Proposed Reorganization of the Signal Center

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP60-00538A000100020004-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 11, 2016
Document Release Date: 
August 28, 1998
Sequence Number: 
4
Case Number: 
Publication Date: 
December 19, 1956
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP60-00538A000100020004-9.pdf144.21 KB
Body: 
Sanitized - Approved Fow~ ON" 6~Oy-Q053,*AQ100020004-9 L U n ff -a,," -7 MEMORANDUM FUR THE RECORD: 19 Dec 1956 SUBJECT:. Proposed Reorganization of the Signal Center 25X1 Aga 1. In response to a statement by upport, Office of Communications to the a ec at Chief 25X1A9a of the Signal Center had a problem up ou - use some management assistance I conferred wit this morning 25X1A9a to determine the nature of his proble 25X1A9a 2. stated as follows: a. That the increase in traffic in the Signal Center makes it imperative that some reorganization be made in the. structure of the Signal Center without a change in the overall ceiling. There has been a substantial increase in traffic from 10,500,000 groups for 1950 to 62,000,000 in 1955 and an estimated 72,000,000 groups for this calendar year. b. At present he has two(2) GS-13's on the day shift covering the Signal Center Officer Staff which does not give him sufficient remaining personnel to cover the other shifts throughout a seven day schedule on a 24-hour basis. kED noted that his force was working this way an~7 nnin+o~i ut that it was not in compliance with his T/O. stated that it has been necessary for him to j order to provide adequate coverage for the critical day 25X1 A9< -. shift. He stated it is also necessary to have two Signal t- z,, Officers on the 4 to 12 shift because of the traffic volume F, .? a,,a +'t,..,+4?1,.,. .w_..~r. -? -- --'' --- , . . . -- . -- rn that this action represented a proposed change in his structure present time was somewhat extensive. PhD' then advised 25X1A9a and asked him to take the matter up with the Management Staff. ri k 9 I 4 Because of the need for more than one Suter Officer to I r-, f f ~ ;; supervise the traffic on certain shifts, feels it is advisable to establish four to five positions as Deputy 25X1A9 `:Signal Officers at the GS-12 level in order to handle the increased traffic and particularly the supervisory work required. In order to acommodate these positions he stated he would take the slots, if permissible, from the Manual Cipher Section. d. He would also like to reorganize the Manual Branch and the Machine Branch to reflect five GS-11's in each Branch so as to ensure the necessary type of supervision required on a shift basis. 25X1A9a 3. I asked again about his ceil Sanitize W-Pproved For Fj LeA I l'A00 I 020004-9 Sanitized - Appro4ved For Release : CIA-RDP60-00538A000100020004-9 had requ onal 20 slots from the Support Staff of Coffino for lower level po in order to 25X1 A9a handle t rld-wide traffic. was under the impression that the ceiling increase for such positions 25X1 A9a was not related to the internal reorganization of Signal Center supervisory positions but I pointed out that it was most advisable to consider the entire Signal Center organization for purposes of our study so that we could come up with a proposed study that would carry the organization as far ahead as possible. 25X1A9a 4. ~ deputy made a remark during effect that at least 60% of the traffic passing passing thru to ih~ h~ 25X1A12 Signal Center constitutes traffic for this organization t that there was some discussion from the Pentagon iasto whether or not we should have our own facility. 25X1A9a 5. I mentioned to _ that our oal 25X1A9a study was o make as complete a y as possible so that it would best serve the interests of the Communications Office and for future planning 25X1A9a and reference purposes. I asked to compile the following data in rough form as soon as convenient: a. Record of Overtime worked in the Signal Center. b. Proposed T/O in rough form. c. Data . as to how much traffic a Signal Center Officer would be expected to handle on any one shift and justification as to why the reorganization was necessary. indicated that he would not be out of town during the o ays and that he would try to have the data ready next week for discussion. Since P~ made a complete classification survey of the ignal Center recently, including personnel working on the night and week-end shifts, I shall talk to them in detail converning their ideas relative to workload and solicit any remarks they may wish to offer. 25X1A9a 25X1A9a Sanitized - Approved For Release : CIA-RDP60-00538A000100020004-9