25X1
25X1
25X1
Approved For Release 2004/Q7/07..,,'CIA-RDP6613.,0.Q72$R00030Q09Q05a2-1
L37:e 1640z 02 Nov 62
To zDIRECTOR
ACVH OSA (d-2-3-4-5-6-7-8-9-10) ROUT
I NE
` S/c (11)
TOR,- W oz 02 Nov 62
1
i ts 54 3,014
25X
ATTN; JIM M.
25X1
REFa WEEKLY TWX REPORT
PROGRAM STATUS REPORT FOR WEEK ENDING 27 OCTOBER 196&. UNIT
SCHEDULE STATUS AS FOLLOWS IN REFERENCE TO PS-9040-'69 PS-9040-7n AND
FS-9040-8a
UNIT 2 .- ON SCHEDULE WITH SUB:I~SSEM9LY. STAB'-US AS,-.FOLLOWS
FINAL ASSEMBLY AND TEST BEHIND ONE WEEK
CHECKOUT TESTS ON SCHEDULE
UNIT 3 BEHIND 3 DAYS WITH SUBASSEMBLY STATUS AS FOLLOWS
FINAL ASSEMBLY AND TEST BEHIND 3 DAYS
UNIT 4 BEHIND ONE WEEK WITH SUBASSEMBLY STATUS AS FOLLOWS
SCAN DRIVE BEHIND TWO WEEKS
OPTICAL BAR INSTALLATION BEHIND ONE WEEK ~7
DOCUMENT NO.
PLATEN BEHIND ONE WEEK NO CHANGE tN CLASS.
0 DECLASCIFIca
CLASS. CN;:."&4EU TO, TS J3 ~,
.~... s .d~,?' i ~. ~.,, h'-~ c .~~ Ir?iA '3 "-F!,
25X1
NRO review(s) completed.
Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1
25X1
Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1
S E C R E T
(IN 54304) PAGE TWO
FINAL ASSEMBLY AND TEST ON SCHEDULE
UNIT 5 ... ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWS
OPTICAL BAR ELECTRONICS AHEAD ONE WEEK
SCAN DRIVE BEHIND ONE WEEK
PLATEN AHEAD ONE WEEK
LENS AHEAD ONE WEEK
FILM TRANSPORT ELECTRONICS AHEAD TWO WEEKS
METERING DRIVE AHEAD ONE WEEK AND THREE DAYS
FILM TRANSPORT AHEAD ONE WEEK AND THREE DAYS
TRANSPORT INSTALLATION AND TEST AHEAD THREE WEEKS
FINAL ASSEMBLY AND TEST AHEAD THREE WEEKS
UNIT 1 -^ ON SCHEDULE WITH SUBASSEMBLY STATUS AS FOLLOWS
OPTICAL BAR ELECTRONICS AHEAD TWO WEEKS
SCAN DRIVE ON SCHEDULE
FILM TRANSPORT ,ELECTRONICS COMPLETE
METERING ' DR IVE COMPLETE
TRANSPORT-ASSEMBLY COMPLETE
TRANSPORT INSTALLATION AND TEST AHEAD TEN WEEKS
.SUBASSEMBLY QUALIFICATION PROGRAM
FOUR SUBASSEMBLIES REMAIN TO BE RETESTED AND QUALIFIED, THESE ARE
V/H PROGRAMMER
SPOOL AND SPOOL DRIVE
OPTICAL BAR
FILM TRANSPORT
THE FILM TRANSPORT ASSEMBLY9 UNIT 19 IS NEARLY COMPLETE HAVING ONLY
S E C R E T
Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1
Approved For Release 2004/07/07 5- C-RDg6iA728R000300090052-1
25X1
BE COMPLETE BY NEXT WEDNESDAY 31 OCTOBER.
