CONCURRENCE IN LETTER CONTRACT NO. HL-4646 AF33(600)-38772, WITH THE GENERAL DYNAMICS CORPORATION (CONVAIR DIVISION), FORT WORTH, TEXAS, PROJECT GUSTO
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP64-00360R000800040136-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 14, 2016
Document Release Date:
October 18, 2002
Sequence Number:
136
Case Number:
Publication Date:
January 21, 1959
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 118.14 KB |
Body:
25X1A
25X1A
25X1A
Approved For Release 2002/10/29 : CIA-RDP64-00360R000?00040136-0
SECRET
9
R ThE RECCeJi,
Concurrence in Letterontract No. EL-4646
sVith The General
Corporation (Co AIR Division), Fort Worth,
Texas, Project-WM
1. This memorandum contains a recommendation submitted
far epproval of the Director of Central Intelligence. Such
recommendation is set forth in Paragraph 5.
2. Letter Contract No. H104646 is being issued to
CONVAIR, Fort Werth, Texas, for the procurement of initial
studies* tests and preliminary designs of a hUgralitudek
supersonic reconnaissance vehicle to replace the U-2. This
initial ;base of the work is expected to require four and
one-half months of primarily engineering effort, the total
cost of which is estimated to be I The result-
ing definitive contract is expected. to be s CM type. This
work is being conducted simultaneously with that being per-
formed by Lockheed on their design version. It is anticipated
that upon completion of this portion of the program= evalua-
tion will be held and a decision made to proceed with one of
these contractors.
ter Contract No. EL-4646 Obligates an amount of
implement the program, chargeable to Fiscal Year
cot GU$TO funds. By concurrence to this smniorandua,
Comptroller magnifies that sufficient funds are available
for this additional obligation.
4. Certification of funds for this contract will be
handled under the procedure approved by the Director of Central
Intelligence on 15 December 1956, which in effect results in
all 10(b) expenses involving issuance of Treasury Checks being
accumulated in a separate account within the Finance Division.
The amounts in this account will be periodically scheduled for
certification of the vouchers by the Director. This procedure
eliminate* the necessity for a separate certification of auth-
ority under Section 10(b) of Public Law 110, suit Congress,
for each contract.
SECRET
,
Approved For Release 2002/10/29 : CIA-RDP64-00360R000800040136-0
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
25X1A
Approved For Release 2002/10/29 : 4-00360R000690040136-0
5. Asscrovaa of Letter Contract No. BL-4646 and execu-
tion thereof =behalf of the Agency by the authorized Con-
tracting Officer is recceszended.
CalCUERNiC33;
..,,flomuvracmIas uzzlear, DPD
eM.rector D**aP, DPD
/-
cAsaltroller, DPD
or General Counsel
/
DPD-E0/Pqg
Distribug;;;11111
Orig HL-4646
- Comp.
3 Chrono
"
RICHARD M. DI
Deity Director
Approved For Release 2002/10/29 : CIA-RDP64-00360R000800040136-0