CONFIGURATION CONTROL BOARD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP33-02415A000400050042-5
Release Decision:
RIFPUB
Original Classification:
T
Document Page Count:
2
Document Creation Date:
December 15, 2016
Document Release Date:
August 1, 2003
Sequence Number:
42
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 83.73 KB |
Body:
-MCP SECRET
Approved For Refs
tIA-I f O2 1 AO 00050042-5
COQ, . ! ~:LCOPT ;OL BOARD
I . P JRPO
The purpose of this Configuration Control Board 1S to insure, exreCi:Lte-:,
and fo17:_al:Lle coordination between the Director, Special Projects and the
Central Intelligence Agency concerning; the activities and changes `?('14.L
ch
affect the payload, the on-orbit operation of the payload and the content
of the final ;product.
I I . % P; JE ST' IP
The Configuration Control Board. will be constituted from representatives
of the participating organizations. The chairman will be appointed by the
Directory Special Projects. The me--.ioersni,O o f the board shall include an
individual representing payload technical considerations, an individual
representing mission planning and orbital operations, and an individual
representing the using community.
I. E3 SpOi`rSIBI?_~ITIBS
The Chair pan of the Cony. igwra. pion Control Board is re ponsibl? for all.
h~7"l..iCu"1. decisions gild Cr h n
their
~eC the l on-14
l 4Ulc^ Con-
trol Board. The chairman must in- ojmz the other m(Lembers of the board of f p
ro -
posed ore"rational or conf - "_ ration c an_ges and obtain their concurrence or
c t 't
objections before ~_ t~_ 1e G C.irr!?E.'S for ~ ~:iy,~,Le;;'_CntC.t7.Cn. The other
members of the board are responsible _or recom",'i:Ci.in those changes in heir
particular areas of interest, which will improve the perfo"_^ ;,nce, reli bi ~Z'
or
,,".ES1:.._tS their V=r-?;TC_L t and Cl or COO'":.i1at.n these rro_
posed changes with their -1'esrective activities.
f~lA-~FA1,,Qd0400050042-5
NRO review(oI$i!e2~: Release
Approved For Release 2003/09@:P- GIX FUfi12415A 0400050042-5
V.
Con.f i.guratiorl Control 17oard mee in s will be held at 2p ro , .ma elm!
one month intervals or as reCSuired to review progress results and proposed
cl1ang;e s. Formal Configuration Control Board coordination will normally
be accomplished at these rllee tints. This coordination nay be accomplished
by signature on appropriate documents such as rmemor. andu:2s -letter s y and
minutes of the race{ ir_" or technical directives, These Droposed cyan