CENTRAL INTELLIGENCE AGENCY CONTRACTING OFFICER'S DETERMINATION AND FINDINGS AUTHORITY TO USE COST-PLUS-A-FIXED-FEE TYPE OF CONTRACT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP57-00011A001000080045-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
December 7, 2010
Sequence Number:
45
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 52.91 KB |
Body:
Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011A001000080045-9
SAFC-!1693
CopyJ of 5.
MTFAL INTELLIGENCE AGENCY
C0NVACTINO OFFIC&t 15
DEMMIWATI ON AND FINDINGS
AUTHORITT TO USE 0WT-PLUS-A?.FIXFD FEE TYPE OF CCNWAC?
Upon the basis of the following findings and determination which
I hereby mks as Contracting Officer pursuant to the provisions of
Public Lay 134, 81st Congress, and authority delegated thsrwndar,
the proposed contract described below say be entered into on a
cost-plus-+a-f ixed..fee basis.
1. The proposed contract with Eastman Kodak Cosparw, Rochester,
New York, for engineering and technical services to study .requirements
of the Government for specialised film processing and data recording
operations and preparing engineering design for such equipment and its
installation, has an estimated cost of $!!00,187.00 plus a fixed-fee of
9,513.00, which is 7% of the astimated cost exclusive of fixed-fee.
2. The exact nature and extent of the engineering and technical
studies necessary to obtain the design requirements of the Government,
and the precise method of performing these services cannot be estab-
lished in advance, but mat be freely subject to improvisation and
changes as the work progresses*
3. the costs of performing the work under the proposed contract
cannot be accurately forecast so as to permit the undertaking of such
work for a fixed price.
DET ATI0N
1. It is impracticable to secure services of the kind or quality
required without the use of the proposed type of contract.
2. That the use of a cost-plus-arfixsd fee type of contract is
more than likely to be less costly than other methods of contracting.
Distri 1ution:
Orig' Master N-95
2- " S?rvice
3 - Finance
4s i,.lip
'
- -' Chrono (3F' :hh
225X1
Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011A001000080045-9