TRIP REPORT - KADENA AIR FORCE BASE, OKINAWA AND EIELSON AIR FORCE BASE, ALASKA, 12 - 16 MAY 1963 (OXCART)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP65B00652R000200120010-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 19, 2016
Document Release Date: 
August 28, 2003
Sequence Number: 
10
Case Number: 
Publication Date: 
May 24, 1963
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP65B00652R000200120010-8.pdf98.59 KB
Body: 
Approved For Release 2006/11/06: CIA-RDP6 LD00652ROO0200120010-8 DOCUMENT N0. S CR NO CHANGE IN CLASS. [] DECLASSIFIED CLASS. CHANGED T01 TS S C NEXT ?EVIEW DATE= _------- AUTH~ ~ % v~~+Ern Copy 2 4 MAY 1963 MEMORANDUM FOR THE RECORD SUBJECT: Trip Report - Kadena Air Force Base, Okinawa, and Eielson Air Force Base, Alaska, 12 - 16 May 1963 (OXCART) 25X1 25X1 5X1 . by Two are adequate 25X1 for our use from a materiel point of view. From a security viewpoint, these facilities leave much to be desired for a pre-strike base. Floor plans for these hangars are on file in MD/OSA. Base, Okinawa, and Eielson Air Force Base, Alaska, during the period 12 - 16 May 1963. 2. Kadena Air Force Base a The mission at Kadena was to inspect the OXCART facilities prior to acceptance from the Contractor. With a few minor exceptions, the work was completed as requested. Instructions were issued to the Contractor to correct the minor discrepancies found. Overall, the Kadena facility can be considered operational as a KC-135 staging base. A surve of all hangars resently on base was made b SS/OSA visited OXCART facilities at Kadena Air Force 1- Colonel Houser C. Wilson, AFIGO-S: c. Sufficient liquid nitrogen is available to support the OXCART Program. Storage for the liquid nitrogen is in short supply; therefore, we will furnish 500 gallon storage tanks for our use. d. The Project Officer for this station is He is assisted by Both are assigned to Air Base Group Operations. 3. Eielson Air Force Base a. The visit to Eielson was made to plan additional construction. After contacting Colonel Jones, the Base Commander, most of our time was spent with Lt. Colonel Conti, the Base Civil Engineer, and his replacement, 25X1 Lt. Colonel Woy. A plan for the KC-135 OPS/COMMO facility USAF revievv(s) completed. . SECRET Approved For Release 2006/11/06: CIA-RDP65B00652R00020012 010-8 Approved For Release 2006/11/06: CIA-RDP65B00652R000200120010-8 SECRET Page 'Two was developed and left with Colonel Conti. This plan is presently being staffed within OSA. When completed, the details will be forwarded to Eielson through AFIGO-S to start construction., b. Instructions were given to Colonel Ball, the Base "Jack's House" Project Officer to place our R-2 Refueler in a temporary storage condition until it is needed by the Project. c. I made a survey of existing hangar 25X1 facilities; floor plans are on file within MD/OSA. It is felt that the present hangars are not suitable for our use due to the large number of shops and offices housed in these buildings, i.e. base operations, control tower, etc. 4. The trip report of ?tional construction plans for Eielson. Lt. Colonel USAF MO/MD/OSA-DD/R MD/OSA: ad (23 May 63) Distribution: Copy 1 - MD/OSA 2 - AD/OSA 3 - DAD/OSA 4 - C/PS/OSA 5 - D/FA/OSA 6 - D/TECH/OSA 7 - C/SD/OSA 8 - SS/OSA 9 - DD/OSA 10 - OD/OSA 11 - CD/OSA 12 - Chrono (MD/OSA) 13 - PJM File 14 - RB/OSA 15 - AFIGO-S SECRET Approved For Release 2006/11/06: CIA- DP65B00652R000200120010-8 25X1 Approved For Release 2006/11/06: CIA-RDP65B00652R000200120010-8 Approved For Release 2006/11/06: CIA-RDP65B00652R000200120010-8