LETTER TO (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP66B00728R000100020014-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 9, 2016
Document Release Date:
June 7, 2001
Sequence Number:
14
Case Number:
Publication Date:
June 30, 1961
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 133.01 KB |
Body:
approved Fdi',Release~`01/078 C 6 0728R000100020014-2
SECRET
'1'`-` DPD-4107-61
t - -L Task Order No. 2
Contract No. BB-425
25X1A
10 JUN 1% 1
1. In accordance with the provisions of Contract No. BB-425
and effective upon your acceptance hereof you are authorized to
proceed with the performance of Task Order No. 2 to said contract.
2. The scope of work to be performed under this Task Order
and such additional provisions as may be applicable are set forth
in the attached schedule.
3. The estimated cost of the performance of this Task Order,
exclusive of the fixed fee, is $85,033.00. Cost in excess of this
amount shall not be incurred without prior written authorization of
the Contracting Officer.
4. The fixed fee for the performance of this Task Order shall
5. The work and services to be performed under this Task Order
shall commence on or about 1 July 1961 and shall be completed on or
before 31 January 1962; however, said period of performance may be
extended by mutual agreement.
6. The work shall be conducted in phases and in accordance with
the schedule set forth in the schedule attached hereto.
7. Upon execution of all copies of this Task Order please return
the original and one copy to the undersigned and retain the remaining
copy for your files.
TITLE Vice-President
DATE I4 lLi Ia61
BY
SEC
IT
Very truly yours,
Contracting Officer
DOCUMENT NO.
NO CHANGE eN CLASS.
^ DECLASSIFIED
CLASS. CHANGED TOf TS S 0
NEXT REVIEW DATES
LL~
AUTHi HR 10.2
DATEI-9 t.eEWEWERr_O645 Q
Approved For Release 2001/07/28 : CIA-RDP66B00728R000100020014-2
Approved For Release 2001/07/28 : CIA-RDP66B00728R000100020014-2
Task Order No. 2
Contract No. BB-425
I SCOPE OF WORK
Contractor shall furnish necessary facilities and services to
perform following work:
Conduct a complete engineering design study directed toward the
development of a viewer capable of employing high resolution photo-
graphy with a minimum degradation, in accordance with the technical
proach outlined in Contractor's document entitled "Proposal For A
Rear Projection Viewer", ITL-3205-1 dated 8 February 1961 and "Proposal
For A High Performance Lens For A Photointerpretation Viewer", ITL-
3205-2 dated 8 February 1961, said documents being incorporated herein
by reference.
The viewer will be capable of displaying aerial photography
limited at 200 lines per millimeter without degradation below 195
lines. The optical system for such a viewer must maintain resolution
in excess of 400 lines per millimeter to obtain this capability.
The work shall be conducted in two phases. Phase I shall be the
basic design study in which all parameters of the system will be speci-
fied and the basic design concept will be finalized. At the completion
of this phase a detailed design plan will be submitted for approval.
Contractor will not proceed with Phase II until such approval from the
Contracting Officer is received. Such approval will be forwarded with-
in two (2) weeks after receipt of the design plan. Contractor shall
be entitled to an adjustment in the contract schedule for any delays
upon the part of the Government in granting such approval.
Phase II of this project will consist of the detailed engineer-
ing necessary to bring the development to a point from which fabrication
can be initiated. Drawings shall be suitable for manufacturing, but
need not meet all of the requirements of military specifications.
Because of the requirements placed upon the optical system
extensive research and analysis will be accomplished by the optical
engineer assigned to this task. The initial effort will be a market
survey to determine the availability of suitable finite conjugate
projection lenses. The lens selected will be subjected to bench tests
to determine the operating characteristics of each. Contractor will
test lenses supplied by the Customer in the same manner and coordinate
with the Customer its decision on the finally selected lens.
Approved For Release 2001/07/28 : CIA-RDP66B00728R000100020014-2
Approved For Release 2001/07/28 : CIA b 0728R000100020014-2
Phase I of this project and the detailed technical report
shall be completed within three (3) months. Phase II of this work
will be completed within four (4) months after receipt of approval
of the design plan.