APPENDIX I REVISION NO. II

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP69B00279R000100090001-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
115
Document Creation Date: 
December 12, 2016
Document Release Date: 
June 20, 2002
Sequence Number: 
1
Case Number: 
Content Type: 
STATEMENT
File: 
AttachmentSize
PDF icon CIA-RDP69B00279R000100090001-5.pdf5.55 MB
Body: 
ECP NO. STAT 22-1-1 STAT 22-2-1 22-3-1 22-5-1 , - 0001300 79RGOO1C0090001-5 APPENDIX I REVISION NO. II' DESCRIPTION 22-6-1 Improved Distance Measuring for ARC-50 22-7-2 ARC-50 Ground Stations 22-8-1 Liquid Oxygen System Installation in Vehicles 4132 and #133 22-9-2 22-10 22-11-1, 22-12-1 22-13-1 22-14 22-715 22-16 Lightning Tests Suit Vent Air System Regulator Oxygen System Balance Valve A-12 Parachute Improvement Program.. Periscope Improvement Program Revised INS Rack Installation Oxygen System Low Pressure Warning Light 22-17 Replace Control Stick Grips on A-12 and AF-12 22-18-1 Retrofit LOX System - A-12's (Already accomplished on #132 and #133) STAT . 22-19 * Redetermined Item. STAT TARGET PRICE CEILING PRICE Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 (?ECP NO. . STAT' 22-20 22-23. 06110411,64. AjR p.0002711,900100090 01-5- DESCRIPTION 22-22-1 Tacan in all A-12's except #121 and 124. See ECP 22-75 for #124 STAT 22-23 22-24 22-25 22-26 22-27-1 STAT 22-28_1 STAT TARGET PRICE CEILING PRICE Drag Chute Deploy Handle Aero-Med Instrument Periscope Projector Film Destruct System Map Case Destruct System 22-29-1 Pilot Voice Recorder 22-30-1 Compressor Inlet Pressure Indicating System ( 22-31-1 SR-3 Improved Gyro Reference Heading System #I24. See ECP 22-74. 22-32-1 Improved Fire Wirning System 22-33 Structural Strength ? ? 22.,34 Chine Mod and Refrig.,. - 22-35..1 All :Altitude Fuel Quantity System 2236-1 :Airplane Control System Checkout Cart (4) 22-37-1 , World Wide Capability plight Tests 22-38 Increased Fuel Quantity Study 22-39 New Servos-Inter-System Leakage 22-40 Dual Initiator Qual. 22-41 Stall Warning System 22-42 Six Addi-(ional Cap Nap (LeCroix) * Redetermined Item. Approved For Release 2002/08/16 : CIA-RDP69B00279R000100090001-5 (7; ECP NO. -DESCRIPTION _TARGET PRICE STAT STAT 22-43-1 Replace install new Contro1 Unit Improve Pilot Fuel Control Capability Enlarged LN2 Fuel Remaining Instrumentation ARC-50 ADF Antenna Study Only ADP Air Inlet Control Fuel Management Revision JC-130 Command XMTR and Recovery Chute Systems AIC Prototype Changes 22-44 22-45 22-46 22-47 22-48-1 22-49-1 22-50-1 22-51 22-52 22-53 22-54 22-55 22-56-1 ? 22.-57-1 22-58-1 Type I Camera Provisions A-12 Mod, Studyjp2 Incr. & Stl. Gudgeon Roll, Pitch and Yaw Study Hydraulic Rework - ZEE Can Engine Oil Pressure Transmitter Etsign' Improvement Testing. II Hatch 22-60 Inlet Control InstruientatiOn . 22-61 Not Used 22-62 . AF-12 Seat and Parachute Rework Program 22-63-1 Fuel Cooling System 22-64-1 Fuel Qxantity Modification to Five KC-135's * Redetermined Item. Approved For Release 2002/08/16 : CIA-RDP69 STAT CEILING PRICE pooloo090061-5 STAT TARGET PRICE CEILING PRICE -ECP NO. 22-65-1 22-66-1 STAT 22-67 DESCRIPTION ARC-52 AY Installation Kits for Five KC-135's Alternate Steering System for A7-12's 22-68-1 Retrofit of Production ADP Inlet Control into S/N's 134 and 135 22-69 Drag Chute Improvements 22-70 Improved Wheels and Brakes for A-12 22-71-1 Forward Look Periscope 22-72-1 Retrofit of Production ADP Inlet Control into all YF-12A's 22-73-1 Hydrogen Ignition System for YF-12A's 22-74 SR-3, 4124, Breakout of 1 ship from 22-31 for laterinktallation TAW #124'' err, 22-75 from EC!, 22-22or later of aaltla . t, Breakout t STAT 22-76 V.129, 131. Breakout .p pa om2-EqP 22-43-1 for later 'Anstallation. TOTAL * Redetermined Item. Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 I. REDETERMIRED ITEMS ECP NO. 2g-i-i 22-2-1. 22-3-1 22-4-1 22-5-1 22-6-1 22-7-2 22-8-1 22-9-2 22-10 22-11-1 . 22-12-1 22-13-1 22-14 22-15 22-16 22-19 22-20 22-21 22-24 22-25 22-26 22-33 22-34 22-38 22-39 22-40 22-42 22-44 22-45 22-46 22-47 22-48-1 22-52 22-53 22-55 22-59 22-60 22-61 22-62 22-63 22-67 22-69 22-70 SUB TOTAL SUMMARY TARGET PRICE CEILING PRICE Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 II. ITEMS TO BE REDETERMINED ECP NO. 22-17 22-18 22-22-1 22-23 22-27-1 22-28-1 22-29-1 22-30-1 22-31-1 22-32-1 22-35-1 22-36-1 22-37-1 22-41 22-43-1 22-49-1 22-50-1 22-51 22-54 22-56-1 ? 22-57-1 ? 22-58-1 22-64-1 22-65-1 22-66-1 22-68-1 22-71-1 22-72-1 22-73-1 22-74 22-75 22-76 SUBTOTAL GPM TOTAL TARGET PRICE CETT.TNG PRICE Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 BACRXT ti s 704X4011 to year ter of 3 February 1965 monthly report ea ove OXCART Burma spproved by Director Program B, is accordasce with the limitation set deem and also a progress report on pre- view:say approved chaagee. this memorandua restricts itsell to reportimg on XCIPis approved gime, 6 February. A separate report till be mods on theme previous coved. Zech SCP included in this report was under 2. Director, Mamma 11, approved the *CP 's MAW be- low en 2 larch 11413, MCP 21-2 Mee ant Dedgetary est ammo 1 wale* is te ? prototnno. 11111s range and to improve with the tanker*. Di capability, This AP covers develop amid test reqmired to increase reodesvous oapabilitY 25X1 25X1 NRO ? 25X1 25X1 25X1 Pilot 'Voice This is a recorder con- bised with a datreot system for all Ar.12 siraraft, and *over* selection of the re- corder, development of a destruct eritein, and produetien of kits for installation. This had been previously requested by Director, Program 11, and the MCP represent* the formal payees'. Xstimmted cost is This includes installation and spares. This change will increase recording time to an acceptable level. Cfithi? 