TRIP REPORT, 3 - 10 DECEMBER 1968, PROJECT FORTUNE COOKIE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00724R000200060018-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 12, 2016
Document Release Date: 
May 20, 2002
Sequence Number: 
18
Case Number: 
Publication Date: 
December 20, 1968
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP68B00724R000200060018-5.pdf156.37 KB
Body: 
Approved For Release02/06/f ftl&EF 3B00724R000200060018-5 MAW IDEALIST IDEA 0945-68 Copy of- 20 December 1968 MEMORANDUM FOR THE RECORD SUBJECT: Trip Report 3 - 10 D- ember 1968, Projecti 1. Wednesday, 4 December. A formal briefing was presented at Detachment "G" to introduce the 25X1A Project and to initiate Detachment involvement in this project. The following IW-3 cleared personnel were in attendance: 25X1A 2. The following subject areas were briefed: a. The NRO requirement. b. The concept developed to satisfy that ---,,4 c. The Quick Application/Evaluation Program, Phase I, and the follow on, refined program, Phase II. Approved For Release 2002/0f/a0:?tW68B00724R000200060018-5 IDEALIST Approved For Relea2002/06FOP C5kfFM8B00724R000 ;,Q,Q060018-5 IDEALIST IDEA 0945-68 Page 2 d. History of Program development. vehicle characteristics. g. Program costs. h. Phase I approved schedules and suspense'dates based on a 4 November 1968 go.ahead date. 3. Copies of the briefing slides, approved schedules and available data on the were prepared and presented 25X1 to for their discretionary dissemina ion. Detachment- Project Officers were identified as follows: a. Operations - c. Flight Planner - 4. Thursday, 5 December. Traveled to Pacific Missile Range, Pt. Mugu NAS, California to discuss requirement/ procedures for use of the range and its facilities during the flight test and training phases. Other attendees at this conference were: 5. Principle areas of discussion were: 25X.1A 25X1A 25X1A 25X1A Approved For Release 2002/06/0I B00724R000200060018-5 IDEALIST Approved For Release-2002/06T-OP c 8B00724R000~060018-5 IDEALIST IDEA 0945-68 Page ?3 a. Range Scheduling: Top priority will be afforded this project. Procedures for scheduling 25X1A flights were established. b. Range Facilities: All available to support .project and include: (1) Tracking and surveillance radars. (2) Optical tracking. (3)- Post flight data for critique and analysis. (4) Control Center with complete communications and real time tracking information. (5) Air Sea Rescue c. Range Requirements: Defined and will be incorporated into Detachment "G" and Headquarters planning. d. Clearances: FAA and PMR procedures were discussed and a few minor changes to normal operations appear necessary. . e. Security Considerations: All referred to 6. Detailed procedures will conform to Headquarters and?PMR requirements and agreements will be communicated to involved units in the near future. 7. Friday and Saturday, 6 and 7 December. Discussion and work session with Detachment "G" Commander and Project Officers to develop: 0 range safety zone., b. Sample training route to PMR. c. Pilot training program. Approved For Release 2002/0"p O iEi 8B00724R000200060018-5 IDEALIST Approved For Release,,2002/06TQP & 68B00724R000Zp060018-5 IDEALIST IDEA 0945-68 Page 4 Discussions included the forthcoming LAC flight test of the configuration and the operational deployment and employment .of the system. 8. Monday,. 9 December. Meeting with LAC engineers at the "Skunk Works". In addition to the undersigned the following personnel were in attendance: 9. Subjects discussed were: a. Details of the aircraft modification. b. Predicted flight characteristics. c. The LAC flight test program. d. Development of a flight handbook supplement, and?checklists. e. Performance data validation. 10. 'A detailed flight test plan is currently being developed and will.be finalized in the near future. The final format of the pilot training syllabus will be determined from test results and the remaining inventory of vehicles. 11. Monday evening, 9 December. Attended an informal meeting with Beech Aircraft Co. representatives. Attendees in addition to the undersigned were: 25X1 25X1A. Approved For Release 2002/07: St IEFt68B00724R000200060018-5 IDEALIST Approved For Release 2002/06.L13 8BOO724R000200060018-5 P - IDEALIST IDEA 0945-68 Page 5 12. Discussions principally concerned: I b. The radar enhancement modification. c. Development of normal. and emergency procedure checklists. d. Training aids. 13, will be the Beech technical representa- tive for this project and he has agreed to assist in the pilot training program. He will present slide briefings, conduct a hangar classroom and provide technical manuals to be used as training aids. 14. Tuesday, 10 December. Attended.D/M/OSA sponsored interface meeting at LAC,. Burbank. Details of the meeting should be presented in other tr.ip reports 25X1A Division, OSA IDEA/OSA -Distribution: #1 - D/SA #2 - DD/SA #3 - D/R&D #4 - ASD/R&D #5 - COMPT #6 - D/M/OSA #7 - MD/M/OSA #8 - D/O/OSA #9 - SAS/OSA #10 - IDEA/OSA #11 - SS/OSA #12 RB/OSA #13 - Holdback I(20 Dec 68) Approved For Release 2002/0613PD( L-~ P68B00724R000200060018-5 reliability and follow on modification..