COST ESTIMATE FOR 'PROJECT (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP67B00657R000200050001-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
18
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 21, 2009
Sequence Number: 
1
Case Number: 
Publication Date: 
February 10, 1960
Content Type: 
SE
File: 
AttachmentSize
PDF icon CIA-RDP67B00657R000200050001-0.pdf800.35 KB
Body: 
Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 71 '/ Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Cost Estimate Prepared by: "Pro iect 'toonsh i ne" February 10, 1960 STAT STAT Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 The purpose of this document is to present a revised cost estimate for "Project Moonshine", in order to accommodate certain re-appraisals which have occurred since the publication of document # 84, "Proposal for Project Moonshine", December 5th, 1959. Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 The changes in estimated costs are essentially the reflection of 1. Optical Fabrication Our manufacturing facility has produced a detailed cost estimate for the 18 f/3.8 Baker Schmidt system. This estimate may be considered as much more accurate than the previous one reported in Document #84 in that the earlier one was based on only qualitative descriptions of possible systems of a variety of over all sizes. 2. Window Materials This cost estimate reflects the possibility of a satisfactory window consisting of only a single piece of quartz. While experiments are now in progress to establish what will be acceptable the facts are not yet known. We here propose that if it proves necessary to provide a more complex window this will constitute a change in scope. 3. Spares This proposal includes the costs of all engineering, fabrication, component tests, assembly tests and system tests in plant, in test vehicles and in the article. It does not include more spares than are now estimated as required for the flight test program nor does it include any support of flight operations after engineering tests are complete. 4. Maintenance and Overhaul (In-Plant) In-plant maintenance and overhaul will be confined to support of systems during their flight test phase, prior to customer acceptance. There is uo consideration for maintenance and overhaul or product improvement as part of "operational" support. Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 This has resulted in a reduction of estimated costs. 5. Flight Test Program (Site) The flight test program will be confined to support of systems during their flight test phase, prior to customer acceptance. There is no consideration for "operational" support at the site. This has resulted in a reduction of estimated costs. 6. aeliability Re-estimates from sub-contractors regarding a parallel V/h sensor program and vibration consulting services, coupled with the assumption that certain "test-bed" facilities will be customer furnished, has resulted in a reduction of estimated costs. 7. Coats Continued engineering establish" the requirement for more accurate gyros for stabilisation. This has resulted in an increase of estimated costs for this area. Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 This cost estimate is divided into six sections, as follows: 1. Prototype 2. Field Support Equipment 3. Spare Parts 4. Flight Test Program 5. Five Additional Systems (2-6) 6. Nine Additional Systems (2-10) Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 1. Estimated Costs for Prototype (Reference Document # 84 for Descriptions of Activities) A. Project Direction (21 months) B. Project Control (21 months) C. Creative Engineering (Excluding Windows) 1. Engineering $ 1,089,000. 2. Purchases $ 100,000. 3. Fabrication 60,000. 4. Travel 40, 000. D. Reliability 1. Engineering $ 180,000. 2. Fabrication 119,000. 