1 Excluded frm automatic down:Jading and declassification Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25)0 251 Approved For Release 2002/08/16 : CIA-RDP69B00279U00100090001-5 MIST P 1241 Modification* to the Lockheed islet Us =PI ?over* dollop dowerodimmt and many- isobar* of eempeseats required to incorporate islet cemtrol modifications on aircraft 120, LSO sad 121. The change will reduce call- bratioa time coasiderably and will provide mere secarete sad pore reirlo Mach eensora. Metimated oast is' MCP 14 Modificatiaa to aircraft 121, 122 and 131 fur /rips 1 emus= installation. (Other aircraft see already so oonfigered). This will enable all aircraft to be capable of flying agora tiemal missions with Type 1 camera. estimated cost is MCP de Measurement of roll pitch and yaw. This cowers the desiga and mamafactare of ems eemparater system sad dowetopmest of computer prisms required to molars* data of Type mod 1,1* 11 camera systems. it in intended to improve both the p.rforaanc. an ef the system*. tiast.d cost in 25X1 25X1 25X1 25X1 25X1 gross of tbisim Mos will be reported at a later NRO 25X1 25X1 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 Approved For Release 2002/08/16 : CIA-RDP69B002792000100090001-5 4 - AD 6 - 11/1110/06A 6 DAPA/06A ? - 00/08A ? - MASA O - WINC6/064 (Owosso 10 - SS/06A ro 1 1or (4 r.h 1066) 61101111T Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 25X1 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Next 1 Page(s) In Document Exempt Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Rvatase 2002108/16: CIA-RDP691300279ROW0100090001-5 IN ?15I -S E C Y F. T PAGE 2 ECP- 67" 13,:t NACELLE SW ING JO INT PIPING REV ISION SR- 7. S R WO ? - VIOU 't APPROVED. ECP-67-i12) FUEL CROSSFEED VALVE POSITION INDICATOR SR-71. e- (A/ ----- pip ? ECP -SR - 71-19 /3666-.1.39 CO IVA T ID IL IT Y CHANGE SE. APPROVED UNDER SEPARATE LETTER. 7 ECP.-22--72-2 "ETROFIT 07 PRODUCTION AD INLET CONTROLS IN ALL Y -I2A'S- .. __a_ ? - XIS iSA PRICE REDUCTION CHANGE. DISPOSITION- INSTRUCTIONS FOR EXCESS PART S A ND MATER IAL W ILL BE PRO V IDD BY T HE SPO AT A LATER DATE . E . C E T TOR : ? 011959Z AUG 67 C R E Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 104 t NO ' Approved For Rete 200210,814.6:). 9B0027913-4001. 000 r ECRET 04-5: " ----------- N Ii ILLEGIBU 25X1 -tV! 9i5t 25X1 I 25X1 25X1 25X1 FO SECRET t3 I 19.33Z CITE 11 'NFO 25X1 25X1 25X1 25X1 SUBJ APPROVAL OF ECP' S AT T N FM I I HE FOLLOWING ECP' S ARE TECHNICALLY APPROVED ECP-67' in EMERGENCY FACEPLATE HEAT PROVISIONS FOR ST AB IL IZED SEAT - SB -5911 IS DISAPPROVED AS WRITTEN IN FAVOR OF COMBINING ESE PROVISIONS WITH BATTERY INST ALLAT ION IN A SINGLE SERVICE ' BULLETIN. ECP-67-I08, EMER ENCY BATTERY POWER Map SR-71. . ECP- 67-104 FILM TRANSPORTS- MOD Fpli - SR - 71 SIMULATOR COST OF INSTALLAT ION_ AND CHECKOUT WILL BE" A CHARGE AGAINST LW-3602 CONTRACT . A SECRET 5 , 1 tanin. 1 tttc:rpn f4:5:-,.., m4540.1 NATIa COV4:4474t4.41140 I 4,4151.1. l'Act.A5171A14."AItC514 1 vNt". Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 or-reveieeee-teeiletifit-retAIRIDP69130D27G-i000100096001-5 LOCKHEED-CALIFORNIA t3OMPA1Y ENGINEERING STUDY n CHANGE PROPOSAL Ea) rt, A. c 22-56-2 DATE 16 JUNE 1967 AFFECTS: 0 PROJECT In NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE , TITLE OF PROPOSAL : MEASUREMENT OF ROLL, PITCH AND YAW' NATURE OF PROPOSAL: This ECP mill provide a method of accurately determining airplane roll, pitch and yam. A 70mm camera will be fixed to the structure of the airplane and will be run at the same time 88 the Type I or Type II system. This ECP includes the design and manufacture of one comparator system,development of the computer program required to analyze comparator data and one (1) ata run with Type I or Type II System. REASON FOR PROPOSAL: This ECP provides a method for checking the performance and , quality of the airplane camera systma. For a more eamprehensive description of this program, please refer to the letter J 7to Jo:inn Parangosky, dated 3 September 1964 on the subject of Am.12 optical provisions. Budgetary ECP approval TWX Reason for Revision* To reduce the ECP scope to the design and development of the computer program and analyze the initial data run in lieu of 5 data runs and to revise the proposed Target Price accordingly. , . ES ESTIMATED COST AND TIME INVOLVED : N/A ADDITIONAL FUNDING REQUIRED: i. C P ESTIMATED COST FOR KITS OR PARTS : (See Page 2.) ADDITIONAL FUNDING REQUIRED: , ITEMS AFFECTED BY PROPOSAL : r--- SAFETY 0 MISSION EiTEC- 1 IVENESS 0 PEFRM-SMI aCE 0 ZLM Ill INTER. CFA -WEI ABILITY Li EIVTI*T?at IT S. BALANCE 0 SUPPORT EQUIPMENT El AIN1."MCI PROCEDURE rA1 li DiD Lt2L irWI4- NP4(1 MANUAL EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT AVAILABILITY WEEKS. AFTER APPROVAL N/A DISPOSITION OF SPARES AFFECTED Si NF NIA r---- L INITIATED BY : APPROVED : I 1 1.2 ? -0 ? . PROJEC . - ? 1 '1'7 -3PAt.F 1 OF 2. STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 ? LO 1 am-CALIFORNIA COMPANY ENGINEERING STUDY CHANGE PROPOSAL II 3 njy 22749-2 NRO DATE 16 JUNE 1967 AFFECTS : 110 PROJECT ri 25X1 NAME OF MAJOR COMPONENT FUEL TANKS PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL FUEL MANAGEMENT REVISION NATURE OF PROPOSAL: This ECP covers the engineering design and fabrication of kits riired to ..? .e the fuel tank sequencing of tanks #3 and #4 in A.12 aircraft(g) 125-132 13 and Also included are kits necessary to accomplidh the transfee of fuel from to tank #6 and stop the transfer vthen 6800o pounds of fuel re. main in tank #2 in aircraft 121, 122 and 125-132. Partial kits vill be provided for the transfer of fuel from tank #2 to tank #6 for aircraft 134 and 135. :Included in the kits will be: Part Number Noun Ski 7-860-1 Shutoff Vag-- . 