be provided from Detachment
10-10 resources. Personal Equipment and pre-breathing facilities will
be setup in support aircraft.
b. Maintenances
(1) Maintenance will be conducted from C-130 support
Sanitized - Approved For TEOPe :SEJ
TS 160426
Copy -I- of 5
10241 5A0001 00190004-5
Sanitized - Approved F T pas !I830241 5A0001 00190004-5
(2) Maintenance wil.1 provide suitable security
shelters for loading and unloading of mission equipment if required.
(3) Fuel for U-2 will be pumped directly from barrel
to aircraft using MA..2 compressed air for pump activation*
c. 'it Finance matters will be as directed by
25X1 C4a Commander,
25X1 C4a
4- PERSO_I L$
a, Personnel required for Deployment (List of personnel,
Appendix 4)
b. None
c. None
d. No mail will be posted by individuals from any
deployment site.
5. MISCELLANEOUS, 25X6C
25X6C Headquarters, will remain at M
APPENDICES, Appendix 1 - SUPPLY
n 2 - EQUIPMENT
3 - TRANSPORTATION (NOT REQUIRED)
n 4 - PERSONNEL
5 - PERSONNEL RECAPITULATION (NOT REQUIRED)
6 . CARGO RECAPITULATION
7 - PACKING, CRATING AND MARKING
TS 160426
Copy _j_ of 5
Sanitized - Approved For11 a ,SEMT02415AO00100190004-5
Sanitized - Approved For Release : CIA-RDP33-02415A000100190004-5
TOP SECRET
Sanitized - Approved F f pas$ i '33-02415A000100190004-5
Sanitized - ApprJdQ Por QA-RDP33-02415A000100190004-5
25X1 C4a
1 April 1959
Appendix 1 to Annex "B", Operation Plan 42-59
1. MAINTENANCE:
a. Pre-Strike s
ITEM NUMBER
1-0508
1-0509
1-0233
1-0232.1
1-0364.1
1-0414.2
8-0455
8-0451
8-0452
7-2040
7-2045
7-2050
5-0377
8-0378
NOUN
Wheel W/Tire Mounted
Wheel, Tail Gear
Amplifier, Mag.
Amplifier, Tailpipe
Inverter
Rheostat Face Plate
Circuit Breaker, 5 Amp
Circuit Breaker, 10 Amp
Circuit Breaker, 15 Amp
Fuse 250 V j Amp
Fuse 250 V 1 Amp
Fuse 250 V 2 Amp
Packing "0"
Rings
Packing 110" Rings
Appendix 1 to
AMOUNT REQUIRED
2
1
4
COPY 1 OF 5 COPIES
TOP SECRET C0i1TROL NUMBER
160426
Annex "B", Operations Plan
1 April 1959
Sanitized - Approved For Release : CIA-RDP33-02415A000100190004-5
Sanitized - Approved For' e5 i(I E -02415A000100190004-5
a. Pre-Strike: (Conttd)
8-0373
8-0322
8-0321
8-0323
8-0605
8-0606
8-0607
8.0607 .1
8-0602
8-0603
1-0390
1-0051
7-0030
1-0231
1-0231.1
1-0264.1
1-0230
1-0394
9-0112.1
1-0252.3
1-0272
Packing "O" Rings
Packing "0" Rings
Packing 110" Rings
Packing "0" Rings
Packing Teflon
Ring Hyd., Back Up Teflon
Ring Hyd., Back Up Teflon
Ring Hyd., Back Up Teflon
Ring Hyd., Back Up Teflon
Ring Hyd., Back Up Teflon
Hydraulic Pump
Cyl. Act. Dive Flap
Battery (Flashlight)
Amplifier Control, A/P
Amplifier and Dir. Gyro Compass
Controller Mach
Amplifier, Elect. Cont.
Refrigerator
Battery, MA-2
Fan Defrost
Amplifier, Trim Servo
Appendix 1 to Annex "B"
Operations Plan 42.59
1 April 1959
TS 160426
Copy '1 , of 5
Sanitized - Approved For RI:
QP- 2415A000100190004-5
The
Sanitized - Approved For Reeop CIRK P11 ry 415AO00100190004-5
b. Post-Strike:
1-0508
1-0509
1-0233
1-0232,1
1-0364.1
1-0414.2
8-0455
8-0451
8-0452
7-2040
7-2045
7-2050
8-0377
8-0378
8-0373
8-0322
8-0321
8-0323
8-0605
8-0606
8-0607
Wheel W/Tire Mounted
Wheel, Tail Gear
Amplifier Magnetic
Amplifier, Tailpipe
Invertor
Rheostat, Face Plate
Circuit Breaker, 5 Amp
Circuit Breaker, 10 Amp
Circuit Breaker, 15 Amp
Fuse 250 V J- Amp
Fuse 250 V 1 Amp
Fuse 250 V 2 Amp
Packing "0" Rings
Packing "0" Rings
Packing "0" Rings
Packing "0" Rings
Packing "0" Rings
Packing "0" Rings
Packing Teflon
Ring Hyd., Back Up, Teflon
Ring Hyd., Back Ups Teflon
Appendix 1 to Annex "B"
Operations Plan 42-59
1 April 1959
TS 160426
Copy -1- of 5
Sanitized - Approved For TOP : I- . D2415A000100190004-5
Sanitized - Approved For TELOPe :S C T02415A000100190004-5
b. Post-Strikes (Gont'd)
8-0607.1
8-0602
8-0603
1-0390
1-0051
7-0030
9-0112
2. Sys
Ring Hyd., Back Up, Teflon
Ring Hyd., Back Up, Teflon
Ring Hyd., Back Up, Teflon
Hydraulic Pump
Cyl. Act., Dive Flap
Battery (Flashlight)
Battery, MA??2
a. Pre-Strikes
Blankets
Bags, Sleeping
IFR-7
b. Post-Strike:
Blankets
Bags, Sleeping
60
25
40
15
125
Appendix 1 to Annex "B"
Operations Plan 42-59
1 April 1959
TS 160426
Copy I of 5
Sanitized - Approved For 70e :k T02415A000100190004-5
Sanitized - Approved FOTOPseS E'CE'1'3-02415A000100190004-5
Sanitized - Approved Fo"fksfJg 02415A000100190004-5
25X1 C4a
Sanitized - Appr v
r Q ' A-RD
I" In
1 April 1959
Appendix 2 (Equipment) to Annex "B", Operations Plan 42-59
"EQUIPMENT"
1. MAINTENANCE:
a. Pre-Strike:
NOUN AMOUNT REQUIRED
MAr2 #GL45, W/Radio 1
Nitrogen Bottle 1
Pogos, Set 1
Tow Bar 1
"A" Frame & boom for equip. hoist 1
Auto Pilot Test Equipment
Hydro Pot
MIG Wheel Chocks
Engine Oil, case
Hydro Oil, case
Wheel Ramp MIG
Portable Spot Lights
100 ft rope 3/4 inch
Stakes Wood 1k x 1 3/4 x 24
24 inch pipe wrench 1
COPY 1 OF _, COPIES
TOP SECRET CONTROL NUMBER
16o426
Appendix 2 to Annex "B", Operations Plan
1 April 1959
0004-5
Sanitized - Approved For Release : CIA-RDP33-02415A000100190004-5
Sanitized - Approved ForWeSj