3. Sub-Contracts a. Vibration $ 100,000. b. V/H Sensor $ 40,000. c. Environmental . Tests $ 20,000. $ 160,000. $ 3,000. E. Hardware (Excluding Windows) 1. Glass a. Material $ 29,000. b. Fabrication $ 26,000. c. Tooling $ 70,000. $ 127,000. 2. Metal a. Material $ 6,000. b. Fabrication $ 60,000. c. Sub-Contract $ 90,000. d. Tooling $ 27,000. $ 183,000. 110,817.00 $ 192, 162.00 $ 1,289,000.00 $ 462,000.00 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 3. Purchases $ 60,000. 4. Quality Control $ 16,300. 5. Travel $ 8,000. 394,300.00 1. Development a. Engineering b. Fabrication c. Purchases d. Sub-contracts e. Travel $ 160,000. $ 10,000. $ 28.000. $ 15,000. $ 7,000. 2. Manufacturing $ 220,000. a. Material $ 29,000. b. Fabrication $ 24,000. c. Quality Control $ 1,200. d. Tooling $ 10,000. $ 64,200. $ 284,200.00 * See Attachment "A" for Capital Equipment Req'd. in addition to this tooling. Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 2. Estimated Costs for r.eld Support Equipment (Reference Document 94 for 'Description of Equipment) A. Eng -'-leer: ng; class 2? . 200 . 0. Fssrc: ases 25,00('. E. rabr cat'on Sul- contract 25 , Oc?0. ^. Oil.il'ty Control 9.500. ,. Travel $ 3,000. $ 249,700. Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 3. Cost Estimate for Spare parts (iicluding windows) A. Engineering $ 7,898.00 B. Glass $ 50,000.00 C. Purchases $ 30,000.00 D. Fabrication $ 50,500.00 E. Quality Control $ 8,000.00 F. Travel $ 3,000.00 $ 149,398.00 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 4. Estimated Costs for Flight Test Program Number of Systems to be Flight Tested Duration of Flight Tests (at site) Project Direction Project Control In-Plant Support Flight Test Group at site Travel & Field Adjustment Instrumen- tation Total Estimated Costs Prototype only 6 months $31,500. $54,910. $ 72,000. $ 98,000. $35,000. $50,000. $341,410. Prototype and five additional systems 13 months $38,000. $62,000. $156,000. $169,000. $63,000. $50,000. $538,000. Prototype and nine $41,000. $70,947. $204,000. $221,000. $84,000. $50,000. $670,947. additional systems Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 5. Estimated Costs for Five Additional Systems Systems Hardware A. Project Direction $ 30,614.00 B. Project Control $ 56,476.00 C. Engineering $ 261,000.00 D. Reliability $ 27,800.00 E. Glass Material $ 84,000. Fabrication $ 90,000. Tooling $ 10,000. Quality Control $ 6,000. $ 190,000.00 Material $ 145,000. Fabrication $ 80,000. Quality Control $ 5,000. Travel $ 5,000. $ 233,000.00 G. Purchases $ 300,000.00 H. Metal Material $ 5,000. Fabrication $ 410,000. Tooling $ 30,000. Quality Control $ 41,000. $ 486,000.00 1. Travel $ 25,000.00 1,610,390.00 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 6. Estimated Costs for Nine Additional Systems Systems Hardware A. Project Direction $ 48,721.00 B. Project Control $ 84, 639.00 C. Engineering $ 470,000.00 D. Reliability $ 50,000.00 E. Class Material $ 150,000. Fabrication $ 160,000. Tooling $ 10,000. Quality Control $ 11,000. $ 331,000.00 Material $ 260,000. Fabrication $ 140,000. Quality Control $ 9,000. Travel $ 5,000. $ 414.000.00 G. Purchases $ 540,000.00 H. Metal Material $ 9,000. Fabrication $ 740,000. Tooling $ 30,000. Quality Control $ 74,000. $ 853,000.00 $ 45,000.00 $ 2,836,360.00 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009109121: CIA-RDP67B00657R000200050001-0 SCHEDULE "A" SUMMARY OF PRIME COSTS Engineer'g Admin. Plant Service Quality Control Raw Material Purchase Glass Fabr. Sub Trawl Tooling $ AM, 817. Project Direction 110,817. 162. 192 l C 158. $ 88 $ 60 321. $ 43,683. , ontro Project t & D l E r 000 089 1 , , 100,000. $ 60,000. 40,000. 1,289,000. eve opmen ng g bili R li . , , 000 130 119,000. 160,000. 3,000. 462,000. ty e a d a e H t S . , $ 16,300. $ 29,000. 6,000. 60,000. 88,000. 90,000. 8,000. 97,000. 394,300. 0 w ar r em ys Windows 160,000. 1,200. 