TASK CHANGE RECORD NO. 15
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP64B00187A000700160024-0
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 12, 2016
Document Release Date:
July 11, 2002
Sequence Number:
24
Case Number:
Publication Date:
November 12, 1959
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 98.42 KB |
Body:
Approved For Release 2002/07/23 : CIA-RDP64B00187A000700160024-0
12 vvember 1959
'TATINTL
Wa,fh i n ton, D, C.
STATINTL Subject:
STATINTL
#ra.sk Change Record No 11)
In accordance with discussions betweer'd
on 10 November and to eoon o
12 Wove m r, Uontranwr re ceding with additional tasks
covering dest41n, construction, and test of a revised 2-D exhaust
nozzle model and aex aely ie o:' V e nisult trig data. " hese additional
is Oon truc# pnew Parts said components
for the existing 2-D exhaust nozzle. This work
will be conducted during the period from 11
November th rough b December, 1959.
3. Model 'Teeastf.n - Contractor will conduct two
a ess~ of tests on the revised 2-D exhaust
model. The first test will be carried out iri
the Langley 8-toot tunnel duritag the period
from 6, December through 18 December 1959. The
seoora. tent will be carried out in the JPL
tunnel (supersonic) during the period from 21
Deeam per through 31 December, 1959. Tunnel
prior_tien and costa, are to be arranged by the
Customer,
tasks will ime lute
p uk-A&I Deal n and Construction - Contractor
Ax a1 axis mid S rt -. contractor will
teaks arer see follows
i1. Model Dest1/Tx end Corastr ctiOf
b. Model tostI.rzr
ee i? rosulting Ma from the 2-.U nozzle
tests and will prepare a aas.a aear7 document of
these data. This work will be oo~t 31 ing
the period from 20 December 1959
Januar 1960
2 Bat:-ma'ted costs to the Customer for these additional
.) ,g. Rik ir.f..4 A. r3#Ca JQ' L
Approved For Release 2002/07/23 : CIA-RDP64B00187A000700160024-0
STATINTL
Approved For Release 2002/07/23 : CIA-RDP64B00187A000700160024-0
STATINTL
STATINTL
STATINTL
STATINTL
3. In aooorda noe with the above, Contractor submits t ht
following change to the contract i
Basic Task
TCR No. l
TCR. No. 2
TCR No.
TCR Na . 4
TCR No.
TCR No. 6
TCR No , 7
TCR No.
o
TCR No. 9
TCR NO, 10
TCR NO. 11
TCR No. 12
TO No, 1
TCR No 3.
Eng. Duot)
Elect. Model
Klect. Model
Rag. Duct)
Facilities)
Fit. Conti. Sys.
Air Turb. Drive
My 15 -30 June Task)
Faacilities )
I July-15 July Task)
Teak Description)
Juror Adjustment:17j July - 30 Aug . )
:31 Aug. - 18 Dec.)
sat?. ated Cost
Fee
'otal
TON No 1--)
(1.seribed Herein
Ad?,-ueted Totals
Approved For Release 2002/07/23 : CIA-RDP64B00187A000700160024-0
Approved For Release 2002/07/23 : CIA-RDP64B00187A000700160024-0
Approved For Release 2002/07/23 : CIA-RDP64B00187A000700160024-0