6-160-1 Pressure Refueling Valve . 2 7-160-1 , Pilot Valve 2 REASON FOR PROPOSAL: This ECP will result in tank #4 being the last tank in the fuel sequencing. As a result, the C.G. of the article viii be moved further aft for a greater portion of the cruise condition. Moving the C.G. aft reduces trim drag, and results in greater range. . ? Reason for Revision: To reflect that partial retrofit kits for the transfer of fuel tank #2 to tank #6 in aircraft 134 and 133 will be provided and to reduce the proposed TarrlIce accordingly. The valves procured for these aircraft will be shipped to th or use as field spares. This ECP was approved by Headquarters Message 2341, dated 10 February 1965. S ESTIMATED COST AND TIMEINVOLVED : . NA ADDITIONAL FUNDING REQUIRED : IESTIMATED ! CP COST FOR KITS OR PARTS: s (See Page 2.) ADDITIONAL FUNDING REQUIRED : , ITEMS AFFECTED BY PROPOSAL : 1 1-. SAFE1Y 1 1 1 0 MISSION I f f EC- TIVENESS 0 PERFORM- ANCE OPERATING PROCEDURE INTER. CHANGE- ABILITY WEIGHT OR WEIGHT IS BALANCE TO01.5 SUPPORT EQUIPMENT 111 IL MAINTE- NANCE PROCEDURE SERVICE LIFE RIGHT MANUAL MAINTE . NANCE MANUAL 0 MAN/HRS. Raft. TO ACCOMPLISH CHANGE IN FIELD 1EST. SOURCE OF PARTS FOR KiT4ADP will furnish under Service Bulletins 649,818,819,871, 878 and 904. AVAILABILITY WEEKS AFTER APPROVAL IDISPOSITION OF SPARES AFFECTED NOTED ON SERVICE BULLETINS :- INITIATED BY : . i L _ ____Aolged For Release 2002/08/16 ! CIAIRnPR9RnI1279R000100090001-5 APPROVED : STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved ForRelease2WailintiAlATIEF6990(1279Fr0;0100090001-5 LOCKEED-CALIFORNIAcompAn CHANGE PROPOSAL Rau.: 22.30_1 Ii DATE 11+ %TANURY 1966 AFFECTS: El PROJECT NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL : ? COMPRESSOR INLET PRESSURE INDICATING SYSTEM NATURE OF PROPOSAL: This system would enable the pilot to see the total inlet pressure in ,each_compressor and the reouired total pressure on a triple indicator.? (See att- ached pages 2 - 3 for technical description). This BOP covers the following activities: 1. Design and development of the Pressure Indicating System. 2. Engineering design required to incorporate the System in A.I2 and YF-12A Air..- craft. 3. Fabrication of retrofit kits for all A-12,Articles except- SiN 1211., andall YF-12A aircraft. ' The affect of this systed on the R-12 program will be covered on a separate 1IT-3664 ECP. (Continued on Page 2.) REASON FOR PROPOSAL 1. Inlet pressure recovery can be directly checked during climb and cruise. 2. Will permit pilot to determine if inlet controls are functioning in a manner that will allow completion of mission range. 3. This is only indication of inlet pressure recovery. 4. Present pressure recovery instrument now in use is simply made from a converted dual reciprocating engine manifold gauge. It has been planned to replace this with a true pressure recovery indicating system when sufficient flight test data was available to make tbis possible. . 5. Pilot can read small aircraft yaw angles from differences in right and left inlets (Continued on Page 3.) ES ESTIMATED COST AND TIME INVOLVED : N/A ADDITIONAL FUNDING REQUIRED CP 1' ESTIMATED COST FOR KITS OR PARTS : (See Page 4.) ADDITIONAL FUNDING REQUIRED : ITEMS AFFECTED BY PROPOSAL ..---. SAFETY [ IIIDO MISSION EFFEC. IIVENESS PERFORM. ANCE - OPERATING '- PROCEDURE DO INTER- CHANGE. ABILITY WEIGHT OR WEIGHT & BALANCE 0 TOOLS SUPPORT EQUIPMENT in & MAME. NANCE PROCEDURE 0 SERVICE LIFE ii FLIGHT MANUAL El / MAINTE? AF44= ID EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD ------, SOURCE OF PARTS FOR Ka ADP will furnish AVAILABILITY WEEKS AFTER APPROVAL under Service Bulletins A-662 and AF-345. cl DISPOSITION CW SPARES AFFECTED . PARTS WILL BE RETURNED TO DEPOT FOR DISPOSITION. U)S INITIATED BY : ? ADP APPROVED : PROJECT ZE 1337 Approved For Release 2002/08/16 : CIA-RDP69B00279611100090001P-A lOF 4. 3 RO 25X1 ECP 22-30-1 Approved For Release 2002/08/16 : CIA-RDP691300279Rb00184990M1f154. 14 January 1966 NATURE OF PROPOSAL (Continued)-- The proposed system calculates and provides a visual display of the pressure defined by the expression, P = Ve 2P400. Visual displays of actual left and right static 400 pressures are provided in such a manner as to permit comparison with the calculated pressure. The pressure display is obtained through the use of a triple pointer indicator. A separate electronics package houses the associated amplifiers and bridge circuits. Potentiometer type pressure transducers are employed to convert the left and right static pressures into an electrical signal. Intelligence for use in the pressure calculation is obtained by means of Characterized potentiometers located in and driven by the Air Data Computer. One of the potentiometers located in the ADC is characterized to produce an output which is proportional to Ye 2. The second potentiometer is characterized to produce 400 an output which is proportional to 1 . These potentiometers, in conjunction with Fr+134. two (2) fixed resistors and two (2) trim potentiometers, constitute one half (i) of a Wheatstone bridge. Trim pots and resistors in the electronics package and a re- balance potentiometer in the indicator, make up the second half of the bridge. Bridge Unbalance is amplified and a servo motor drives the indicator potentiometer wiper to the position required to restore balance. Indicator - The proposed triple pointer indicator contains three (3) motors, three (3) gear trains, and three (3) rebalance potentiometers within a single square