BUILDING CONSTRUCTION ON EIELSON AFB BY SHELL OIL COMPANY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00074R000500440008-7
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 21, 2016
Document Release Date:
November 13, 2008
Sequence Number:
8
Case Number:
Publication Date:
April 28, 1963
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 134.76 KB |
Body:
Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7
USAF, Aero Systems Div. r
Wright Patterson AFB/Ohio
HQ Aero, Systems Division
Shell Oil Company, 50 W. 50th Street
i3.
:Contractor shall procure, fabricate and/or
install the following equipment and special
facilities at Eielson AFB at the site and
location designated by the Base Commander orl
a) Remove overburden and provide suitable
fill to bring site location to grade with
adjacent developed area.
b) Install a 40' x 120' steel building with
tile covered concrete floor. Building to be'
insulated and interior partitioned into fifteen,
rooms of size and arrangement as designated by
the Base Commander or his representatives.
c) Above building to be equipped with heating
plant to provide hot air central heating and;
airconditioning for selected rooms, as speci-
fied by above layout. Fuel storage for heating,
plant will be provided. (cont. on Page 2).
STAT
Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7
Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7
Page Two
d) Install a covered passageway from building
to adjacent existing steel building.
e) Provide all electrical power connections'
to building including such interior outlets'
as designated by the Base Commander or his
representatives.
f) Provide suitable potable water supply
from water well to be drilled in location
area.
g) Provide suitable septic tank sewage dis-;
posal system.
h) Provide necessary paved walkways and
passages as designated by Base Commander or:his
representatives.
i) Install additional security fencing and
lighting as required and designated by the
Base Commander or his representatives.
j) Install provisions for communications con-
nections as designated by the Base Commander
or his representatives.
Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7
Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7
lLCB
Building Construction on gcls:~n At D 1y S icit oil Company
Shell Coil Corlp.ny
ATT I: Mr. W. B.
1219 Westl.-'.zZ Av--:,t:o PrQrzi
Seattle, Wash
APR 2R 1Q64
1. An Inspection of the 40' x i20' : s' .!ni1-:rative facility constructed in
the refueling loop area was ma to F.s .u compliance with the plans and
specifications developed S :CiL i ;t Comp' yy. This inspection was
conducted in the presence of M . :i . D. Vi zt=nnan, this date, by the
following personnel:
Lt Colo_^i A. '-, -",'%t
C L-iN no ring Division
17.
2. Ile s t b f^'tifr i ^rid 7"Zc1 to comply with the plans,
specifications and .Air ~. rcc cc.z . _ __~ on r,4- ufrernnents, with the following
exceptions:
a. Leaks from Chu lk-j t fii=,:x s In t L h^liway between buildings.
b. 1.o asp .Ii~ tiLe icy oL1: ?.' :+.
C. t:.T3 ,1c ur y r-Ulre on
d. Additional pork re ,uircd f i7 dron.
e. A Gate c= :' vI.cc rc t:lircd for the personnel gate to
satisfy security re irc?::euts.
f. Three door closers have broken since installation.
g. Chlorinator furnishad is not operative.
JACK A. W C7Y
Lt Colonel, USAF
Base Civil En, necr