DAILY ACTIVITY REPORT - 9 SEPTEMBER 1963
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP63-00313A000500130078-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 14, 2016
Document Release Date:
August 26, 2002
Sequence Number:
78
Case Number:
Publication Date:
September 9, 1963
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 62.13 KB |
Body:
Approved For Release 2002/09/03 : CIA-RDP63'60313A000500130078-8
.CRET
Copy
9 September 1963
MEMORANDUM FOR: Deputy Director for Science and Technology
SUBJECT : Daily Activity Report - 9 September 1963
Mission Status
a. IDEALIST - The U-2 detachment at Edwards Air Force Base,
California is in standby status,
b. BRASS KNOB Three U-2 mission* were flown over Cuba as
follows: 6 September,70% target coverage, 3713, no reactions. 0 Sep-
tember, 3714, 65% target coverage, no reactions. 3715 was launched
on $ September and &boarded shortly after take off due to mechanical
trouble. A spare aircraft was launched successfully with 65%6 target
coverage and no reactions.
. OXCART Flight Status:
a. Aircraft #121 (J-58 engines) made flight #79 on 7 September for
a duration of fifty-five minutes. Maximum speed was Mach 2. 53 and an
altitude of 67, 000 feet. The purpose of this flight was to evaluate in
cremeental by-pass door operation in conjunction with flight roughness
investigations. The instrumentation tapes of this flight are under study.
~RET
Approved For Release 2002/09/03 : CIA-RDP63-00313A000500130078-8
25X
25X
25X
Approved For Release 2002/09/03. CLA-RDP63-90313A000500130078-8
CH ff
b. Aircraft #1Z2 is scheduled for a heat soak flight can 9 September.
c. Aircrafta #124, 125, 126 and 128 are undergoing routine main-
tenance. Aircraft* #128 and 1Z9 are in final assembly
I
25X1
25X1
Approved For Release 2002/09/03 :7+DP63-00313A000500130078-8