CONCURRANCE IN AMENDMENTS NO. 2 AND NO. 3 TO LETTER CONTRACT NO. B-5111 WITH (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP64-00360R000700070035-0
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
November 17, 2016
Document Release Date:
December 13, 1999
Sequence Number:
35
Case Number:
Publication Date:
December 27, 1955
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 150.01 KB |
Body:
25X1A
25X1A
A -r
Approved For Release 2000/08/18: CIA-RDP64-00360R0Q0700070q35-0 jrcl-,
SAPC 3131
corria.ef 5.
cc-Ye
27 December 1955
FOR
nee in Arn4nant. No. 2 and No.
No. B.j_l_11 with Baird Associat
ot m(47.:trivroNE)
1. L.tter Contract No. B-5111 obligates the sum of $20,000.00
for a feasibility study by the Contractor in connection with celestial
navigation systems for use in Project AQUATONE. Period of performance
was to 17 November 1955.
2. Amendment No. 1 te letter Contract No.
additional $15.000. making a new total obligated o
period of performance was extended to 1 December 19
No. I did not change.tbe original scope of work.
obl gated an
,000.00, and
Amendment
? 3. Amendment No. 2 to Letter Contract No. 4411 obligates
additional $25,0no.0o over and above Amendment No. 1, making a new
total obligated of $6o,000.00? Amendment No. 2 makes provision in
the scope of work for the culmination of one phase of the feasibility
study (System 1 - sextant) on 19 December 3.955 and the presentation
by the Contractor on that date of the preliminary design and layout
of the System 1 sextant. Amendment No. 2 also provides for. con,.
tinuation of certain feasibility studies on navigational systems
which indicate greater promise for future development, (Nos. 3 and 5),
culminating Ins final report on all feasibility studies conducted
(System* 1 - 5, inclusive). Refer to Baird proposal dated 9 Noe,.
bar 1955, APC-2966.
Lxe.t.tur,?4(2.1,4,
,bAmendment No. ) to latter Contract No. 0-5111 obligates an
additional 1644M.00 over find above Amendment No. 2, making 4 new
total of 0.00 obligated under Letter Contract No. 13-5111.
Amendment is primarily concerned with the design and construction,
of the first prototype of the aircraft sextant (System 1), including
the fabrication of a second complete set of components. Delivery
of the first prototype unit is seheduled for 13 February 1936 and the
delivery of the final report of the feasibility studies conducted
under Contract No. 0-5111 is likewise set back to 15 February 1956
Refer to Baird proposal dated 17 Deeember 1955, sap-3041, for
details.
Approved For Release 2000/08/18: CIA-RDP64-00360R000700070035-0
Approved For Release 2000/08/18: CIA-RDP64-00360R000700070035-0
SAPC 3131
25X1A 5. An amount not to exceed $200,000.00 has been comni ted for
in accordance with the provisions of Section 10 (b) of
Law 110, by nempriumhnt dated le October 1935 from the Director
Central Intelligence to the Comptroller. Such amount visualised a
production program subsequent to the prototype phase which is the
subject of Amendment No. 3. After evaluation of the prototype hereunder
consideration will be given tr;, the initiation of a production program
under Contract No. B-5111 or other contractual agreement.
6. Approval of Amendments No. 2 and 3 to Lotter Contract No. B-5111
and signature thereof by the Project Contracting Officer is rimosnended.
25X1A
CONCURRENCE:
0/5-4
neral Counsel
Coap sr
2 -
Oath
Master
Service
mince Off
hrono
aiding
25X1A
Pro act Contracting Officer
SEED /
RICURDIL BISSZLL, JR.
SA/PC/DCI - Project Director
25X1A
Approved For Release 2000/08/18: CIA-RDP64-00360R000700070035-0