57,000. 34.000. 15,000. 7,000. 10,000. . 284,20 30,614. Project Direction 30,614. 976. 56 Project Control 26,152. 17,590. 12,934. , Engrg. & Development 27,800. Reliabilit 800. 27 000 262 1 y d H S , 000 261 47,000. 84,000. 5,000. 300,000 500,000. 25,000. 40,000. . , , ware ar ystem Windows . , 5,000. 145,000. 80,000. 3,000. 233,000. 48,721. Project Direction 48,721. 84 639. Project Control 3F,831. 26,56E. 19,240. , Engr'g. & Development 50,000. Reliability 50,000. 45 000 40 000. 2,239,000. System Hardware 470,000. 85,000. 150,000. 9,000. 540,000. 900,000. , . 000 5 , 414,000. Windows 9,000. 260,000. 140.000. . , Field Support, Equipment 89,000. 9,500. 23,200. 25,000. 75,000.; 25,000. 3,000. 249,700. Spares 7,898. 5,000. 50,000. 30,000. 50,500. 3,000. 149,398. Flight Test For (1) 170,000. 62,465. 35,000. 267,465. 31,500. Project Direction 31,500. 42,445. Project Control 25,205. 17,240. Flight Test For (6) 325,000. 64,074. 63,000. 452,074. 38,000. Project Direction 35,000. 47,926. Project Control 28,458. 19,460,. Flight Test For (10) 425,000. 66,127. 84,000. 575,127. 41,000. Project Direction 41,000. 54,820. Project Control 32,550. 22,27). Approved For Release 2009109121: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 SUMMARY OF COST ESTIMATE 1. Prototype Only Prototype-------------------------------$ 2,732,479.00 Field Support Equipment-----------------$ 249,700.00 Spare Parts-----------------------------$ 149,398.00 Flight Test Program---------------------$ 341,410'.00 2. Prototype and Five Additional Systems Prototype-------------------------------$ 2,732,479.00 5 Additional Systems--------------------$ 1,610,390.00 Field Support Equipment-----------------$ 249,700.00 Spare Parts-----------------------------$ 149,398.00 Flight Test Program---------------------$ 538,000.00 3. Prototype and Nine Additional Systems Prototype-------------------------------$ 9 Additional Systems -------------------- $ Field Support RquLpment----------------- $ Spare Parts-----------------------------$ Flight Test Program---------------------$ 2,732,479.00 2,836,360.00 249,700.00 149,398.00 670,947.00 $ 3,472,987.00 $ 5,279,967.00 $ 6,638,884.00 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 SUMVARY OF ESTIMATE Prototype Only Prototype and Five Additional Prototype and Nine Additional Systems Systems prototype $2,732,479.00 $2,732,479.00 $2,732,479.00 Field Support Equipment $ 249,700.00 $ 249,700.00 $ 249,700.00 Spare Parts $ 149,398.00 $ 149,398.00 $ 149,398.00 Flight Test Program $ 341,410.00 $ 538,000.00 $ 670,947.00 Five Additional Systems $1,610,390.00 Nine Additional Systems $2,836,360.00 Prime Costs $3,472,987.00 $5,279,967.00 $6,638,884.00 General and Administrative $ 694,597.00 $1,055,993.00 $1,327,777.00 Total Estimated Cost- $4,167,584.00 $6,335,960.00 $7,966,661.00 Fixed Fee $ 354,245.00 3$ 538,557.00 $ 677,166.00 Total Estimated Cost and Fixed Fee $4,521,829.00 $6,874,517.00 $8,643,827.00 * Costs contained in Attachment "A" are not included in this summary. Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0 Capital Equipment opt. Tooling ".equired for Optical Systems Windows Coating Equipment: 1. Monitoring Equipment $ 6,000. 2. Set of Marrow Band Interference Filters 1,700. 3. Mechanical System for Rotat ors Inside Bell 'nr 4. 1F" p,el1 .' '.rs (f:xtras` 4. 14" Vacuum Syster., $ 4,000. S 1,000. $ 10,000. S 22,700. Grinding :quipment: 1. Tilt Head Blanchard $ 18,000. 2. Milling Mach. & Accessories $ 18,000. 3. Large Sawing Mach. $ 14,000. 4 Troyke Table $ 3,600. . $ 53,600. Polishing Equipment Rebuild Polishing Mach. Fabricate New Turntable $ 3.000. le Spindle Polishers (2) Loh Sin $ 3,200. g $ 6,200. $ 82,500.00 67. ',andliag & :.?.sta]'.atior. $ 6,.,o,%00 $ 89,100.00 S.~g esr this equip:-i^tnr he proc>>rcJ rn4.'-.r C~,- ?: .. RE-4" Approved For Release 2009/09/21: CIA-RDP67B00657R000200050001-0