TENTATIVE(Classified) RESEARCH PROGRAM FOR FY '54
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP61S00750A000700070217-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 9, 2016
Document Release Date:
October 6, 1998
Sequence Number:
217
Case Number:
Publication Date:
January 1, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 111.69 KB |
Body:
Approved For R lease 2001/0 61 S00750W 0700070217-6
SECURITY INFORMATION
Tentative Research Program for FY'54
1. Projects in process (described in Tab C) to be completed in FY'54:
a. Forced Labor in the USSR.
Of a apprpprov
oved for this project, an estimated balance
25X1A1a of - remained on 30 June 1953 with which the project
will probably be concluded by September, 1954.
b. Patterns of Soviet Take-over and Control.
25X1A1a
Of approved for this project, an estimated. balance
25X1A1a of -remained on 30 June 1953 with which the project
will probably be concluded by October, 1954.
c. Social Tensions in Communist China and Sino-Soviet Relations.
2?XlAla
PRC a proved this project in the amount of -0
25X1A1a which was to be available in FY'53 and the remainder
in FY'54. Actually, an estimated was spent in25X1A1a
FY'53, hence a total of about is available for FY'54.
25X1A1a
2. Projects Under Consideration at Present:
a. Study of Scientific Education in the USSR.
Description: An evaluation of the quality and character
of the education of scientists and engineers in the USSR, with
a view to improving our estimates of the capabilities of the
Soviet scientific and engineering professions and to estab-
lishing methods for future evaluation of foreign educational
systems.
This project is sponsored by the Office of Scientific
Intelligence, has been approved in principle by the Deputy
Director of Intelligence, and is bein resented to the PRC
for approval. Proposed cost:
25X1A1a
Approved For Release 2001/08/17 S00750A000700070217-6
Approved For;, Jease 2001/06.ffCQE DP61SO075 A 00700070217-6
SECURITY INFORMATION TAB E - 2
b. Economic Development in the Eastern European Satellites.
Description:- An analysis of economic development
in the Eastern European satellites under Soviet control.
ORR is considering sponsorship of this project. It
will probably be presented for a proval in the summer of
1953. Proposed cost: 25X1A1a
c. Probable Consequences of the Liberation of One or More
Soviet Satellites.
Description: This project would deal with the alternative
courses of action of the United States, the United Nations, and
other parties concerned in the event of the liberation of a
satellite resulting from general war, from a "Titoistic separa-
tion", from a weakened USSR, from a split-up of the Soviet
system for any cause, or from a substantial modification of
Soviet policy without either war or internal revolt.
Sponsorship of this project is being worked out.
Proposed cost: 25X1A1a
d. Soviet Language Trends and Propaganda Themes.
Description: A study of Soviet linguistics in an attempt
to correlate changes in language trends with changes in
propaganda themes.
Sponsorship of this project is being worked out.
Proposed cost: - 25X1A1a
3. Financial Summary:
a. Estimated Balances of Money Approved for FY'53 and Avail-
able for Expenditure in FY'54 to Conclude Projects.
Patterns of Soviet Take-over and Control
Forced Labor in the USSR
Social Tensions in Communist China
Total:
b. Money Approved for Expenditure in FY'54:
Social Tensions in Communist China
Approved For Release 2001/0~ ,p~4PP61S00750A000700070217-6
Approved For Release 2001/08/lSLCR"6l S00750AW00070217-6
N%wr SECURITY INFORMATION
c. Estimated Cost of Projects Under Consideration for
Consequences of Satellite Liberation
Scientific Education in the USSR
Economic Development in European
Satellite s
Soviet Language Trends
Approved For Release 2001/08/17 ,ftff f 1S00750A000700070217-6