case. The' indicator places the calculated pressure in the form of a bug type pointer which provides visual representation of an allowable pressure band width. Approved For Release 2002/08/16 .: CIA-RDP69600279R000100090001-5 cp or 4. Approved For Release 2002/08/16 : CIA-RDP691300279RO001000900014 Je.nun_ry 1966 Control Unit - This unit contains the three (3) bridge circuits and the three (3) amplifiers required for the system. Internally, this device consists of five (5) rectangular circuit boards which FLre supported from the bac:I:plate by means of standoffs. :ix (6) potentiometers are lo- cated under a cover on the backplate and are used for field adjustment of the system. Two (2) multipin connectors are employed for making electrical connections. The circuit used to calculate pressure is essentially a Wheatstone bridge. Ralf of the bridge is located in the control unit and the other half is in the ADC. Pressure Transducer - The proposed pressure transducers are of the bellow/potentio- meter type. Provisions can be made to attach these units to the control unit or they may be situated at some other convenient point. These devices will be in a location which will minimize the required pressure line run. REASON FOR PROPOSAL (Continued) 6. When used with the Lockheed inlet control, this indicator will be used also to peak 121) the inlet performance when using the manual mode. This indicator is most essential when on manual mode in order to obtain maximum ensine performance without inlet blowout. 7. This indicator, of course, tell when the inlet is started. Red!:,on for .ovision: To submit Proposed Taret Price. This price reflects a reduction in the engint!erin and. mmufacturinc effort, the material costs and the deletion of shin 124. This 'SOP was apl)roved by deadquarters Message 2341, dated 10 February 1965. Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release LOCYJIEED - CALIFORNIA COMPANY 2002/08/16 : CIA-RDP6960027 ENGINEERING STUDY CHANGE PROPOSAL II g ? R000100090001-5 ti, A r 22_30 ,... i 1 DATF114. October 19611 AFFECTS: M PROJECT T", r NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL: COMPRESSOR INLET PRESSURE INDICATING SYSTEM NATURE OF PROPOSAL: This system would enable the pilot to see the total inlet pressure in each compressor and. the required total pressure on a triple indicator. (See attached pages 2 - fnr technical description.) This ECP covers the following activities: 1. Design and. development of the Pressure Indicating System. 2. Engineering design required to incorporate the System in all A-12 and AF-12 Aircra 1 3. Fabrication of retrofit kits for all A-12 and AF-12 Aircraft, 4. Installation on all A-12 and. AF-12 Aircraft. The affect of this system on the R-12 program will be covered on a separate HT-3664 EC i , (Continued- on Page 2) REASON FOR PROPOSAL : 1. Inlet pressure recovery can be directly checked. during climb and cruise. 2. Will permit pilot to determine if inlet controls are functioning in a manner that will allow completion of mission range. 3. This is only indication of inlet pressure recovery. 4. Present pressure recovery instrument now in use is simply made from a converted dual reciprocating engine manifold gauge. It has been plaipaed to replace this with a true pressure recovery indicating system when suff14ent flight test data was available to make this possible. 5. Pilot can read small aircraft yaw angles from differences in right and left inlets. I (Continued on Page 3) . ESTIMATED COST AND TIME INVOLVED ADDITIONAL FUNDING REQUIRED: C P ESTIMATED COST FOR KITS OR PARTS: ECP Budgstary Target Price See Page 4. Est. of R'ol. Program Costs ADDITIONAL FUNDING REQUIRED: Total Program Cost ITEMS AFFECTED BY PROPOSAL : I ??????n SAFETY 111 MISSION EFFEC- 1 I VE NESS 0 PERFORM- ANC E 0 OPERATING PROCEDURE 0 INTER- CHANGE- ABILITY M WEIGHT OR WEIGHT I BALANCE 0 TOOLS SUPPORT EQUIPMENT II & MAINT PROCEDURE E. NANCE In SERVICE LIFE 0.1 FLIGHT MANUAL MAINT E. NA NC E MANUAL 0 EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT AVAILABILITY WEEKS AFTER APPROVAL SERVICE BULLETIN TO BE WRITTEN DISPOSITION OF SPARES AFFECTED PARTS WILL BE RETURNED 'TO DEPOT FOR DISPOSITION INITIATED BY : LAC ? - ---?-- APPROVED : --- ------ - . _ 1337 pprove or e ease UUIV?I1b : - E1 OF i. RO 25X1 TAT STAT 'IRO 25X1 Approved For Release 2002/08/16 : CIA-RDP696002791400bgb0bdie1-5 Page 2 of 4. NATURE OF PROPOSAL (Continued)-- The proposed system calculates and provides a visual display of the pressure defined by the expression, P = Ve 2P400. Visual displays of actual left and right static 400 pressures are provided in such a manner as to permit comparison with the calculated pressure. The pressure display is obtained through the use of a triple pointer indicator. A' separate electronics package houses the associated amplifiers and bridge circuits. Potentiometer type pressure transducers are employed to convert the left and right static pressures into an electrical signal. ,Intelligence for use in the pressure calculation is obtained by means of Characterized potentiometers located in and driven by the Air Data Computer. One of the potentiometers located in the ADC is characterized to produce an output 2 which is proportional to Ve . The second potentiometer is characterized to produce 400 an output which is proportional to 1 . These potentiometers, in conjunction with 4FTO two (2) fixed resistors and two (2) trim potentiometers, constitute one half (i) of a Wheatstone bridge. Trim pots and resistors in the electronics package and a re- balance potentiometer in the indicator, make up the second half of the bridge. Bridge unbalance is amplified and a servo motor drives the indicator potentiometer wiper to the position required to restore balance. Indicator - The proposed triple pointer indicator contains three (3) motors, three (3) gear trains, and three (3) rebalance potentiometers within a single square case. The indicator places the calculated pressure in the form of a bug type pointer which provides visual representation of an allowable pressure band width. Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69B00279R0001n9Ggi13- Page 3 of 4. Control Unit - This unit contains the three (3) bridge circuits and the three (3) amplifiers required for the system. Internally, this device consists of five (5) rectangular circuit boards which are supported from the backplate by means of standoffs. Six (6) potentiometers are lo- cated under a cover on the backplate and are used for field adjustment of the system. \ Two (2) multipin connectors are employed for making electrical connections. The circuit used to calculate pressure is essentially a Wheatstone bridge. Half of the bridge is located in the control unit and the other half is in the ADC. Pressure Transducer - The proposed pressure transducers are of the bellowshotentio- , meter type., Provisions can be made to attach these units to the contra unit or they may be situated at some other convenient point. These devices will be in a location which will minimize the required pressure line run. REASON FOR PROPOSAL (Continued) -- 6. When used with the Lockheed inlet control, this indicator will be used also to peak up the inlet performance when using the manual mode. This indicator is most essential when on manual mode in order to obtain maximum engine performance without inlet blowout. 7. This indicator, of course, tells when the inlet is started or unstarted. This ECP was Item 0 on our 30 April 1964 ECP listing. We are proceeding based upon approval given in H's TWX 6882, dated 12 May 1964. Approved For Release 2002/08/16: CIA-RDP69B0b27814800100090001-5 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 _ Approved For Release LOCKHEED-CALIFORNIA C01.4PANY 20gigt/i1E6RI:NCdAs-lyg69Bn279000100090001-5 CHANGE PROPOSAL E 1 ft, A. C 22-29-1 I DATE 14 JANUARY 1966 AFFECTS: II PROJECT 0 NAME OF MAJOR COMPONENT VOICE RECORDER PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL : PILOT VOICE RECORDER NATURE OF PROPOSAL: This ECP provides a destructible pilot voice recorder in all A-12 Aircraft (13 Ships). The program includes the selection of the recorder, development of a destruct system, modifications to the recorder to increase recording time to the level consistent with minimum plaYback intelligibility of sound, and production of kits required to incor- porate the recorder system on all A-12 aircraft. . . REASON FOR PROPOSAL: This program satisfies Headquarters revir6ment for a destructi- ble scratch pad for pilots. The recorder selected as best applicable for tlis re- 1 quirement is a Dictet which is modified to slow down the speed and add a series of Exothermus Tape for destruct capability. This recorder is outfitted with i mill tape and provides approximately one hour plus of recording time. The recorder is energized by an on-off switch and started by means of the pilot microphone button. The recor time provided should be sufficient for all operational missions presently planned. The destruct system is triggered by pilot ejection. This ECP was approved per Headquarters Message 3690, dated 5 March 1965. Reason for Revision: To submit Proposed Target Price. This price reflects increased developmental costs. ES ESTIMATED COST AND TIME INVOLVED : NiA ADDITIONAL FUNDING REQUIRED: ? CP ESTIMATED COST FOR KITS OR PARTS : (See Page 2.) - ADDITIONAL FUNDING REQUIRED: ITEMS AFFECTED BY PROPOSAL : SAFETY MI MISSION Ef FEC. *I IVENESS . PERFORM- ANCE OPERATING PROCEDURE INTER- CHANGE- ABILITY WEIGHT OR WEIGHT & BALANCE - TOOLS SUPPORT EQUIPMENT 111 I MAME- NANCE PROCEDURE IIII SERVICE LIFE III ir FLIGHT MANUAL 1 II MAI NANCE MANUAL NTE- III EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT ADP will furnish under Service Bulletin 91.3.. AVAILABILITY WEEKS AFTER APPROVAL - DISPOSITION OF SPARES AFFECTED DISPOSITION N/A 01 N INITIATED BY : PRQJECT HEADQUARTERS ? APPROVED : C 1337 Approved For Release 2002/08/16 : CIA-RDP69B00279R000100090001e6GE 1 OF 2. 25X1 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 Approved Rh-ka Release 2002/08/16 : CIA-RDP691300279R000100090001-5 'le SECRET MEMORANDUM TOR THE RECORD SUBJECT; Routine Meeting with the[7:4NR0 N RO 1. At 1600 hours on the 4th of February, 1, as Director of 25X1 Program B, FRO, met with Dr. McMillan, as the DetNRO, on a routine review of current status of NRO programs. Z. The primary purpose from my viewpoint of the meeting was to explain the status of the ECP'. of the OXCART vehicle; to report on the progress of a two-year program plan for the OXCART; and to advise him of the forthcoming request for authority to transfer funds from * surplus in the OXCART airframe account to ? shortage in the J-58 engine account during the current fiscal year. 3. After a review of the current pending ECPts, the D/NRO indicated complete satisfaction with my explanation of our proposed ECP's and that routine approval would be forthcoming shortly. In addition, he felt that bad sufficient control over the ECP program NRO and that he would raise the requirement for D/NRO approval on ECP'. 25X1 fron Ilie also indicated that would receive authority to transier surpluses from the aldrame account to the engine account as required. 