MEETING AT WESTINGHOUSE AIR ARM, BALTIMORE, REGARDING UTILIZATION OF RADAN WITH APQ-56 TYPE RADAR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP57-00011A001000090115-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 7, 2010
Sequence Number: 
115
Case Number: 
Publication Date: 
April 4, 1956
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP57-00011A001000090115-0.pdf104.48 KB
Body: 
Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011 A001000090115-0 4 April 2936 RARUM FOR THE RTC = SI JECT s Meeting at Westinghouse Air Arts Ra1tiators, Regarding Ut3liration of Radati with APQ.56 Tgpo Radar 1. ?,,,M ; " 2L ft&UUS The asating was geld 3 AP-11 19% in the Zngin:ring Office of Westinghouse Air Atay biesdship Airport. 2? l#r.~dFig3i t s* Westinghouse Westinghouse GFL Pro j eat ProJeot 25X1 i a. Befbre arri,Ted,l 8aVs the Pro ' sot 25X1 personnel a or e portions of the plant producing the Project equipsent. Item camber 1 will be oon l etoly amisabled by 7 April and then uaderV ammponsnt and asaably tests. gates tests will be s dated by 15 I4o y. rsooaaarnded Immediate shipment to Loused for installs, n. .e alt that plant training, if desired, should take place at i tt rtcwu with itrus I or at Friend-? ship with iteis 2. If the fbrawer is desirable, seeurity alearanses for Westinghouse pilots and crew chief on the 847 should be initiated at ones, Also arrangements should be aide to clear the E I-17 into Watertown. In sap event, if pilot training on the P,?17 is desired, approval of the Air Fares raiment officer win be required* b. cry xnw was will infored that Oamaaro is processing the TWX machine in his plant. the neosam? When arrived, he proceeded to t~dcist 25X1 and Rsdan details that would be o LOA-1 that. reci procated by outlining the APQ.56 f eatures 25X1 that concerned .L. d. As a result of these discussions, both G.P.L. and Westing. house teal that eospletely aut natie data transfer from Radsn to the APC -56 is possible, It will tutail a revision of the APQ. % Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011 A001000090115-0 Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011 A001000090115-0 SLh, . T: Meeting at Westiagh use Air Arst, 'ralt1siore, Ftegsrding t?ti? ration or Paden with APO--56 Type Racer control panel as well ass ssibis cation to the Radan in- soli dicator unit. re to glom a method of 25X1 attack for Promes recoame sppanapriate action. present when the two systems were ccabined. This otaobinsd system would have available within its "flask boaass" signals proportional to distance, in xd1ca, traveled in an assured direction of flight and V is distance, also in elves measured at right angles to this ]ins, the aircraft bas drifted. The weight penalty fbr brining tl-is information out in counter form for the pilot's use is navigating will probably be lose than taro pounds. was 25X1 requested to pursue this matter and sutaait a preposai r neosssary equi cent modification, f. wra gig three signed cos a of letter 25X1 Contra or tranamittt1 to at G.P.L. 25X1 After reading tbeey reason for any ^.ueetions or 25X1 ob,ections to be see vas rarueeted to return two 25X1 signed Copiers as soon as possible. 4. ARU2 : a. Westinghouse is to explore the recuireents for eouipaaent changes to make Fadan and APO-56 Radar a table. b. G.F.L. is to return the signed contract as soon as possible. c. The Project is to make arran is for pilot training using the AFO.-56 in the F-l?. Distribution: Orig. - Enuime taster 2 - Mastsr 3 - Fi. F smell r. 4 - Ghros 5 - Pending ~,AK:kjv (4/5/56) e. As an out growth of the discussions of Fadan AFQ-56 come.. 25X1 25X1 Sanitized Copy Approved for Release 2010/12/07: CIA-RDP57-00011 A001000090115-0