CURRENT SUPPORT MEMORANDUM 'LEAP FORWARD' IN RAILROAD CONSTRUCTION DURING CHINA'S SECOND FIVE-YEAR PLAN (1958-1962)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP61S00527A000200120015-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 16, 2016
Document Release Date: 
March 21, 2005
Sequence Number: 
15
Case Number: 
Publication Date: 
August 26, 1958
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP61S00527A000200120015-7.pdf216.98 KB
Body: 
Approvecllf~or Release 2005/04/21 : CIA-RDP61SO0627A000200120015-7 ch p /,S CSM No. 602 Copy No. '73 26 August 1958 CURRENT SUPPORT MEMORANDUM "LEAP FORWARD" IN RAILROAD CONSTRUCTION DURING CHINA'S SECOND FIVE-YEAR PLAN (1958-1962) OFFICE OF RESEARCH AND REPORTS CENTRAL INTELLIGENCE AGENCY This report represents the immediate views of the originating intelligence components of the Office of Research and Reports. Comments are solicited. This document contains information affecting the national defense of the United States, within the meaning of the espionage laws, Title 18 USC, Sections 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. Approved For Release 2005/04/21 : CIA-RDP61 SO0527A000200120015-7 Approved or Release 2005/04/21 : CIA-RDP61 S0V@27A000200120015-7 "LEAP FORWARD" IN RAILROAD CONSTRUCTION DURING CHINA'S Current activity in new railroad construction in Communist China indicates that both the original 1958 and Second Five-Year Plan (1958-1962) goals for new line will be overfulfilled con- siderably. The.original 1958 plan scheduled a capital investment of 1.52 billion yuan for railroads and seta goal of 1,290 km of new lines to be constructed during the year, both well under the totals in these categories in 1956. 1/ By mid-1958, 640 km of new lines Urumchl T"haven 196' HeIen81a~'{ BARM A 8haokuan hnu-- C~ -1959 6PL 3- i cna ~n817ea~' Construction of New Railroads in Communist China 96 Existing railroad network New lines under construction, August 1958 ??????^?^? New lines projected to start construction by end of 1960 1961 Announced or estimated completion date had been constructed. 2/ On the basis of past performance--in 1956 only 500 km of the years total of 1,747 km were completed by mid-v year 3/ -China should lay between 1,500 and 2,000 km of new track in 1938. The original version of the Second Five-Year Plan called for the completion of 8,000-9,000 km of new line, roughly twice the a- mount planned in the First Five-Year Plan. 4/ The acceleration of current construction--exemplified by completion of the Paotou- Lanchou line, expanded 1958 tracklaying goals for the Trans-Sinkiang and Neichiang-Kunming lines, the start of construction on the 3,000- km Fukien-Yunnan and the 1,400 km Chengtu-Pukou lines--and the pro- jection of an additional 5,000 km of new lines suggest that;:con- _ siderable overfulfiliment of the original tracklaying goal in the 26 August 1958 CURRENT SUPPORT MEMORANDUM 602 Page 2 Approved For Release 2005/04/21 : CIA-RDP61 SO0527A000200120015-7 Approved Release 2005/04/21 : CIA-RDP61 S001lA000200120015-7 Second Five-Year Plan is in prospect. In March 1958 the Ministry of Railroads stated that 10,000 km of new lines would be constructed dur- ing the period, and that the construction cost per km would be lowered from 566,000 Yuan to 400,000 yuan. 5/ Supporting this sharply boosted goal was a July 1958 announcement by the Railroad Engineering Corps of the People's Liberation Army that it would lay 10,000 km of track in the Second Five-Year Plan, or double its previous goal. 6/ If the corps is used, as in the past, on exclusively mainline construction, and if it builds 40 percent of all new lines as it did in the First Five-Year Plan, then a total of 25,000 km (roughly three times the original Plan) of new line will be built during the next five years. This figure is obviously too high and suggests either that the corps will do less than its programmed 10,000 km of new lines or that the corps will perform well over 40 percent of total new lines construction (thus diminishing the role of ministerial construction cadres in the field), or both. It is believed that some 15,000 to 20,000 km of new line will be constructed during the Second Five-Year Plan. The orientation of present and projected new line is as signi- ficant as the increased tracklaying goal. Both the increased build- ing and its orientation are doubtless designed to help effect the current "giant leap forward" in economic development. Orientation of new lines has these characteristics: 1. Lateral lines, chiefly east-west, are being con- structed which will bring a greater measure of mobility to the existing, predominantly north-south, trunk routes. 2. Cutoff lines are being constructed or are planned to be constructed to shorten runs on important routes both in distance and time, by making it possible for through trains to avoid heavily used junctions such as Tientsin, Mukden, and Tatung. 3. Lines are under construction which will link the transport-poor Southwest with the existing railroad network. 4. Local authorities are being encouraged to con- struct short, low-capacity railroad branches and spurs for industrial, mining, forestry, and agricultural use. 26 August 1958 CURRENT SUPPORT MEMORANDUM 602 Page 3 .Approved For Release 2005/04/21 : CIA-RDP61SO0527A000200120015-7 Approved Release 2005/04/21 : CIA-RDP61 S00A000200120015-7 25X1 Analyst: Sources: 26 August 1958 CURRENT SUPPORT MEMORANDUM 602 Page 4 25X1A9A Approved For Release 2005/04/21 : CIA-RDP61 SO0527A000200120015-7