WEEKLY ACTIVITY REPORT NO. 11 - (Sanitized) PERIOD 8 THROUGH 14 MARCH 1955

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP58-00039A000200010207-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 19, 2016
Document Release Date: 
September 28, 2005
Sequence Number: 
207
Case Number: 
Publication Date: 
March 15, 1955
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP58-00039A000200010207-1.pdf92.22 KB
Body: 
SECRET Approved For Releas&2005/11/17 : CIA-RDP58-00039AO002QZO10207-1 15 March 1955 M 2IOF?ANDUM FOR: Chief, Operations School Weekly Activity Report No. III 25X1 Period 8 through 14 March 1955 I. SIGNIFICANT ACTIVITIES: a. Nothing to report. II. OTHER ACTIVITIES: a. The student evaluations for Clandestine Operations Course (COC) No. 6 are being processed. All instructors' work on these evaluations was completed on 10 March. A revised evaluation form has been drawn up d h an as been approved by the Assessment and Evaluation representative, b. A total of 76 students reported for Clandestine Methods and Techniques (CMT) Course No. 12 registration on 7 March. 25X1 i~_1 join the course on 28 March to complete that portion of CMT 11 which he missed.) c. Seminar Advisors participating in GMT for the first time are e. On 8 March the Communications Committee conferred with the Assistant Chief for Field Training regarding presentation of the sub- ject in seminars. was launched on 8 March. g. Presented the Reporting Lecture, substituting for who unfortunately was unable to be present. 25X1 Approved For Release 2005/11/17 : CIA-RDP58-00039AO00200010207-1 S1CRET SECRET Approved For Release 2005/11/17 : CIA-RDP58-00039AO002QO010207-1 h. I joined CMT #12 on Saturday, 12 March, and was briefed by Messrs. lie will 25X1 receive additional tutorial assistance in order that he may make up for loss of the first week of the course. i. I I conferred regarding the scheduling o special training for two students who will take a course combining CMT and Air Operations Course. j. 25X1 of AOC supported the CEff Observation Problem during the afternoon of 9 March. k, TSSIwas present on 10 March to present a lecture to CMT on Cover Authentication - Documents. 1. From 1300 on 7 March to 1200 on 9 March AOC Staff members gave tutorial instruction and practical exercises in Packing and 25X1 Loading for air drops to a special Logistics student. m. on Tuesday, 5 March, to participate in the War Plans Staff Course. n. resented the second and final week of tutorial training tol PP/Pig Staff. 25X1 o. The staff study on TSS testing sites was completed by TSS,O 25X1 and sent to the AF/OS. A discussion of the study was held on 10 March. The AF/OS requested that an investigation be made of an alternate site, which had originally been desired by TSS representatives. However, the alternate proved to be too far removed from present electricity lines. A final conference with will be held on Wednesday, 25X1 16 March. Following that conference a request for construction will p. A survey of films desired for permanent retention or return to Graphics/OCD is being made. 25X1 Approved For Release 2005 ,U17 : CIA-RDP58-00039AO00200010207-1 CONFIDENTIAL Approved For Release 2005/11/17 : CIA-RDP58-00039AD00200010207-1 25X1 25X1 military leave. ROC} returned on 14 March after two weeks, 25X1 25X1 v. I ITS 25X1 ` S fwas present on 10 March to confer with 25X1 Approved For Release 2005/11/17 : CIA-RDP 00039AO00200010207-1 `S` CONFIDENT111-