DEAR ED:

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP67B00511R000100180043-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 20, 2016
Document Release Date: 
March 21, 2000
Sequence Number: 
43
Case Number: 
Publication Date: 
July 12, 1961
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP67B00511R000100180043-5.pdf72.34 KB
Body: 
Approved Fo&lease 2006/04/13: CIA-RDP67B00500010018004.3 , CO July 12, 1961 The suggestion in letter (30 June 1961x, File 2.3.1.2) is interesting, since the continuous belt avoids the intermittent sampling problem associated with the old driftsight. Whether this will be very accurate depends on two factors: (1) The degree of match which is possible due to fore-aft angular distortion in the driftsight optics; and (2) the time which the operator can spend making accurate fixes. If a driftsight scheme can be considered, it might work as follows. Assuming the driver is capable of setting the device to about 3-5% accuracy, our gear would light an indicator whenever it was operating uncaged and read more than 5% different from the driftsight V/h. The operator would check that this driftsight vetting was as good as he could do, and this would then run the system until the sensor again took over. The operator would only have to set the driftsight whenever the indicator came on, or whenever he felt cloudcover or other special conditions made him more able to set in V/h. (These special conditions would have to be determined by later experience.) Since the "standby" V/h is a feature we require but have not yet frozen in our V/h sensor, we would like to pursue this further. Furthermore, the same sensor will be used in ELG's system, and, perhaps, You'll find it valuable for II or other systems also. Therefore, I'd appreciate it if you would let us know about: (1) The optical dis- tortion; and (2) available operator time. A third point to consider is whether the new driftsight can be modified (by us, by you, by the manufacturer?), in terms of space avail- ability. I assume it is a reimaging system and has an accessible inter- mediate focus, but this should be checked, if possible. I plan to take two weeks vacation 17-28 July, and would appreciate it if we could discuss this when I return. Jules will be in the plant while I'm away, in case there are any questions. Best regards, 04x cc: WHI EPK Cy 2 Mi. M 3"5 Approved For Release 2006/04/13 : CIA-RDP67B00511 R000100180043-5