Body:
"D M NO. .
i ized - Approved rRelease _ : CIA-RDP62S00346 1A-RDP62S0034
Of juice Memorandum ? UNITED STATES GOVERNMENT
TO Chief, Materials Division
FROM Acting Chief, Electric Power Branch
suBJECr: Monthly Report for July, 1957
DATE: 31 Jul 57
ACCOMPLISHMENTS: Support and Coordination
1. Messrs. Buckingham and Fischer, AMS, consulted several times
25X1A9a with on the Albanian and Czechoslovakian NIS.
25X1A5a1
25X1 A9a25X1 A9a 2. and _, M/EP, debriefed
a consult ng a ectrica engineer who recently return ~~~~
25X1A9a 3. Memos were written by evaluating covert reporting
of East German exports of generating equipment to Communist China, and
the contribution of the to intelligence
25X1A5a1 on the Bloc electric power industries at the request of St/I and St/PR,
respectively.
14. The annual report of the Subcommittee on Electric Power and
Solid Fuels, EIC, was prepared and submitted by 25X1A9a
5. A CSM on "Indication of Soviet Plans to Divert the Flow of
Northern Rivers, Pechora and Vychegda, into Caspian Sea" was submitted.
25X1 A was the responsible analyst.
25X1A5a1 6.
25X1 A5a 1 is being prepared by in
support of the IAC Ad Hoc Committee on Exchanges. 25X1A9a
7. A memo was submitted,in response to a request from the DD/I,
on Mr. Malenkov's demotion from Minister of Electric Power Stations to
manager of the Ust Kamenogorsk hydro power plant. was the 25X1 A9c
responsible analyst.
25X1A9
8. Support to OCI was furnished. Electric power information in
current handbooks on Rumania and East Germany was updated by-
Current collection requirements were submitted to CCI. Analysts were
and ?25X1A9a
?25X1 A9e
Sanitized - Approved For Re1ease":CIA-RDP62S00346A000100150169-5
25X1A9a
Sanitized - Approve
ACCOMPLISIDIENTS: Project Research
1. Two,additional contributions to Project 10.1506, the Soviet
NIE, were submitted. One evaluated. the first half - 1957 plan ful-
25X1A9q'illment reports. was the responsible analyst.
25X1 A9a 2.
Background research 'continues on Project 10.1510, China NIE.
is the responsible analyst.
1 3 Background research continues on Project 20.1514, Section 62
of NIS on Czechoslovakia. is the responsible analyst. 25X1 A9a
4. Project 13.1605, Impact of Long Range Plans for Electrification
and Dieselization of Railroads in the USSR was reviewed and coordinated.
.Analyst was 25X1A9a
TRAININ
'withdrew from the Sixth Intensive Beginners Russian
Course because of insufficient time to study.
GIA-RDP62S0034RA000100150169-5
ADMINISTRATION 25X1A9a
25X1 A9a 1. etirement became effective 31 Jul 57.
has been designa e acting branch chief. 25X1A9a
25X1A9a 2. was on leave for two weeks. is acting
vice Mr. aye e.
25X1A9a
3. - was on leave for one week.
4. The Flexisort machine is processing the East German files in
25X1A9a a pilot run. - is running this operation.