(UNTITLED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP67B00820R000200030028-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
March 13, 2002
Sequence Number: 
28
Case Number: 
Publication Date: 
December 20, 1963
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP67B00820R000200030028-1.pdf91.79 KB
Body: 
FQfi?A /td ilam pite"Ous L63 EDITJON5 {? DA U. 2000 Z18 DEC 63 TO : DIRECTOR 25X1A ACTIOtk OS A (1-15) 25X1A TO :eloas nn;M f ~~IFmQ~n TOR 0001 Z 19 DEC 63 0 25X1 A REF: A. B. COMPLETION OF MIX TANKS ABOVE - EST. COST $3,450 1 EA. COMPRESSOR FOR TITLER - EST. COST 5 75 1 EA RT DENSITOME TO MESSRS. 7727 S E C R E T 25X1A CITE 7772 25X1A 1. REQUEST AUTHORIZATION TO RENOVATE, CRATE AND SHIP FOLLOWING EQUIPMENT . EXESS TO OUR REQUIREMENTS TO 1 EA. MODEL 3 PROCESSOR MODIFIED 2 EAo MIX TANKS COMPLETE 1 EA. TITLER 1 EA. CLEANER-WAXER-LACQUERER 1 EA, TACKY ROLL CLEANER 1 EA. NIAGARA PRINTER 2 EA. VIEWING TABLES SET SPARE PARTS FOR ABOVE / 25X1A 2. REQUEST AUTHORIZATION TO PROCURE OR FABRICATE, CRATE AND SHIP FOLLOWING FOR SAME PURPOSE. S E C R E T - EST. COST 125 cltOUP I ? c d,d from oa k REPRODUCTION BY OTHER THAN THE ISSUING OFFICE IS PROHIBITED. Copy No. Approved For Release 2002/10/24: CIA-RDP67B00082OR000200030028-1 Approved For Releas 02q10/24: CIA-RDP67B0082OR000200030028-1 25X1A 0 S E C R E T 7772 (IN 55141) PAGE TWO D. I EA. MODEL 3 PROCESSOR MODIFIED EST. COST $40,200? E. 1 EA. -VERSAMAT MODIFIED FOR PAPER - EST. COST $32,500 3. COSTS IN PARA 2 INCLUDE G&A AND FEE WHERE APPLICABLE. HOWEVER, ITEMS 2A, 2D AND 2E WILL BE FABRICATED IN PART FROM SUBASSEMBLIES AND MATERIALS ALREADY CONSIDERED TO BE PROJECT PROPERTY AND COSTS GIVEN ARE NOT TO BE CONSIDERED SUITABLE FOR FUTURE ESTIMATES OR FOR REORDER OF LIKE EQUIPMENT. 4. WE ARE PARTICULARLY ANXIOUS TO RECEIVE APPROVAL ON PARA. 2 SIMULTANEOUSLY WITH PARA. I BECAUSE A. PARA. I EQUIPMENT NOT OPERABLE WITHOUT ITEMS 2 A, 28 AND 2C. B. ECONOMICS CAN BE EFFECTED BY ORDERING 2D AND 2E NOW SO THEY CAN BE BUILT WITH OTHER EQUIPMENT NOW ON ORDER. ESTIMATES IN PARA. 2 REFLECT THESE ANTICIPATED SAVINGS, 5. REQUEST AUTHORIZATION TO SEND EXISTING MODIFIED DAYTON PROCESSOR WHICH RUNS AT 25 FPM TO 0 AND HAVE THEIR DAYTON (10 FPM) RETURNED HERE FOR OVERHAUL. -END OF MSG- S E C R E T 025X1A Approved For Release 2002/10/24: CIA-RDP67B0082OR000200030028-1