LETTER TO JIM FROM (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP66B00728R000300090062-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
May 4, 2004
Sequence Number: 
62
Case Number: 
Publication Date: 
July 27, 1962
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP66B00728R000300090062-0.pdf78.8 KB
Body: 
Approved For Release 2004/07/07: CIA-RDP66B00728R000300090062-0 CpECtAL AND L 1 N N NRO review(s) completed. Sub-paragraph c. Change first sentence to v. read "Final acceptance of equipment and materials....." 23 are acceptable. However the note appearing below paragraph 23 should be deleted. Manuals for the Stellar-Index subsystem should be provided even though they originate 27 July 1962 Dear Jim: Following are comments on the Boston `fork Statement for the Lanyard Program. Work statement used for basic reference is that dated 20 June 1962. Paragraphs 1 through 17 are acceptable. Ref. Paragraph 18 - Paragraph should reflect that Boston will provide 83 film spools for a five (5) flight program. These should be delivered in accordance with the film spool-transit v case schedule developed by Boston. Boston is to provide productive flanges for the G.F.E. transit cases. Paragraph 19 - SE has never received the production lists designating spares. Therefore recommend that the date be adjusted to 15 August and L/ that SE approval will be granted 30 days thereafter. We will try to better the 30 days. Ref. Paragraph 20 - This paragraph is acceptable. 1 Ref. Paragraph 21 - Sub-paragraph a. should be changed to read as follows: "Inspection of the material to be delivered from Boston shall be at a level deemed necessary by Boston and approved by the government to insure performance." Balance of this paragraph is acceptable. Sub-paragraph b. In the last sentence insert the word "instrument" before the word "transit". Paragraphs 22 and UOCUMIENT NO. tG t Q~ CPr~ 2t t i ? CL ASS. fl [T7 L(: :`iS z cF in another contract. In reply refer to: SP2-332 SPECIAL. lease 2004/07/07: CIA-RDP66B00728FJOPO 009 OV L I N ,,.,~ Approved For Release OO OT/07 ICLIPAOLj28R000300090062-0 AAN? LINE SP2-332 27 July 1962 Paragraphs 24 and 25 are acceptable. Ref. paragraph 26 - 2nd sentence of sub-paragraph d. should be changed to read "A summarizing report shall be forwarded 45 days after the subsystem qualification test program. Paragraph 27 is acceptable. '/~ It is also recommended that a statement be included in the work state- ment recognizing the role of System Engineering in the affirmation of requirements, representation of the government during acceptance testing and review of designs and reliability programs. It is my understanding that has submitted the desired wording. Very truly yours, STAT PECL HANDLING Approved For Release 2004/07/07 : CIA-RDP66B00728R000300090062-0