Approved For Release 200
U IOZA-4959
Copy ',3 of 3
EMORANDMI FOR THE R CCB
SUBJECT: provision] 4 Conference on Systems 9A. and 12
25X1A
The following persons attended:
25X1 A PROJECT
upon:
2. The following items were discussed an.d/or agreed
a. System 12
(1) Scope of work: approved for 15 systems.
(2) Delivery Schedule:
#1 Delivered 1 Nov (in Art 342)
#2 Delivered 15 Nov (in Art 359)
#3 Delivered 26 Nov (in Art 355)
#4 7 December
#5 - #14 One every 10 days beginning
17 December.
25X1A
(3)
pointed out that the #1 System
is a non-standard prototype which cannot
be retrofitted to make it like the
No CH V"
P, LAMM,
: S S ? It
x~:.4~?Ap'vf 2002/0 UZ1fI_RDP66B00728R0
30 November 1962 at
to finalize the contract
port of Systems 9A and 12.
25X1A
NOT TO rye- { "CSEl1MlNATED
02002?x.2.= CA-OO/R
Approved For Release 2002/=gA-RDP66B00728R000200230056-2
PAGE TWO
production models. Although, it is a
useable system, he recommended that it
be withdrawn from the inventory and
cannibalized after the final system is
delivered. COMMO/OSA will take action
an this.
(4) It was agreed that all systems beginning
with #4 would be delivered to the depot.
b. Initial Spares for System 12
(1) Scope: approved for seven kits in
accordance with the P. 3, proposal 2112C.
(2) Delivery schedule:
One kit every 10 days beginning 7 December.
25X1A
(3)
will furnish complete description and
price of all items in kit including itemiz-
ed breakdown of "miscellaneous small
parts-peculiar". They will also code the
list N or R to indicate "expendable" and
"recoverable" items.
System 12 Test Equipment
(1) scope: approved only for six each ATI
Model B System 12 Text Harnesses.
Remainder of test equipment recommended
25X1A
25X1A on P. 8 of 0 Manual will be chocked by
for availability from USAF
sources. Distribution of the six sets
will be:
2 Detachment "0"
,
1 Detachment "H"
I LAC
2 x
a
Approved For Release 2002/09/04: CIA-RDP66B00728R000200230056-2
rT
ckr
Approved For Release 2002/09/O tDP66B00728R000200230056-2
PA1 THREE'
(2) Delivery Schedule:
Approximately one every ten days beginning
7 December.
stem 12 Tech Manuals
(1) Preliminary Manual - approved for ten
copies. (Two have been delivered to
Detachment '"H? . Classification will be
"Confidential". Delivery anticipated by
10 December.
(2) Final edition -- approved for 20 copies.
Delivery anticipated by 30 January 1963.
Final edition will be in?two parts -
PART I - Operating Instructions (Confidential)
PART 11 - Maintenance Instructions
(Unclassified)
e. System 9A
(1) Scope - approved for 16 systems.
(2) Delivery Schedule: Approximately two per
25X1A
month beginning 1 February 1963.
System containers and radomes: 15 each
containers and radomes will be ordered
from LAC. LAC will fabricate and ship
these items to for final assembly with
the systems. ision to procure a con-
tainer and redome for each system was
based on simplifying the supply, maintenance
and transportation problems.
(4) Indicator Panels (control boxes): LAC
will fabricate thiek-ttem and install in
each aircraft. Extra panels will be made
to support the bench. mock-ups at each
site.
Approved For Release 20/04: CIA-RDP66B00728R000200230056-2
0CRET
SECRET
Approved For Release 2002/09/04: CIA-RDP66B00728R000200230056-2
f. System 9A Spares
(1) Scope - approved for seven kits per P. 3,
25X1A
(3) Parts list will be provided the same as
for System 12.
System 9A Test Equipment
(1) Scope - approved for six each of the
following:
X1A
25X1A
the items recommended by 0 for availability
from USAF sources.
25X1A
21125.
Delivery Schedule two kits per month
beginning 1 February 1963.
(2) Delivery Schedule: Approximately two
per month beginning 1 February 1963.
System 9A Tech Manuals/Drawings
Scope - approved for 20 copies.
(3)
Test Control Box
Cable Kit
Spaces Card
will screen the remainder of
Classification:
Operating ManUal - Classification to be
determined byl
Maintenance Manual - Unclassified
Delivery Schedule - February 1963.
$ pares Contract -- CT ' 514
This will be a call-type contract to provide
for follow-on spares for both systems through
FY=1963. Under this contract, items will be
Approved For Release 2002/09/04: CIA-RDP66B00728R000200230056-2
4 ECRU
Approved For Release 2
rwr
A: CIA-RDP66B00728R000200230056-2
#= nvz
.hiyd peid to the depot . shipping
-ts will deed and billed p-t'bIi
xotwt
& M Cent ct .. TM - 313
. will time and a :teria3n contract
be a
for the fir, , u1, and ifidetiOn
of both teems tbrougt FF-I163 ? 10 bonded
will be requi*t Q ia~iti.sil 5X1A
to m this Contract* will rec nd 25X1 A
wed ewe ired of tar repair. experience
hee been gained.
gz in and Billing Pr"04141*
25X1A
0 ing and billing ~,aderee.
25X1 A
button'
MDA
g AD/ NA
3 COCA
4 /OBA
gA
/+EA
7 - It=/"A
MD/OSA-DD/R ah
25X1A
Approved For Release 2002/ O4 -RDP66B00728R000200230056-2
furnished a plate instructions on