IDEALIST OPERATIONS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP33-02415A000100390096-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
October 7, 1998
Sequence Number: 
96
Case Number: 
Publication Date: 
January 7, 1963
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP33-02415A000100390096-2.pdf94.64 KB
Body: 
Approved For RJpas 2001/08/15 ti i i33-02415AW 100390096-2 3JN1963 MEMORANDUM FOR: All Divisions, Staffs and Branches SUBJECT : IDEALIST Operations 1. In an effort to portray the various possible combinations of aircraft deployment with associated personnel, equipment and costs within the IDEALIST Program, you are requested to complete the attached form regarding your respective areas of interest for each of the combinatioina. 2; Costs should be confined to Fiscal Year 1963. Please asterisk or note any personnel, equipment or cost increases not included is FY-63 approved operational program or available from current assets. 3. You: are requested to add pertinent information or remarks and to coordinate overlapping areas of interest with the appropriate office. Completed forms should be returned soonest to Chief/Programs Staff. ' O/AD/OSA:JNMCM:js (4 Jan 63) Distribution: All Addressees Attachment as stated IDEA 0977-63 Copy of 5 COLONEL, USAF Assistant Director (Special Activities) Approved For Release 2001/08/15 : CIA-RDP33-02415A000100390096-2 Approved For R gasp 2001/08/15 : 3-02415AQQQ10Q390096-2 Attachment to IDEA 0977.63 1. Combinations A. Seven Aircraft - one permanent detachment with two aircraft; one detachment (Edwards) with a dual operational staging capability utilizing four aircraft; remaining aircraft for testing and rotational maintenance at LAC. 25X1A6a B. Seven Aircraft - one permanent detachmen with two aircraft; one detachment (Edwards) with a single operational staging capability utilising two aircraft; one back-up staging capability utilising one aircraft; remaining two aircraft for testing and rotational maintenance at LAC. 25X1A6a 25X1A6a C. Nine Aircraft - two permanent detachments with four aircraft; one detachment (Edwards) with a single operational staging capability utilizing two aircraft; remaining three aircraft for testing, rotational maintenance and back-up operational aircraft at LAC, 25X1A6a D. Nine Aircraft ? one permanent detachment with two aircraft; one detachment `Edwards) with a dual operational staging capability utilising four aircraft; remaining three aircraft for testing, rotational maintemace and back-up operational aircraft at LAC, 25X1A6a E. Nine Aircraft ? two permanent detachment utilizing four aircraft; one detachment (Edwards) with a dual operational staging capability utilizing four aircraft; remaining single aircraft for rotational maintenance at LAC; no testing capability. 25X1 A6a F. Nine Aircraft w one permanent detachment utilizing two aircraft; one detachment (Edwards) with a dual operational staging capability utilising four aircraft; remaining three aircraft for testing, rotational maintenance and back-up operational aircraft at LAC. Approved For Release 2001/08/15 : CIA-RDP33-02415A000100390096-2