25X1 1,.... , litio1 1 lExtli-,,:?.1 ';',":7,1 aatomatIc . .7:-.._n,3 and trInzsM?adan Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 Approved Fo Release 2002/08/16 : CIA-RDP691300279R000100090001-5 Noe' SECRET 25X AD/OSA/JCLedforell Distribution: AD/OSA .2 DD/Sta .3 D.AD/OSA 14 C/PS/OSA #5 Di TECH/OSA .6 - DiTAJOSA #7 Chrono le ? RB/OSA L Signed1 'Jack C. )iford JACK C. 1DYOR.D , Colonel usAr Assistant Director (Special Activities) 25X1 25X1 25X1 25X1 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved F.4ifiZelease 2002/08/16 : CIA-RDP69B001W000100090001-5 dynes OF THE UNDER SECRETARY 25X1NRO 25X1 NRO DEPARTMENT OF THE AIR FORCE WASHINGTON MEMORANDUM FOR Director, NRO Program B t FEB 17-!,-. SUBJECT: Approval of Engineering Changes to OXCART Reference is made to your memorandum of 3 February, subject as above. ECP's 22-30, 22-35, 22-36, 22-43, 22-49, and 22-58 are approved as submitted. My 24 November letter which delegated you authority to approve ECP's und reflect ECP's unde is hereby revised to Please keep me apprised, on a monthly basis, on new ECP's approved by you and also progress on major ECP's 'previously approved and in work. Copy 2-DDCI 25X1: Brockway M illan iplificector National Reconnaissance Series B: 1-DD/S&T 2-D/TECH/OSA 3-PS/OSA OXCART 4-CD/OSA iL FROM AUTOMATIC 1171OR1,j:; DOD Did. 5200.10 DOES NOT ARM .7 i NRO 25)(1 25X1 Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 25X1 25X1. 25X1 25X1NRO Approved Fgr,?Release 2002iI6iCIARDP69BOO2R000100090001-5 CENTRAL INTELLIGENCE AGENCY WASHINGTON 25, D.C. MEMORANDUM FOR: Director, 3 February 1965 gational Reconnaissance Office SUBJECT: Approval of Engineering Changes to OXCART 25X1 NRO 25X1 1. Forwarded herewith are copies of six ECP's, each of which is over land therefore requires your approval in accordance with your letter of 24 November 1964. In addition I NRO have attached a list of ECP's under ;hat I have approved 25X1 since receipt of your letter. In both cases, a short justification explaining the reason for the ECP is included. More detailed explanation may be found on the attached ECP's. 2. It is recommended that you approve the six above I-land notify me so that the contractor may be advised. 3. The ECP's included in this document, plus those which have been approved prior to your memorandum of 24 November 1964, will provide for the so-called major modification program which we have been studying recently, with the exception of the following: a. The addition of extra fuel tanks which we are recommending against. b. The stiffening of the rudder post arms and the modification of the air data computer to obtain climb capability, and, ' r-.....?,....,7,,,,--,-............... Ei?.'..T..i1;.', eld SECRET Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 25X1. 25X1 NRO 25X1 Approved FgRelease 2002/08/16 : CIA-RDP6913001.111R000100090001-5 SECRET 4. At this time it appears that the modifications enumerated in,paragraph 3 above can be accomplished as service bulletins. 5. Although it appears that some savings could be obtained by accomplishing some of these ECP's and service bulletins in one modification program at Palmdale, I do not think the amount of savings would justify the security risk and the longer-down time of the aircraft which would result in going to Palmdale. I will have a program plan for the A-12 for the remainder of FY 65 and 66 within the next week which will demonstrate that we can accomplish our objectives with the above ECP program and still be able to re-program money from the airframe line item to the J-58 engine line item to accomplish objectives in the engine ro rain. JACK C. LE FORD Colonel Director, Program B, Attachments: I ECP's underLi (st) II ECP's over /List) III Six ECP's 2 RO Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 NRO 25X1 25X1 25X1 ? 24(1 , ? 251 25X1 25X1 Approved Fczatelease 20 -RDP6913002.74R000100090001-5 AD/OSA/JCLedfordn(2 Feb 65) Distribution: #1 - D/NRO w/atts #2 - NRO Comptroller, w/atts I & II #3 - DD/S&T, w/atts I & II #4 - AD/OSA, W/atts I & II #5 - D/TECH/OSA, w/ atts I & II #6 - D/FA/OSA, w/atts I & II #7 - CD/OSA, w/atts I & II #8 - PS/OSA, w/atts I & II #9 - D/ TECH/OSA (Chrono) w/atts I & II #10 - RB/OSA, w/ atts I 8z II 3 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 ENGINEERING STUDIES ES No. .7 21-2 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 ENGINEERING STUDIES AND CHANGE PROPOSALS 25X1 Title Budgetary Estimate New Antenna for ARC-50 DF Capability ENGINEERING CHANGE PROPOSALS - BUDGETARY ITEMS ECP No. Title 22-29 Pilot Voice Recorder 1- 22-56 Measurement of Roll, Pitch and Yaw ENGINEERING CHANGE PROPOSALS - TARGET/CEILING ITEMS ECP No. 25X1 Estimated Related Contract CT-22 Program Costs Estimated Total Budgetary Estimate (Other Contracts) Program Costs Contract CT-22 Title Ceiling Price Estimated Related Program Costs Estimated Total (Other Contracts) Program Costs 25X1 1,22-41 Stall Warning System ?22-5l Modifications to ADP Prototype Inlet Control System ,-22-54 Modifications to 121: 122, 131 for Type I 2-2-65 Camera Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25X1 Approved For4elease 2002/08/16 : CIA-RDP69600274a000100090001-5 OSA - cPo'/S9- 2 February 1965 To: Contracting Officer, Contracts CT-22 and FT-21 Subject: TRANSMITTAL OF ENGINEERING STUDIES AND MANGE PROPOSALS Transmitted herewith for your consideration and approval are the attached Engineering Studies and Change Proposals. CC: Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 NRO 25X1 25X1 Approved.Fupr Release 2002/08/16 : CIA-RDP69130172t79R000100090001-5 Attachment 'I to: 25X1 rIAILL1 25X1 NRO LIST OF ECP'S UNDFA 25X1 22-7-2 Deletes replacement of two ARC-50 ground stations. Thi5 WP was previously approved for a total of I in March 1964 and amendment No. 1 is merely to gain formal approval of the deletion. 