LETTER TO INFORMATION TECHNOLOGY LABORATORIES FROM (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00074R000500190007-6
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 21, 2016
Document Release Date:
December 30, 2008
Sequence Number:
7
Case Number:
Publication Date:
January 1, 1961
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 111.75 KB |
Body:
Approved For Release 2008/12/30: CIA-RDP67B00074R0005001900076 IN~HNiMIIiIIIIIIIIIIIIIIIIIIIIIIIIIIII
DM-0572-61
Task Order No. 1
Contract No. BB-425
Information Technology Laboratories
Lexington, Massachusetts
1. In accordance with the provisions of Contract No. BB-425, and
effective upon your acceptance hereof, you are authorized to proceed
with the performance of Task Order No. 1 to said Contract.
2. The scope of work to be performed under this Task Order and
such additional provisions as may be applicable are set forth in the
attached Schedule.
3. The estimated cost of the performance of this Task Order,
exclusive of the fixed fee, is $31,123.00. Cost in excess of this
amount shall not be incurred without prior written authorization of
the Contracting Officer.
4. The fixed fee for the performance of this Task Order shall be
$2,490.oo.
5. The work and services to be performed under this Task Order
shall co=erce on or about 21 December 1960 end mall be completed on
or before 31 July 1961; however, said period of performance may be
extended by mutual agreement.
6. Upon execution of all copies of this Task Order, please retium
the original and one copy to the undersigned and retain the reamainin,~;
copy for your filet.
Very truly yours,
ACKNOWLEDGED AND ACCEPTPD Contracting Officer
THIS DAY OF 1961
INFORMATION TECH Y LA ORA'IORIE8
TflTLE
Approved For Release 2008/12/30: CIA-RDP67B00074R000500190007-6
Approved For Release 2008/12/30: CIA-RDP67B00074R000500190007-6
Task Order No. 1
Contract No. BB-4+25
SCHEDULE
I. SCOPE OF WORK
Contractor shall furnish facilities and services necessary to perform
the following work:
(a) Investigate the feasibility of frequency attenuating
filters and their application to image enhancement, determine the
analytical means for their evaluation, and ascertain the limitation
of image enhancement resulting from their use.
(b) Conduct an experimental program to devise a practical way
for constructing and mounting frequency attenuating filters.
Consider mechanical and photographie means of Waking such filters,
and determine specifications on the glass or other supporting
structure necessary to hold them accurately in place. All methods
and tests are to be correlated with theoretical developments.
(c) As guided by (a) and (b) above, construct a set of such
filters if theory and tests indicate feasibility which can be
incorporated in the Image Enhancement Viewer. This filter set
shall not exceed four in number. Perform filtering operations on
photographic transparencies to demonstrate the quantitative a:apeets
of the resultant enhancement.
(d) As a result of these research and development studies,
issue a summary report which demonstrates the analytical and
experimental methods used for the program. The report will include
an evaluation of the enhancement produced by frequency attenuating
filters and provide specific rations for future development
of the instrument, if deemed advisable. The report would be
issued no later than one month after the five-month research and
development period.
II. GOVERNMENT-TURN PROPEM
The Government shall furnish as GYP the ])wage Enhancement Viewer
delivered to the Government under Contract No. BB-300 between the parties.
The Contractor is authorized to modify this viewer as set forth in
Paragraph 1 above.
Approved For Release 2008/12/30: CIA-RDP67B00074R000500190007-6
Approved For Release 2008/12/30: CIA-RDP67B00074R000500190007-6
III. ANTICIPATORY COSTS
All costs which have been incurred by the Contractor on or after
21 December 1960 in anticipation of and prior to the si?ning of this
Task order and, which if incurred after the signing of this Task Order
would have been considered as allowable costs hereunder, will be
accepted by the Contracting Officer as costs under this Task order.
IV. DELIVERY
The work set forth in Paragraph 1 shal.A be completed and the final
report submitted on or before 31 July 19$i.
Approved For Release 2008/12/30: CIA-RDP67B00074R000500190007-6