(UNTITLED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP66B00728R000300080008-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
September 10, 2002
Sequence Number: 
8
Case Number: 
Publication Date: 
June 20, 1963
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP66B00728R000300080008-1.pdf124.25 KB
Body: 
NFRO REVIEW.,9OMPL1irOved For R ease 20 / f 072 25X1 25X1 25X1 UNIT 4 PRELIMINARY PHOTO TESTING HAS CONNENCED IN THE DRT 25X1 WITHOUT THE MIRROR USING THE STRAIGHT THROUGH CONFIGURATION MIRROR WBR. 12 BY OTHER THAN THE ISSUING OFFICE 15 PROHIBITED. Ccpy Na 2026Z 20 JUN 63 CORONA/LANYARD ATT Ns ROUTINE IN--88586 REFS WEEKLY TWX REPORT PROGRAM STATUS REPORT FOR WEEK-ENDING .15 JUNE 1963, UNIT AND PS49048-15. SCHEDULE STATUS AS FOLLOWS IN REFERENCE TO PS-%49-6., PS904G-110 UNIT 2 ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWSa C 'X LENS ASSEMBLY COMPLET ION OF a HAPL'4 REMAINS SCHEDULED FOR - -_y. Yr' t +n4 :asszf'"s,3 a 'e,.,... 5 JULY. POLISHING AND 'FIGURING ?OF .THE F_INA1.' TWO SURFACES HAS COMMENCED, MIRROR HBR, 9 PREVIOUSLY PLANNED FOR THIS UNIT HAS SHOWN IN .OPTICAL TESTING A CHANGE IN FIGURE WHEN MOUNTING ATTITUDE IS CHANGED. FURTHER TESTS WITH THIS MIRROR ON UNIT 4 ARE CONTEMPLATED TO - DETERMINE THE EFFECT ON FINAL PHOTO PERFORMANCE. NO CHANGE FN CLASS. ^ DECLASSIFIED CLASS. CPAI.::::i TO, TS S C AUTH: HE 1.41 DATE- 2-7-j 25X1 Approved For Release 2002/10/21 : CIA-RDP66B00728R000300080008-1 S E C R E T Approved For Release 2002/10/21 : CIA-RDP66B00728R000300080008-1 25X1 CIN~~80~86) S E C R E T PAGE TWO IS NOW SCHEDULED FOR USE WITH UNI T 4 AND THIS MIRROR WILL BE AVAILABLE FOLLOWING OPTICAL TESTING FOR INSTALLATION ON THE UNIT BY THURSDAY, 20 JUNE. HAPL-1 1 IS INSTALLED IN THIS UNIT. UNIT 6 - ACCEPTANCE TESTING WAS COMPLETED ON THURSDAY, 13 JUNE, HOWEVER, SHIPPING HAS BEEN DELAYED. A'DIFFERENT DRT VACUUM FOCUS SETTING HAS BEEN ESTABLISHED FOR THIS UNIT IN REFERENCE TO PREVIOUS UNITS. A FOUR-DAY VACUUM CONFIDENCE RUN IS CONTEMPLATED FOR NEXT WEEK TO FURTHER VERIFY THE VACUUM FOCUS POSITION. HAPLm8 IS INSTALLED IN THIS UNIT. UNIT 7 4 ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWS: LENS ASSEMBLY .a ON SCHEDULE WITH ASPHERIZING PROCEEDING SATISFACTORILY, UNIT 8 4 ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWS: LENS ASSEMBLY THE CHANGES TO ? T HE ASPHER IZ ING CELL FOR HAPL-12 HAVE BEEN COMPLETED AND FINAL ASPHERIZING AND TESTING IS BEING DONE. UNITS 9, 10, 11, 12 AND 13 G ON SCHEDILE. END OF MSG S E C R E T Approved For Release 2002/10/21 : CIA-RDP66B00728R000300080008-1 1