UNIT 2 IS ON SCHEDULE BASED ON THE DETAILED PLAN PS-9040-7 AND IS
PRESENTLY AT LEXINGTON VERIFYING TEST PROCEDURES9 AND PROVIDING
ENGINEERING INFORMATION STATIC PHOTO DATA.
tit IT 3 IS INDICATED BEHIND SCHEDULE 3. DAYS DUE TO REWORK ACTIVITY
REQUIRED AS PREVIOUSLY REPORTED.- ACCEPTANCE TEST PLAN PS-9040??9 IS
BEING FOLLOWED AND SPECIAL EFFORT. HAS BEEN INSTITUTED TO ENSURE ITS
THE DANCER BRACES MODIFICATION REMAINING TO BE INSTALLED. THIS WILL BE
DONE NEXT WEEK AND THE QUALIFICATION TESTING WILL TAKE PLACE TO BE
COMPLETE BY 3 NOVEMBER AS REPORTED LAST WEEK, THE SPOOL AND SPOOL
DRIVE WILL BE TESTED FOLLOWING THE FILM TRANSPORT. THE SPOOL DRIVE
GEAR AND BRAKE MODIFICATION IS COMPLETE.
THE UNIT 4 p OPTICAL BAR WILL BE SUBASSEMBLY QUALIFIED STARTING 8
NOVEMBER WITH ALL MOD IF ICAT IOI.4S INS`I ALLED. REWORK OF THE UNIT 4
LENS SCAN TO INSTALL THE LENS LOCK IS PROCEEDING VERY WELL AND SHOULD
(IN 54304) PAGE THREE
.. ,....., efam TTS"% A Ti L~n eIr AT I nr t!M TT .4 T.Ci REPORTED PER. PS-9040?8
.COMPLETION TO START LEXINGTON ACCEPTANCE TESTS ON ,5 NOVEMBER.
SUBASSEMBLY PINNING AND SHIMMING S'M'ARTED ONE ' DAY COMPLETE'
TACHOMETER INSTALLATION COMPLETE
LENS LOCK INSTALLATION STARTED ONE DAY COMPLETE
TRANSPORT DANCER SUPPORTS STARTED` - ONE-HALF DAY COMPLETE
AT THIS TIME THERE APPEARS TO BE NOTHING THAT WILL JEOPARDIZE THE.
SCHEDULED ON-DOCK DELIVERY DATE OF 21 NOVEMBER. HOWEVERv THE
SCHEDULE IS EXTREMELY TIGHT AND DOES NOT ALLOW FOR A MOJOR DIFFICULTY.
DAILY AN 6" ALL SJr'ERV ISO i' MEETING HAS BEEN INITIATED 11xi ORDER TO
? S E C R E T
Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1
Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1
25X1
S E C R E T
(IN 54304) PAGE FOUR
ENSURE MAXIMUM EFFORT IN ALL CRITICAL AREAS DURING THE NEXT THREE
WEEKS.
SUBSYSTEM QUALIFICATION PROGRAM--
UNIT 2 WILL COMMENCE PRE-QUALIFICATION CHECKOUT TESTS WITH ALL
MODIFICATION INSTALLED ON 12 NOVEMBER. ALL SUBSYSTEM TESTS ARE NOW
SCHEDULED TO BE COMPLETE BY 16 JANUARY BUT WILL BE RUN ON A
NOT TO INTERFERE BASIS WITH UNIT DELIVERIES. THE PRESENT PLAN
PS-9040.7 PROVIDES THIS TESTING INTEGRATION. THE INSTALLATION OF
THE REFREGERATION UNIT AND ASSOCIATED EQUIPMENT NECESSARY FOR
THERMAL TESTING IS SCHEDULED TO .COMMENCE AT NIGHT STARTING
5 NOVEMBER TO BE COMPLETED NO LATER THAN 26,NOVEMBER. THIS WILL
ALLOW COMPLETION OF ALL QUALIFICATION. REQUIREMENTS AND LENS THERMAL
TESTING IN ADVANCE OFREQUIRED 14,FEBRUARY DATE.
S E C R E T.
Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090052-1