GENERAL REQUIREMENT FOR INFORMATION ON THE PRODUCTION OF GUIDED MISSILES AT THE DOEPROPETROVSK AUTOMOBILE PLANT (DAZ) AND THE RELATIONSHIP OF THESE ACTIVITIES TO THE SOVIET GUIDED MISSILE PROGRAM.
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP62S00231A000100050083-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 9, 2016
Document Release Date:
November 18, 1998
Sequence Number:
83
Case Number:
Publication Date:
May 14, 1958
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 366.69 KB |
Body:
Approved For Releas
3-8
14 May 1.953
4infortian plus am analysis of p-st
hutemobile Plant vas
Illilltt!!!!!::1718alet:11:11
in the perio4 1954-51
riee on
type*, is still
anaL ad
-sy
re:gusted:
Gemjsral
a. Is the 114.4 at present a *Li ii*egrated
Nast' or is it a occerlex of different plant*? Th-s
might be detersined try the continuous area eat:closet
by security fencing end the hamogeneltw of leek
thereat of the security police in the area.
b. What has beam the production history of IltZ
tree its inception? flpeeiel emphasis sheuld be pm':
on the period 1549 and after.
c. *sat is the invoke:ft size of the labor fore
working at 110,4?- Has the sloe of the !sorting force
fluctuated: in-*. period 1950-preseut1 If so giTe
the amount of nuctustion.
d. Mbat to, or hes been the subozistioL. t
this plait within the Soviet governmental hierarety-
Approved For Release nnninRon, ? riA.,PrwArnikr4-AnnfmArrgC0083-8
Approved For Release 2000/fliiiiii$MiligniiiiifigLAIMEM83-8
Requirement
Missiles at the
sad ate Relationakipo
guided Missile Prograe
e. dive the
keg officials for
military or citilian
*. What wee the *at&xe of the priocipal pro-
dmation at this Aant lathe year. 1930-present? Ms
this :plant eageged in the Wale prodeetien of a silgle
oomponeat or several different components?
b. Neve workers from ZO.Z been at to other
Pleats for spatial productiou treLaine If so, Dale
the pleats, their orweisational subordiestions,
dates and =Our and shills of sorkers.
e. was take woduttioa at this plant in the
pertoe 1910.33 emetned to them:tine end final
assembly of whoops-eta aseufactured clamber?
'ere the indiviAuel components suestfaatured as vei .
as assembled tegether at this Plant?
d. 'Neat were the ra es of production at this
pleat is the period 1950-53? What vas the total
volume of 00Pet of Iudividnal products? What ver
the dates of ititiatioa ea& end of series producti)c
of the product or proCacts? What other plants
seppliel ram materials *r manufactered products to
the VW Mire their titles and locostices. dive tAl
destinations and condoners of the prodoets from tail
MI. dive comtlete details and *etebe fprodnes
produzed.
e. Proda tion of Salome' traetarsbegan
LAN in 1954. Lid this result in the stoppage of
other produettta at the ;dent or did seek product
continue? If ether production contimedi give the
proportion of ether produetion to tractor proL
f. What Iroductien equipment use shined to
the pleat, 194-present? That other facii
Involved?
Approved For Release 2000/08/23 : CIA-R
083-8
Approved For Release 2000/
25X1B4d
25X1B4d
08lrlop*Po83-8
dequirevent for Information on the PradtketiAll of
Missiles at the Dnepropetrovsk Avemeebile 'Lunt
ead the flelatiosship of thee* Activities to the
*sided Mlesile troves..
b. Determine
sesr to be engaged irt t
e. Airport the progress of Rey new oonstruct
Are there anly heavy re ted concrete strustures in
the plant *reel
pia) t
d. Was the sound of jet esgine testing been
heaxd. at thisrDeat, aceomnemaid tlitiesTr sir Pte-
ware in the immediate vicinity of the pleat?
el. Mote earefully all features, of any high
bey ereee at the plank, particularly the eppearevo
of any entrances to then.
f. What le the present degree
this plant? Describe the security measures;
towers end feneee. Ave some parts at the plant ee iZret
aisti fenced off from the rest? Are there setured ;rectal
veer the plant? Do the worker* emed epeelal I.D. edges/
Is one hedge :rod for 101 areas of the plant?
g. Describe the transportation services. lie'
the spposrance of any mil spur leading into the yi.ant.
deport carefa3.4 the dbeervation of sly oversized
flatcar*, geadola ears or freight ears with or wit tout
end ezteselone. Nate the appearance of tenk ears ar
flateere loaded with ipherieal tanks. Tnke pertiknlar
Approved For Release 2000/08/23: CIAR:b.1562S00231A000100050083-8
J.
25X1B4d
Approved For Release 2000/901,6
likliCktzimnizslAbutio0050083-8
Require* Intomestion Oi the Productic,i.
Missile*t tht inepropetrovik Automobile tAnt
mid the ralstioughip of these Activities to ;he
Soviet Snide& Plesile 'regrow.
1. Nbte
plant
eammeniontions or
read stabile?
vy-duty crane vehicles in the
mobile von eqmipment partictaiLly
vehicles. Are they rsil or
Z. Nehtmsts this weber of rkccs in a Shift
end determine the weber of shifts being coeked.
k. As exti:lery proving ground is reported
to exist is an wee betimes Dnepropetrovsk smd
Pawl:ogee& Is ***re any interrelstioneMP between
DM and this pra/ieg ground? If sop et Whet times
and Chat is the sxture of reletionehipq
1. aeport the. coustruzttion or empanel
electric power facilities end workers qmartere in
the vicinity of the pleat.
s. deport the onnetruction of
seed hx.gheepei1itLes. Perticsleriy
important are as lambing out of the cap Leto
remote *res.. (live reilus of turns for ail new
ktiopers.
This requirenes+ has been coantlxidowl W.*, and clowgrred.
25X1A9a
Distribution:
Orig & 1 - Addressee
1 - D/I
2 - I/GM 25X1A9a
oRR/DA/Gm:111111111111cr/4291 (14 May 58)
Approved For Release 20