CIA/RR-G-15, Comments On

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP60-00346R000100290005-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 9, 2016
Document Release Date: 
July 6, 1998
Sequence Number: 
5
Case Number: 
Publication Date: 
March 29, 1957
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP60-00346R000100290005-5.pdf164.16 KB
Body: 
Sanitized - proved For Release : CIA-RDP61),00346R000100290005-5 ch and Reports 29 larch 1957 Chief, Ooography 15, dents O Q-15 and PR-70 on -e or essentially couplete intl. T b* main el nt of difference is Lal construction c aeity which in higher in with a member of the Shipbuilding Branch problem in its proper framework, it should be zed at the outset that there is no figure on the actual tion capacity of the shipyard. All available figures are s derived on the basis of a-s ptione that use numerous xperiences in US shipyards on the skills of the labor rocedures, methods of construction, etc. The margin of ibis, and there is a good deall of controversy on fact, the 110 Shipbuilding'gxbconm ittee is currently on methodology for estimating ship construction e of the inability to achieve agreement on methodology, u ng devised to satisfy ed. thod . 1 is b he .vy Department for maximum potential caapacity, is intended to cover the requirements for economic ion capacities. estimates for a "theoretical but realist on of naval or cargo vessels at the Mo1otovsk d. lowever, In deriving these estimates, -70 arbitrarily tee itself to the assn tiozi that the yard is operating on a -shift b is. "et, VR-70 itself acknowledges that work was reported ed on in three shifts as late as 1949 -- presumably the date n on this subject. rking up the brief on this yard, our analyst found PR-70's a Qnes-shift basis to be a bit too theoretical and decided to ite -- the only estimate available on the resolves itself into a question of judgment risible analyst. We feel that his decision was correct in-view of the scope of his assigned problem. G-15 ntended to be an exhaustive discussion limited to the present-day Sanitized - Approved For Rele P60-00346R000100290005-5 Sanitized - Approved e : CIA-RDP6Q.00346R000100290005-5 a brief survey outlinin Va or tne v n. A serve to illustrate out point of view being used by two or three two-engine transpa, field las been recently nstru.cted in t layout and facilities of the field all to focus on the latter fact -- its awn ent limited utilization. k shipyard capacity figure that vas Navy still adheres to as their official otovsk shipayard 25X1A9a use by 20 or 30 heavy bombers simataneously. Sanitized - Approved For Release : CIA-RDP60-00346R000100290005-5 d F .