(UNTITLED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP66B00728R000300080043-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
November 6, 2002
Sequence Number: 
43
Case Number: 
Publication Date: 
September 13, 1963
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP66B00728R000300080043-2.pdf155.06 KB
Body: 
Dt T. 2016Z 13 SEP 63 NRO REVIEW COMPLETED 25X1 25X1 __ To 25X1 DIRECTOR ost I PRIORITY AND SPECIAL TESTING STATUS AS FOLLOWS: CLASSIFIED -MESSAGE 02/11/15: CIA-RDP66B0072 S E C R E T DOCUMENT NO. NO CHANGE IN CLASS. ^ DECLASSIFIED CLASS. CHANGED T01 TS S 0 NEXT REVIEW DATES l^ r AUTni na 1u-2 ~ DATEII.J EVIEWER1 ;11" R I 0 R I T Y PROGRAM STATUS REPORT AS OF 13 SEPTEMBER 63. UNIT ACCEPTANCE HAPL-8 LENS INITIAL LENS-ONLY TESTING IN THE DRT GAVE A :. .. ., a ?... -. VACUUM TO ATMOSPHERE FOCUS SHIFT ANAMOLY AND DEGRADED STATIC PHOTO RESULTS. THIS WAS .CHECKED WITH HAPL12WITH SIMILAR RESULT So pT4 , ` ..{ Ar ` } c.'.# r..' r$ Stc y (Sfv' x~ ~kr'3s. HOWEVER" ~ RETESTING ON THE MANN `BENCH INDICATED NORMAL VACUUM SHIFT CHARACTERISTICS OF HAPL-8. AS A RESULT :,THE DRT HAS BEEN Approved For Rele MODIFIED TO USE A NEW 240 INCH FOCAL LENGTH PARABOLA AND COMPLETELY REALIGNED. TESTING OF HAPL-8 AT ATMOSPHERE DONE LAST NIGHT AND THIS MORNING IN THE DRT INDICATES A LENS-ONLY STATIC PERFORMANCE' OF APPROXIMATELY 140 LINES. A FOUR FOOT ADDITIONAL TUBE SECTION MUST BE ADDED TO THE DRT S E C R E T REPRODUCTION BY OTHER THAN THE ISSUING OFFICE IS PROHIBITED. Copy tM1fo. 5X1 Approved For Release 2002/11/15 : CIA-RDP66B00728R000300080043-2 25X1 IN--91184 25X1 TOR: al i._ 13 ..$J. E 63 REF: WEEKLY TWX REPORT Approved For ReIAa_se 2002/11/.15 CIA-RDP66B00728R009'300080043-2 25X1 (IN--91184) S E C R E T YAuL iwu FOR'FULL VACUUM OPERATION. THIS IS NOW BEING PROCURED, HOWEVER, AN ATTEMPT IS BEING MADE TO DETERMINE VACUUM SHIFT CHARACTERISTICS BY INSTALLATION OF A WINDOW BETWEEN THE MAIN TANK AND THE COLLIMATOR TUBE. THIS HAS BEEN INSTALLED AND TESTS ARE UNDER WAY. THE FOUR FOOT TUBE SECTION IS EXPECTED TO ARRIVE AND BE AVAILABLE TOMORROW AT WHICH TIME IT WILL BE INSTALLED. UNIT 6 - IT IS PRESENTLY PLANNED TO INSTALL HAPL-8 UPON COMPLETION OF THE CURRENT LENS-ONLY TESTS VERIFYING VACUUM FOCUS SHIFT. THIS TESTING IS SCHEDULED TO BE COMPLETE BY NOON TOMORROW. UNIT LENS AND MIRROR INSTALLATION AND ALIGNMENT WILL COMMENCE IMMEDIATELY AND BE COMPLETE NOON SUNDAY, 15 SEPTEMBER. ACCEPTANCE TESTING CONSISTING OF TP49984, A DR. "A" TEST FOR FILM FLATNESS AND A .15=MINUTE TRACKING VERIFICATION IS SCHEDULED TO BE COMPLETE ON TUESDAY, 17 SEPTEMBER. A COLD PORT THERMAL TEST WITH :THE LENS CELL AT AN UPPER LIMIT OF 90 DEGREES F WILL BE CONDUCTED UPON COMPLETION OF ACCEPTANCE TO VERIFY LENS PERFORMANCE AT HIGH TEMPERAT URES. THIS TEST CONSIDERED MANDATORY BY BOTH `AND SE. ONU DOCK,,DELIVERY IS SCHEDULED FOR FRIDAY, 20 SEPTEMBEK* 25X1 Approved For Release 2002/11/15 : CIA-RDP66B00728R000300080043-2