OEL/ESL MEETING AT LOCKHEED 22 OCTOBER 1969

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00724R000200190007-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
October 6, 2003
Sequence Number: 
7
Case Number: 
Publication Date: 
October 22, 1969
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP68B00724R000200190007-3.pdf100.68 KB
Body: 
Approved For Release-2003/11/25 : CIA-RDP68B00724R000200190007-3 SECRET IDEA-0993-69 Copy Q of 22 October 1969 MEMORANDUM FOR THE RECORD SUBJECT: OEL/ESL Meeting at Lockheed 22 October 1969 1. The writer received a telephone call from Kelly Johnson this date. Subject was a meeting with OEL and ESL which Kelly was about to attend and in which he would be asked to be a subcontractor to ESL (Electromagnetic Systems Laboratories) who would be prime to OEL for some equipment/ hardware installation in the U-2R known ae His point was th Tie thought he was a prime contractor with LISA on-matters of this nature involving installation and what was going on? Since was an unfamiliar term and might not involve OSA UT, , elly was advised to hold tight until the writer called him back. 2. Investigation revealed that: A. Appropriate OSA components were not aware that an OEL sponsored meeting was scheduled involving Lockheed or the U-2R. B. OEL confirmed that a meeting was taking place; that the subJect was involving a hardware installation into the U-2R; and that Lockheed was alerted yesterday by OEL that they were being considered as a subcontractor to ESL although this was by no means firm in OEL personnel minds as the best approach. 3. The writer advised OEL that a contract mechanism directly between OSA and Lockheed as a prime always has existed and should continue to be used for any proposed equipment installation in the U-2 aircraft. It was further suggested that the OEL representative at the Lockheed meeting 25X1 25X1 Approved For Release 2003/11/25 : CIIA RDP68B00724R000200190007-3 SECRET Approved For ReleasawR003/11/25 5%I P68B00724R0002QQ190007-3 IDEA-0993-69 Page 2 be contacted as soon as possible and so advised to preclude further embarrassment. (ESL certainly can and should be a prime or associate-prime contractor to OEL on the development of such equipment. ESL can be either a sub or an associate-prime on the installation but Lockheed must be prime and responsive to OSA.) 4. The writer then called Kelly Johnson and advised him that he should be responsive directly to USA via the existing LK-3600 series contracts for equipment scheduled for installation in the U-2R aircraft. He was also advised to be cooperative and offer as much help as possible to OEL/ESL regarding the interface between the proposed equipment and the aircraft. 25X1 Research and Development Special Activities D/R&D/USA anw/22 Oct 1969 Distribution: Copy 1 D/R&D/OSA 2 - D/SA 3 - C/CMD/COMPT/OSA 4 - D/M/OSA 5 - COMPT/OSA 6 - S8/OSA 7 - D/O/OSA 8 - RB/OSA SECRET Approved For Release 2003/11/25 : CIA-RDP68B00724R000200190007-3