REVISION OF RADAN PROPOSAL TO BE SUBMITTED BY GENERAL PRECISION LABORATORIES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP57-00011A001000080029-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 7, 2010
Sequence Number: 
29
Case Number: 
Publication Date: 
March 22, 1956
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP57-00011A001000080029-7.pdf39.86 KB
Body: 
Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011 A001000080029-7 ropy ... of VrW,,'.A':;ftTMt !MR TRP r E(ORD 8';BJ;-CT t Revision of fadan Pmposal To is Snbai; tad by Oneral Precision Laboratories I. As a remit of discussions hold with foilowirw: R. k. 8issells R. L. Clark and it has becose apparent that the Project requir t for Radon exceeds the two units requested in prhvioj;s meetings with GPL. The total figure finally arrived at was six, This asslaes a requirement of one or two taiits and two base operatirn of the k8mlor aircraft. 2. Therefore APL was reg9:eeted ulo a telcnhont conversation to alter their proposal to include the followings a. Two (!) Radon seta with spares necessary for a flyaway kit and 180 day operation from a single baseo b. For (4) Radon sets 04. th a f~ yuay kit and spares for 180 day operaticn fr a two basers. e. Two (2) Radon sets without any kit or spares, d. Tech-representative services on a per-mar-aonth basis. 3. This proposal should be ceeleted by 22 March 1956. 4. of GPL has been requested to send the Project copier of the Radon eabling diagrams and instrument and control pan1 Installation drawings* 1 7 3 4 reap K Reradire Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011 A001000080029-7