FY 1965-1966 U-2 REQUIREMENTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00820R000300120003-7
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
2
Document Creation Date:
December 12, 2016
Document Release Date:
December 10, 2001
Sequence Number:
3
Case Number:
Publication Date:
March 8, 1965
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 74.1 KB |
Body:
25X1A
HANDLE VIA TOP SECRET
COIT(&e elease 2002/05/09 ICfA=DP67BO0820R000300120003-7 /-~ 25X1 A
CENTRAL INTELLIGENCE AGENCY
WASHINGTON 2e. D.C.
25X1
NRO
MEMORANDUM FOR: Director, (S)Nat'ional Reconnaissance Office
SUBJECT: FY 1965-1966 U-2\Requirements
merit in pricing.
manufactured at the..same time with a ,resultant improve-
and "bent-up" materials for the three aircraft could be
economy of conversion in that required long-lead items
models remaining in the Air Force inventory. It is
recommended they be selected for conversion to J-75
configuration during FY 66. Selection of aircraft to
be converted in FY 66 at this time would contribute to
1. Request one additional U-2 aircraft be provided
IDEALIST for conversion to U-2C configuration during the
remainder of FY 65. This aircraft' would be used as a
replacement for ART 358. It is recommended that ART 389
be chosen to meet this requirement since it is scheduled
to enter the plant facility for IRAN on 8 March.
2. The con \t hat there appears to
be approximately in the current contract
for J-75 IRAN/conversions: is is due to the learning
curve, and the economy gained from processing five U-2
aircraft to J-75 conversion on a continuous basis. The
contractor is further of the opinion\that if an addi-
tional J-75 conversion is scheduled in the plant
immediately, the conversion can be done within existing
funditig.
3. Articles 381 and 383 are the 'only two "hard-nose"
ExG ea ram aut Approved For. RRelease 2002/05/09 : , WB00820R0003 - IA
dowaarerla- e??~
aeslie,itl~^~t~ TOP SECRET CONTROL SYSTER
25X1A
25X1A
(Signed) Jack C. Ledfor4
JACK C. LEDFORD
Colonel USAF
Director, Program B, NRO
Approved For Release 20010/9 salq R
IDEALIST
MD/OSA (2 Mar 65)
Distribut ion:
#1 and #2 - D/(S)NRO
#3 - AD/OSA
#4 - D/FA/OSA
#5 - PS/OSA
#6 - PLANS/OSA
#7 - IDEA/OSA
#8 - MD/OSA
#9 - RB/OSA
#10 - Chrono
2270-65
rage 2
25X1A
} ]IDEALIST Downgrade to SECRET
Approved For Release 2002/01 PCSfj.B00820R0003g `Qgg4ached from