(UNTITLED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP66B00728R000300090052-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 15, 2016
Document Release Date: 
May 4, 2004
Sequence Number: 
52
Case Number: 
Publication Date: 
November 2, 1962
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP66B00728R000300090052-1.pdf223.89 KB
Body: 
25X1 25X1 25X1 Approved For Release 2004/Q7/07..,,'CIA-RDP6613.,0.Q72$R00030Q09Q05a2-1 L37:e 1640z 02 Nov 62 To zDIRECTOR ACVH OSA (d-2-3-4-5-6-7-8-9-10) ROUT I NE ` S/c (11) TOR,- W oz 02 Nov 62 1 i ts 54 3,014 25X ATTN; JIM M. 25X1 REFa WEEKLY TWX REPORT PROGRAM STATUS REPORT FOR WEEK ENDING 27 OCTOBER 196&. UNIT SCHEDULE STATUS AS FOLLOWS IN REFERENCE TO PS-9040-'69 PS-9040-7n AND FS-9040-8a UNIT 2 .- ON SCHEDULE WITH SUB:I~SSEM9LY. STAB'-US AS,-.FOLLOWS FINAL ASSEMBLY AND TEST BEHIND ONE WEEK CHECKOUT TESTS ON SCHEDULE UNIT 3 BEHIND 3 DAYS WITH SUBASSEMBLY STATUS AS FOLLOWS FINAL ASSEMBLY AND TEST BEHIND 3 DAYS UNIT 4 BEHIND ONE WEEK WITH SUBASSEMBLY STATUS AS FOLLOWS SCAN DRIVE BEHIND TWO WEEKS OPTICAL BAR INSTALLATION BEHIND ONE WEEK ~7 DOCUMENT NO. PLATEN BEHIND ONE WEEK NO CHANGE tN CLASS. 0 DECLASCIFIca CLASS. CN;:."&4EU TO, TS J3 ~, .~... s .d~,?' i ~. ~.,, h'-~ c .~~ Ir?iA '3 "-F!, 25X1 NRO review(s) completed. Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1 25X1 Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1 S E C R E T (IN 54304) PAGE TWO FINAL ASSEMBLY AND TEST ON SCHEDULE UNIT 5 ... ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWS OPTICAL BAR ELECTRONICS AHEAD ONE WEEK SCAN DRIVE BEHIND ONE WEEK PLATEN AHEAD ONE WEEK LENS AHEAD ONE WEEK FILM TRANSPORT ELECTRONICS AHEAD TWO WEEKS METERING DRIVE AHEAD ONE WEEK AND THREE DAYS FILM TRANSPORT AHEAD ONE WEEK AND THREE DAYS TRANSPORT INSTALLATION AND TEST AHEAD THREE WEEKS FINAL ASSEMBLY AND TEST AHEAD THREE WEEKS UNIT 1 -^ ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWS OPTICAL BAR ELECTRONICS AHEAD TWO WEEKS SCAN DRIVE ON SCHEDULE FILM TRANSPORT ,ELECTRONICS COMPLETE METERING ' DR IVE COMPLETE TRANSPORT-ASSEMBLY COMPLETE TRANSPORT INSTALLATION AND TEST AHEAD TEN WEEKS .SUBASSEMBLY QUALIFICATION PROGRAM FOUR SUBASSEMBLIES REMAIN TO BE RETESTED AND QUALIFIED, THESE ARE V/H PROGRAMMER SPOOL AND SPOOL DRIVE OPTICAL BAR FILM TRANSPORT THE FILM TRANSPORT ASSEMBLY9 UNIT 19 IS NEARLY COMPLETE HAVING ONLY S E C R E T Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1 Approved For Release 2004/07/07 5- C-RDg6iA728R000300090052-1 25X1 BE COMPLETE BY NEXT WEDNESDAY 31 OCTOBER. UNIT 2 IS ON SCHEDULE BASED ON THE DETAILED PLAN PS-9040-7 AND IS PRESENTLY AT LEXINGTON VERIFYING TEST PROCEDURES9 AND PROVIDING ENGINEERING INFORMATION STATIC PHOTO DATA. tit IT 3 IS INDICATED BEHIND SCHEDULE 3. DAYS DUE TO REWORK ACTIVITY REQUIRED AS PREVIOUSLY REPORTED.