STAFF MEETING MINUTES - 25 NOVEMBER 1958

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP63-00313A000600020063-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 15, 2016
Document Release Date: 
December 1, 2003
Sequence Number: 
63
Case Number: 
Publication Date: 
December 1, 1958
Content Type: 
MIN
File: 
AttachmentSize
PDF icon CIA-RDP63-00313A000600020063-5.pdf204.77 KB
Body: 
Approved For Release 2003/12/10 : CIA-RDP6-00313A000600020063-5 CH4L-O1tie6 Copy ,(of 14 Page l of 4 1 December 1958 STAFF BIND KOM= - 25 November 1958 Personnel Prescott Mr. Diesell Col. Burke Mr. Reber 25X1A Mr. Cunningham 25X1A 1. Q Directive - The 0 Directive is now in final form and is ready to be transmitted. Both Mr. Bissell and Col. Burke asked that if there were any additions or deletions desired on the part of any section, these should be made known to them by the close of business 25 November. In anticipation that this directive might cause some concern among contractors, particularly Kelly Johnson, there was some discussion about informing of the over-al]. sensitivity oz veil as resxmuib ties on nontractora by the Project. /~7Y"osEp ACTION: Col. Burke 2. Staff Directive - Progress on a staff directive has apparently slowed down as a result of certain possible organizational changes affecting M. Mr. Bissell requested, however, that staff sections keep working on this as history had shown that a total settling down for DPS probably would never happen. Top Approved For Release 2003/12/10 : CIA-RDP63-00313A000600020063-5 Approved For Release 20031 O'PO :'~I" DPS 00313A000600020063-5 ACTION. Col. Burke 5. Security Plan for Stagi.ig - I said that the Security Sectio the rocess of reviewing security problems encountered in the staging' with the aim of drawing up a tight security plan for a taging operation. ,ACTION: Security ,at 6. Security Plan for Fro1low-?i Kr.,oem - I ame rograw a particular security problem in any follow-on p suppliers., notably II are involved in fedsibility studies in more than one proposed DP'S program, and that keeping the various supplier personnel conpartmented was especially difficult because the same DPS Headquarters personnel were involved in the various programs. 7. Scramble Phones - Investigation has shown that the Agency has a 20-station scramble phone cystem of which 10 stations are still available. It was determined that we would seek 3 of these stations cm- 0126 Copy K, of 14 Page Y of l+ 25X1 25X1 Approved For Release 2003/12/10 : CIA-RDP63-00313A000600020063-5 Approved For Release 2003/1241 j: I `- r.-'~63-2' 0313A000600020063-5 with the phones to be placed in Operations, Col. Geary's office and. Mr. Bissell's Adman Building office. AC'iTIOR: Ccmmo t3. Test Status Board - a. Due]. O cThen - Recent discussions clarified the nature of Co.. Beerli's suggested emergency oxygen system, which involves a fairly minor aircraft modification. of Lockheed, has cared and will attempt to establish specifications for the nod, by 1 December. A Lockheed modification which calls for low pressure warning lights, a sight gauge and an automatic feature which allows switching from one 'regulator to another, is caning along well but does not yet have the operational reliability desired for adoption. Testing will continue. b. System I Testing - Further conversation on this subject have reuulted in System I being removed from the test status board. in fact,, what was listed as System I testing was continued testing of the arcing problem in the Rambo pre-amp. d. Meetings with on results of the to date have no shown expect results. Part of the problem concerns the lack of power of the present mod, which could be corrected. Under certain circumstances the device might act as a beacon. Although two more flight tests are required and will be carried out, Mr. Bissell requested D & P to re-evaluate the background of the original proposal. In the course of this re-investigation, a higher power version should also be looked into. concurred, that he would terminate the spare parts contract for In view of the above,II noted, and Mr. Bissell ct- 0426 Copy_ ,of 3.4 Page 3 of 1E Approved For Release 2003/12/10 : CIA-RDP63-00313A000600020063-5 Approved For Release 2003/12/10 :~-C63-,,pp13~000600020063-5 9. on iab Tests - announced that the Zoaa Climb Tests were s start an ece er, with all. pa tieipatin j persopotl in place on 7 December. It is expected that five successful lLitts will, be required and that they will, take apprcocima-tely two weeks 'm coolaete. Fitua magements are now being coordinated. Lla behalf of DPS, I KU be atatioansd at a and at Da Rio. 10. Alr.Ops - W. Bissell said that t t'politiea1. C,eerecaes" for a rev~Air vision functions t1P8 had been secured w ih #. ex 4 He said be spec to is the now future . ACTION: Kr. Bi.o salt Mr. Bissell said his reaction to an initial examination of Agency air assets was that in same departments they probably could be impressed, although he geed that direct Agency control should be maintained for valid emergency purposes. Pending the clearances noted above, responsible DDS Sections were requested to work on their porti:uo of an over-all staff directive. Mr. Bissell reviewed score of and noted his tentative conclusion that a cadre or activity th' would not look too different in structure Pram the current DPS ugani- zation. He noted that d shortly be retuzning from to assume responsibility for this type of activity, uw* - others. 12. Office Space for WS - ':there was a short discussion of possible expansion in ---- o ce apace in the Matomic Building, occasioned by the probaba.e reorgoaizatian noted in paragraph 10 above. W. Bissell said he wind discuss this with sad Mr. Cuniniaghama noted that the request would not carne as a total surprise. 25X1 at would be activated 4 December 1958. 14. Devel t of t for Pre-Burnout Zelemet - Mr. Bissell said that if we were absolutely assured of the Air Force view on responsi- bility for the development of equipment for pre-burnout telemetry and for responsibility for the conduct of operations, D & P was to take the lead with the assistance of Coasnunications in the development of such equipment. ACTION: Mr. Reber, D & P CEPS/DC~ to Copy o~ 14 (distribution next page) Pape of 4 Approved For Release 2003/12/10 : CIA-RDP63-00313A000600020063-5 Approved for Release 20" f"m CS EIA~F'gff3-00313A00b600020063-5 VJ` Distribution- I w 2 - D* Director i)PS/DCI 3 - Mr. Reber PS/Ml -D UPS/Dc' 5 ? Admire UPS/DCi 6 - Cover DPS/DCI 7 Pwacu el. UPB I 8 - Security DPS I 9 > Contracting 8 /DCI 10 - Materiel DC'S/DCI 11 - Operations 1C'S/DC1 12 - Como DPS/DCI 13 - Finance =/DCI 14 - Minn CLrono DPB/DCI CHAL-0426 Copy i of 14 I Approved For Release 2003/12/10 : CIA-RDP63-00313A000600020063-5