SYSTEM (Sanitized) FAILURE REPORTED (Sanitized) 0739

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP63-00313A000600100019-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 14, 2016
Document Release Date: 
November 27, 2002
Sequence Number: 
19
Case Number: 
Publication Date: 
February 11, 1963
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP63-00313A000600100019-5.pdf94.32 KB
Body: 
Approved For Release 2003/01/24: CIA-RDP63-00313A000600100019-5 25X1A lL 1041 11 f'e 'y 1663 copy ... of -~ - Chief, Operations Diivision, 0S* System I IPailure Reported I0739 25X1A 1. In view of recent speculation cone operation 25X1 D of the system is Article 342 mast it may be25X1 A analysis of the recent 25X1 A appropriate to document a "best LT5789. system malfunction reported in 2. Possibly, the key to the source of malfunction is the fast that the oystesess, itself, was found to be extremely met from condensation during the post-fli ' ht check. It in not no aal for a "cold nook" to leave wet. This 25X1 A condensation was probably caused becasssse the Q -bay boater was nat in use during that particular flight. (This was a normal situation. The a -bay beater is normally used only when equip- seat to in the '. # a this articular flight there was no equip t in the =x y.) This condensation was further aggravated by the tact that the Article was taken from 40 li feet down to 20 g feelt and turn back an to altitude prior to turning 25X1A O'iOla.~' Most likely theory is that the moisture in the system j shorted out the high-voltage supply transistors, causing con- 25X1A plete failure of the system. 3. It there is as moral, or lesson, to be learned is tbi may be that normal operation of the system should pre being used during test missions unless the Q-bsy hen i 4. on= again, the above is only a "best guess," and t to be way to prove or disprove this without expo the unit to the same conditions. It is felt, bier, the r esndat ion included in paragraph 3 is generally sound s h"14 be considered for inclusion in the standard operatli instructions for the NOT TO GE DISSEMINATED CI3 ABa 0S.1%-M01/11 ODD 25X1 D 25X1A EMstribution: 25X1 A Original and 1 -- Addressee OSVCOMMO pjb Approved FodWe1eai t$ J g =RCP 3-0 600 P4100019-5 #4-COMMa0 .~ jtas Chief , Coa m uunigattons Sta