PLAN FOR REFURBISHING(Classified)EQUIPMENT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP33-02415A000200050006-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
November 17, 2016
Document Release Date:
November 23, 1998
Sequence Number:
6
Case Number:
Publication Date:
September 19, 1966
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 38.43 KB |
Body:
Approved For Release 2000/08/21 : CIA-RDP33-02415A000200050006-7
19 September 1966
25X1A6a
SUBJECT: Plan for Refurbishing Equipment
1. The attached letter presents the OSA plan, as
briefed to D/SA, to rectify the materiel situation at
25X1A6a Action is considered necessary at
this time in order to prepare the materiel and facilities
25X1A2g for possible activity in the launch of Project
during early 1967.
25X1A6a
2. Historically, the maintenance of the Project
facility and equipment at has been unsatisfactory.
This has been due to the lack of a project directed monitor
on the spot and the difficulties have been compounded by
obstacles interposed by the political situation which has
obstructed past efforts to send in maintenance teams.
3. This plan enables us to perform necessary
25X1A6a maintenance at where maintenance teams can
be sent with relative ease. This plan, when consumated,
will provide us with a basic set of equipment which can
25X1A6a be used for support of The equipment can be
augmented, as required, before actual deployment to
25X1A6a
25X1A6a 4. The plan was sent via cable to
on 13 September 1966.
25X1A9a
Colonel USAF
Deputy for Materiel, OSA