I/SH BRANCH REPORT FOR OCTOBER 1958.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP62S00231A000100100022-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 9, 2016
Document Release Date: 
November 30, 1998
Sequence Number: 
22
Case Number: 
Publication Date: 
October 31, 1958
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP62S00231A000100100022-9.pdf76.88 KB
Body: 
RM NO ? Initiz pproved For Rele? A-RDP62S00231A000100100022-9 ce Vlemoru ndum .UNITED STATES GOVERNMENT Chief, Industrial Division Chief, Shipbuilding Branch DATE: 31 Oct.)ber 1958 SUBJECT: I:/SH Branch Report for October 1958. 1. The Status of Branch Projects is as follows: (a) Projects 35.1559, 35.1933, 35.2090 and 35.2394. No change in the status of these projects since the ;epternber Branch 3eport. (b) Project 35.2409 1958 Shipbuilding Conference 25X1A9a responsible Analysts: iue date to St/PR: No formal report is to be rade -tours to 10/1/58: 331. ork in pre-,oaration for this conference has been corn- pleted during the month and gapers forwarded 'Phis 25X1A6a included the following: 1. Draft of paper titled "USSR: Shipbuilding T"echniques and Rates of Production Apparent in the Serial Con- struction of Kazbek-class tankers and Aktyubinsk-class Refrigerator Vessels". Brief of this paper is to be presented at the Conference and it has also been circulated to the JIC Subcommittee on Ship- building for possible issue as a Subcommittee working Paper. 2. Statements for presentation at the Shipbuiliing Conference on the following: (.a) USLclt Shipbuilding for the Inland Fleet (o) USSEZ Shipbuilding for the Fishing Flee (s,} USEIR Shipbuilding Costs Sanitized - Approved For Release TA-RDP62S00231A000100100022-9 Sanitized - Approved For eM .= IA-RDP62S00231A000100100022-9 SUBJECT: I/SH Branch Report for October 1958. 2. The Status of Suoport Projects is as follows: (a) Project 00.?117 Tevision. of Briefing Handbook Due date: 18 October 1958 itesponsi.ble analyst: Estimates by each analyst are coordinated by 25X1A9a October revision of estimates completed and submitted to St/PB/A (b) Projects 10.1803, 10.2020, 30.1826 and 30.1830. No change in the status of these projects since the September Branch Report. (c) One draft for possible use as a CSN was submitted during the month. Information in this draft was used in a CI.) article. 3. Changes in Estimates. Recent developments in intelligence on Bloc shipbuill.ing have not changed present estimates significantly. Zt. Relationships with Other Components. (a) I/SH representatives have coordinated the patters prepared for presentation at the Shirbuilding Conference (item 1 b above) with ONI. 5. Future Plans. 25X1X7 . Other Problems and Recommendations. 25X1A9a Sanitized - Approved For Release : CIA-RDP62