CRITIQUE FOR OXCART MISSION NUMBER BX6738
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP69B00041R001300020003-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 12, 2016
Document Release Date:
March 7, 2002
Sequence Number:
3
Case Number:
Publication Date:
December 18, 1967
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 116.69 KB |
Body:
I'CI' SEC;TtL:`1'
Approved For Release ?MN6 1 4IAI69B00041 R001300020003-0
25X1A
2750-67
Copy 6 of 11
18 December 1967
MEMORANDUM FOR TTIF, RECORD
SUBJECT: Critique for OXCART Mission Number BX6738
at 1400 hours, 13 December 1967..
1. Mission critique was conducted in the OSA Control Centeitt
2.
Mission Data:
a. Mission
Number:
BX6738
b. Date Flo
wn: 10 De
cem
ber
1967
c. Area of
Operation:
Cambodia
d. Mission
Success?
uc essful 25X1A
e. Pilot's N
ame:
f. Aircraft
Number:
131
g. Primary
or Spare
Flow
n:
Primary
h. Takeoff
Time Pl
anne
d:
02002
Ac
tual:
0159Z
i. Landing
Time - Pl
anne
d:
0611Z
Ac
tual:
0550Z
j. Time En
route - Pl
anne
d:
4+11.
Ac
tual:
3+51
k. Departur
e Base: K
ade
na
AB
1. Landing Base: Kadena AB
m, Equipment:
25X1 D
1 Primary: Type I,
(2) Spare: Same as_ primary.
GROUP i '. HANDLE VIA
25X1 D
25X1A
Excluded Irorrl nut,matic COMINT CONTROL
do r d
w
ng .an nr CHANNELS JOINTLY
OXCART/ TRINE
Approved For Release 2QlX'2MMC8 'RDP69600041 R001300020003-0
T011 sl.'GRET
Approved For Release 21O /dAWt 69B00041 R001300020003-05X1 A
12750-67
Page 2
3. Operations:
a. Route (INS Plot vs. Planned): Satisfactory.
(l) (.crtllttt('tltti: Aircraft t4li.l lttly (rvoralant pialitio'd track
during turns.
25X1 D 25X1 D
(2) INS Terminal Error:
(3) INS Spec Error:
C
0
b. Mission Generation & Operational Support: Satisfactory.
4. Weather:
a. Forecast vs. Actual:
(1) As briefed.
25X1A
(2) Comments: Forecast Cat II; few patches Cat III thin
cirrus. Pilot reported generally Cat I. reported 95
percent cloud-free on first pass and 75 percent on second
pass for primary and secondary target areas.
b. Weather Scout Reporting: Satisfactory.
5. Intelligence:
a. Target Coverage:
High quality, virtually cloud-free coverage was obtained on
the seven priority search areas in Northeast Cambodia. No
significant activity was noted.
In other areas, valuable photography was accomplished on
certain roads and trails in Southern Laos, Northeast Cambodia
and the tri-border area.
b. Quality of Take: Satisfactory.
25X1A
HANDLE VIA
COMINT CONTROL
CHANNEL$ JOINTLY
OXCART/TRINE
Approved For Release 20i' /t/ qb94bP69B00041 R001300020003-0
Approved For Release 226 lki16/: WEP69B00( AaA300020003-0
750-67
age 3
6. Materiel:
c. Hostile Reaction: None.
d. Significant Findin s: None.
25X1 D e.
f. Take Movement:
25X1 D
25X1 D
25X1A
25X1 D
a. Investigate INS/autopilot overshoot on turns (Materiel Division).
25X1A
Deputy for Operations, OSA
a. Aircraft General: Satisfactory.
b. Aircraft Systems: Satisfactory.
(2) Camera Operation: No major discrepancies or
problems reported.
a. Message Traffic: Satisfactory.
b.
c. UHF/HF Commo: Satisfactory.
8. Significant Actions Taken:
25X1A
Fli ht plans revised to provide 1. 2 MACH at FL290 to
I irefueling area.
9. Outstanding Actions Required:
OXCART/ TRINE
Approved For Release 2211 )iPW-$ DP69B00041 R001300020003-0
OXC/O/OSA/1
Distribution:
#1 - D/SA
TOP SECRET
Approved For Release .A fJD/:t1 RBP69B00041RG PA20003-0
25X1A
#2 - D/O/OSA
#3 - D/M/OSA
#4 - D/R&D/OSA
#5 - OXC/O/OSA
#6 - Intel/O/OSA
#7 - Wea/O/OSA
#8 - Commo/O/OSA
#9 - ADP/ O/ OSA
# 10 - RB/OSA
111 - Chrono
2750-67
Page 4
25X1A
JOINTLY
OXCART/ TRINE COMINT CONTROL
.Approved For Release 21)W@ W RDP69B00041R 3L 03-0
HANDLE VIA