- ACCEPTANCE TEST PLAN PS-9040??9 IS BEING FOLLOWED AND SPECIAL EFFORT. HAS BEEN INSTITUTED TO ENSURE ITS THE DANCER BRACES MODIFICATION REMAINING TO BE INSTALLED. THIS WILL BE DONE NEXT WEEK AND THE QUALIFICATION TESTING WILL TAKE PLACE TO BE COMPLETE BY 3 NOVEMBER AS REPORTED LAST WEEK, THE SPOOL AND SPOOL DRIVE WILL BE TESTED FOLLOWING THE FILM TRANSPORT. THE SPOOL DRIVE GEAR AND BRAKE MODIFICATION IS COMPLETE. THE UNIT 4 p OPTICAL BAR WILL BE SUBASSEMBLY QUALIFIED STARTING 8 NOVEMBER WITH ALL MOD IF ICAT IOI.4S INS`I ALLED. REWORK OF THE UNIT 4 LENS SCAN TO INSTALL THE LENS LOCK IS PROCEEDING VERY WELL AND SHOULD (IN 54304) PAGE THREE .. ,....., efam TTS"% A Ti L~n eIr AT I nr t!M TT .4 T.Ci REPORTED PER. PS-9040?8 .COMPLETION TO START LEXINGTON ACCEPTANCE TESTS ON ,5 NOVEMBER. SUBASSEMBLY PINNING AND SHIMMING S'M'ARTED ONE ' DAY COMPLETE' TACHOMETER INSTALLATION COMPLETE LENS LOCK INSTALLATION STARTED ONE DAY COMPLETE TRANSPORT DANCER SUPPORTS STARTED` - ONE-HALF DAY COMPLETE AT THIS TIME THERE APPEARS TO BE NOTHING THAT WILL JEOPARDIZE THE. SCHEDULED ON-DOCK DELIVERY DATE OF 21 NOVEMBER. HOWEVERv THE SCHEDULE IS EXTREMELY TIGHT AND DOES NOT ALLOW FOR A MOJOR DIFFICULTY. DAILY AN 6" ALL SJr'ERV ISO i' MEETING HAS BEEN INITIATED 11xi ORDER TO ? S E C R E T Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1 Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1 25X1 S E C R E T (IN 54304) PAGE FOUR ENSURE MAXIMUM EFFORT IN ALL CRITICAL AREAS DURING THE NEXT THREE WEEKS. SUBSYSTEM QUALIFICATION PROGRAM-- UNIT 2 WILL COMMENCE PRE-QUALIFICATION CHECKOUT TESTS WITH ALL MODIFICATION INSTALLED ON 12 NOVEMBER. ALL SUBSYSTEM TESTS ARE NOW SCHEDULED TO BE COMPLETE BY 16 JANUARY BUT WILL BE RUN ON A NOT TO INTERFERE BASIS WITH UNIT DELIVERIES. THE PRESENT PLAN PS-9040.7 PROVIDES THIS TESTING INTEGRATION. THE INSTALLATION OF THE REFREGERATION UNIT AND ASSOCIATED EQUIPMENT NECESSARY FOR THERMAL TESTING IS SCHEDULED TO .COMMENCE AT NIGHT STARTING 5 NOVEMBER TO BE COMPLETED NO LATER THAN 26,NOVEMBER. THIS WILL ALLOW COMPLETION OF ALL QUALIFICATION. REQUIREMENTS AND LENS THERMAL TESTING IN ADVANCE OFREQUIRED 14,FEBRUARY DATE. S E C R E T. Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1