BUILDING CONSTRUCTION ON EIELSON AFB BY SHELL OIL COMPANY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP67B00074R000500440008-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 21, 2016
Document Release Date: 
November 13, 2008
Sequence Number: 
8
Case Number: 
Publication Date: 
April 28, 1963
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP67B00074R000500440008-7.pdf134.76 KB
Body: 
Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7 USAF, Aero Systems Div. r Wright Patterson AFB/Ohio HQ Aero, Systems Division Shell Oil Company, 50 W. 50th Street i3. :Contractor shall procure, fabricate and/or install the following equipment and special facilities at Eielson AFB at the site and location designated by the Base Commander orl a) Remove overburden and provide suitable fill to bring site location to grade with adjacent developed area. b) Install a 40' x 120' steel building with tile covered concrete floor. Building to be' insulated and interior partitioned into fifteen, rooms of size and arrangement as designated by the Base Commander or his representatives. c) Above building to be equipped with heating plant to provide hot air central heating and; airconditioning for selected rooms, as speci- fied by above layout. Fuel storage for heating, plant will be provided. (cont. on Page 2). STAT Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7 Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7 Page Two d) Install a covered passageway from building to adjacent existing steel building. e) Provide all electrical power connections' to building including such interior outlets' as designated by the Base Commander or his representatives. f) Provide suitable potable water supply from water well to be drilled in location area. g) Provide suitable septic tank sewage dis-; posal system. h) Provide necessary paved walkways and passages as designated by Base Commander or:his representatives. i) Install additional security fencing and lighting as required and designated by the Base Commander or his representatives. j) Install provisions for communications con- nections as designated by the Base Commander or his representatives. Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7 Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7 lLCB Building Construction on gcls:~n At D 1y S icit oil Company Shell Coil Corlp.ny ATT I: Mr. W. B. 1219 Westl.-'.zZ Av--:,t:o PrQrzi Seattle, Wash APR 2R 1Q64 1. An Inspection of the 40' x i20' : s' .!ni1-:rative facility constructed in the refueling loop area was ma to F.s .u compliance with the plans and specifications developed S :CiL i ;t Comp' yy. This inspection was conducted in the presence of M . :i . D. Vi zt=nnan, this date, by the following personnel: Lt Colo_^i A. '-, -",'%t C L-iN no ring Division 17. 2. Ile s t b f^'tifr i ^rid 7"Zc1 to comply with the plans, specifications and .Air ~. rcc cc.z . _ __~ on r,4- ufrernnents, with the following exceptions: a. Leaks from Chu lk-j t fii=,:x s In t L h^liway between buildings. b. 1.o asp .Ii~ tiLe icy oL1: ?.' :+. C. t:.T3 ,1c ur y r-Ulre on d. Additional pork re ,uircd f i7 dron. e. A Gate c= :' vI.cc rc t:lircd for the personnel gate to satisfy security re irc?::euts. f. Three door closers have broken since installation. g. Chlorinator furnishad is not operative. JACK A. W C7Y Lt Colonel, USAF Base Civil En, necr Copy to )Det 1, 1199 FAS (Capt Dagwell) J"- C/ffl/`//2 0z3-? (L4/ ~- c 7) .2- -? /`'!d Approved For Release 2008/11/13: CIA-RDP67B00074R000500440008-7