22-9-2 25X1 22-11-1 25X1 22-12-1 25X1 22-13-1 This amendment tc a previously approved ECP is to increase the scope of lightning tests by conducting some on the nose of the aircraft in addition to the rudder. Ceiling price - Oxygen system balance valve. This amendment is to revise the system so as not to lose oxygen from a system that has failed by re- moving the failed system from usage. ECP 22-11 Ihad been reviously approved. Ceiling price - A-12 parachute improvement program. ECP 22-12 had been previously approved. This amendment Is concerned with developing a method to provide additional altitude for better seat/ lane separation. The new ceiling price is nd the work is completed. Periscope improvement. This was previously approved and the amendment adds the installation of a new reticle to provide the pilot with the ability to set his course by using the sun compass. Total cost - 22-24 Drag chute deploy handle to replace 3-way toggle switch. This was requested by the pilots for more efficiency. Total cost - 22-27-1 25X1 rfr, 25X1 Map case destruct system. Previously approved t and this nmAndment s to establish firm ceiling price Of Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 7:::nrtiq ,..11 25X1 25)(1 25X1 Approved kap Release 2002/08/16 : CIA-RDP69B0W9R000100090001-5 SECRET Attachment I to: 22-62 Seat and parachute rework to accept more powerful catapult developed under ECP 22-12-1. Th* for Kedlock vehicles and was approved by da1teiI 28 December 1964. Estimate of re a e 22-66 Alternate steering left hand, engine Kedlock vehicles. December 1964 approved t system in case of loss of ulic pumps for date?28 for 2 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 25X1 25X1 25X1 25X1 25X1 25X1 "A? i 1 a ro;latic 25X1 25X1 25X1 25X1 25X1 Approved For Release 2002/08/16 : CIA-RDP691300279R000100090001-5 SECRET LIST OF ECP'S OVER Attachment II to: 22-30 Compressor inlet pressure indicator to enable the pilot to see the compressor inlet pressure in each engine to determine if controls are functioning in a manner that will allow com- pletion of mission range. This is a necessary change and had been approved for all Kcdl? vehicles. Total program cost - 22-35 All Attitude Fuel Readout System. At the present time the fuel guage reads accurately only at an aircraft angle of attack of 7 1/2 decrees. Estimated total program costs -I 22-36 Design and develop four carts to aid in com- plete checkout of control system. This has been done previously by using whatever con- tractor equipment available but is needed to expedite operational checkouts on pre- and post-flights. The ECP also includes equipment for the Kedlock program. This ECP had been previously approved and this is the formal request. Total estimated cost - 22-43 Replace un all OXCART venicies being retrotittea with Lockheed electronic inlet control under ECP-48, previously approved. Actual go-ahead will be withheld until a final decision on inlet control. Total program costs - - 22-49 Design and engineer kits required to change the fuel tank sequencing on all aircraft except #121. This is to reduce trim drag and results in greater range. Total cost - 22-58 Replace il pressure transmitter with to correct flight aborts. The present transmitter has been causing too rrenuent borts for reliability. Total cost - Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25)6 25X1 25X1 2-5x1 25X1 25X1 25X1 25X1 25X1 25X1 A att!aagic and de;ImLicatIon Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 L0C1HE2M-CialaT01UiIA COMMITY ENGINEERING STUDY 0 CHANGE PROPOSAL 0 IL A C 22-22-1 DATE 14 JANUARY 1966 AFFECTS: 0 PROJECT Fi NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL : TACAN NATURE OF PROPOSAL :This EC? covers the development and manufacture of kits required to incorporate TACAN in A-12 Articles 122,125-132 134 and 135. TACAN will replace the ARC-15F Receiver and R18A Converter. In addition the Glide Slope Marker Receiver in- stallation will be removed from the nose per Installation is a difficult tank requiring engineering for two (2) sets of Articles (1) 122,125-1aS and (2) 129-131. Extensive modification is required in the "E-bar, cockpit and chine areas. , EC? 22-75 will incorporate TACAN in Article 124. STA REASON FOR PROPOSAL : Reason for Revision: To submit Proposed Target Price. This price reflects the trans- fer of ship 124 to ECP 22 -75 for later installation, a reduction in the scope of engineering and the deletion of installation costs. This ECP was approved by Headquarters Message 798, dated 20 July 1964. a.- ? e. r ,ES ESTIMATED COST AND TIME INVOLVED : N/A ADDITIONAL FUNDING REQUIRED: .. CP ESTIMATED COST FOR KITS OR PARTS: . (See Page 2.) ADDITIONAL FUNDING REQUIRED: ITEMS AFFECTED BY PROPOSAL SAFETY 111 MISS/ON EIFEC. liVENESS III PERFORM- ANCE OPERATING PROCEDURE 0 INTER- CHANGE- ABILITY DID WEIGHT WEIGHT BALANCE OR I TOOLS 6 54.1PP0111 EQUIPMENT MAINTE- NANCE PROCEDURE 0 SERVICE LIFE 0 FLIGHT MANUAL 0 NAINTE- NANCE MANUAL 0 EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FiELD SOURCE OF PARTS FOR KIT ADP will furnish under Service Bulletins: 605,733,783,882, 950 and 956. AVAILABILITY WEEKS AFTER APPROVAL DISPOSITION OF SPARES AFFECTED Equipment removed from aircraft- wi.U. be returned to the Depot. INITIATED BY : PROJECT HEADQUARTERS APPROVED : PAGE 1OF 2. Approved For Release 2002/08/16 :'CIA-RDP691300279R000100090001-5 NRO 25X1 NRO 25X1 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 I, riocnize-m-CALIFORITIA COMMNY ENGINEERING STUDY 0 CHANGE PROPOSAL [a R. A C 22-22-1 DATE 14 JANUARY 1966 AFFECTS: III PROJECT NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL : TACAN NATURE OF PROPOSAL :This EC? covers the development and manufacture of kits required to incorporate TACAN in A-12 Articles 122,125-132 1314. and 135. TACAN will replace the ARC-15F Receiver and D18A Converter. In addition the Glide Slope Marker Receiver in- stallation will be removed from the nose per Installation is a difficult task requiring engineering for twp U) sets of Articles (1) 122,125-139 and (2) 129-131. Extensive modification is required in the "E -bay, cockpit and chine areas. ? ECP 22-75 will incorporate TACAN in Article 124. STAT REASON FOR PROPOSAL : Reason for Revision: To submit Proposed Target Price. This price reflects the trans- fer of ship 124 to ECP 22 -75 for later installation, a reduction in the scope of engineering and the deletion of installation costs. This ECP was approved by Headquarters Message 798, dated 20 July 1964. ,.- vv? c- r S ESTIMATED COST AND TIME INVOLVED : N/A ADDITIONAL FUNDING REQUIRED: C P ESTIMATED COST FOR KITS OR PARTS : ( See Page 2.) ADDITIONAL FUNDING REQUIRED : ITEMS AFFECTED BY PROPOSAL : SAFETY IIII MISSION EFFEC. 1 IV ENE SS LI PERFORM- ANCE LI ?MAW,* PROCEDURE 0 INTER. CHANGE. ABILITY 0 WEIGHT 01 WEIGHT IL BALANCE TOOLS 4 SUPPORT EQUIPMENT !MINT& PROCEDURE MANCE 1111 SERVICE LIFE III MANUAL. i NIGHT is MAINTE- NANCE MANUAL D EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT ADP will furnish under Service Bu.Uetins: 605,733,783,882, 950 and 956. AVAILABILITY WEEKS AFTER APPROVAL DISPOSITION OF SPARES AFFECTED Equipment removed fron aircraft will be returned to the Depot. INITIATED BY : PROJECT HEADQ,UARTERS APPROVED : ? -11,7" Approved For Release 2002/08/16 :,CIA-RDP691300279R000100090001PAGE 10F 25X1 NRO 25X1 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Z 2 ,49 Approvec-t or hm edbe LOCICHEED-tALIAMIA COMPANY 2Ouru8I1b. AluP ubm127bmmuulumum01-15 ENGINEERING STUDY CHANGE PROPOSAL i [T] 22?.22 li DATE 26 May 1964 AFFECTS: 0 PROJECT lg.] f NAME OF MAJOR COMPONENT? ? AIRCRAFT PART OR LOWEST SUBASSEMBLY r PART NO. & MODEL OR TYPE ' r TITLE OF PROPOSAL : TACAN ni JILL Ar.12' s STAT NATURE OF PROPOSAL: InErtaLl TAN in all A-12 Articles. TAN ARIET replaces YOB (ARC...15F receiver and. PaA converter). /n addition,e :._ e , ti .i.,. Marker Receiver installation will be removed. from the nose per request Installation is difficult job requiring different engineering for four s s o ,. cies (a) 121, 322, 125-128, 132,133 (b) 129-131 (a) 1211 (d) 134,135. Preliminary evaluation indicates job can be accomplished. Major modification required in "E" - bay and cockpit as well as changes in other areas including chines. Assumes TACAN and. Indicator is GFAE to I. STAT # / get 7' i ?,, d t 0 REASON FOR PROPOSAL: t 1. Requests RCP. i 2. To identify job and provide budgetary estimate. 3. We are proceeding with this job based upon authorization provided by This is item 1 on "Anticipated FCP" list !submitted 30 April 1964. ?. STAT IP --- ES ESTIMATED COST AND TIME INVOLVED : c/ STAT ADDITIONAL FUNDING REQUIRED: CESTIMATED P COST FOR KITS OR PARTS: Budgetary Estimate Target ADDITIONAL FUNDING REQUIRED: See Page 2 Ceiling ITEMS AFFECTED BY PROPOSAL : SAFETY MISSION EFFEC. I I VENESS 0 -T PERFORM- ANC E 0 , OPERATING PROCEDURE DO INTER. CHANGE- ABILITY , WEIGHT OR WEIGHT & BALANCE 0 TOOLS SUPPORT EQUIPMENT III & MAINTE- PROCEDURE NANCE III :ammo SIMI 0 If FL MANUAL IGHT 111 /MINH- NANCE MANUAL MI EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE INFIELD . SOURCE OF PARTS FOR KIT Service Bulletin to be Written AVAILABILITY WEEKS AFTER APPROVAL ? . DISPOSITION OF SPARES AFFECTED Equipment removed from Aircraft and Spares will be sent to Depot NF , INITIATED BY : ? ? 4 L. If ? 14Ni ? :41.1 4`#:. : . .. . APPROVED : - . . . i . ... 11-1,1 1337 25X1 TAT 0 5X1 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Next 6 Page(s) In Document Exempt Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Aooroved For Release 2002/08/16 : CIA-RDP69600279R000100090 01- LOCKHEED - CALIFORNIA COMPANY ENGINEERING STUDY CHANGE PROPOSAL , LAC 22-18-1 DATE 29 NOVIMER 1965 AFFECTS: 0 PROJECT t NAME OF MAJOR COMPONENT OXYGEN SYSTEM PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL: RETROFIT OF LOX SYSTM - A-12 ARTICLES ST/ NATURE OF PROPOSAL: Provide kits to retrofit SiN 121, 122, 124-131 and 134, 135 to Liquid Oxygen Two-place articles (8/N 124; 134 and 135) viii have the &lie '6zrgezi ia..ei liters) as si lace articles; this is sufficient' capacity for System. ., ? .. mission an an siions with failure of One system occurring "iir.-... , i . , 'See BCP 22-8 for development cost end' iiieorporittion of LOX system in N .13? ana'133. . . . ? .... . .. . . - ... r 6.,.. ^ .. , REASON FOR PROPOSAL : . Headquarters message requests ECP. Reason for Revision: To submit, Target/Ceiling Price. , - 'ES ESTIMATED COST AND TIME INVOLVED : ADDITIONAL FUNDING REQUIRED : CP ESTIMATED COST FOR KITS OR PARTS: ? See Page 2. ADDITIONAL FUNDING REQUIRED: 4 ITEMS AFFECTED BY PROPOSAL : SAFETY II MISSION EFFEC- lIVENESS PERFORM,. ANC! 111 OPERATING PROCEDURE INTER- CHANGE. ABILITY 11 WEIGHT OR WEIGHT & BALANCE TOOLS & SUPPORT EQUIPMENT 0 lAAINTE. NANCE PROCEDURE SERVICE SIN 0 RIGHT MANUAL 0 ALAINTE- NANCE MANUAL 0 EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT Service Bulletin: 5744 592, 598, 709 AVAILABILITY WEEKS AFTER AF#PROVAL . DISPOSITION OF SPARES AFFECTED' -,...7 INITIATED BY: _ PROJECT HEOQUARTEEp APPROVED : 44/ (0 ?1',/"1, ' Approved For Release 202i NRO 25X1 725X1 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 ---,t1jr:roved-For ReteasT-40172701871-6=TA7R1376"9130.027914C00100090001-5 LOCIOIRED CALIFORTTIA COMPANY ENGINEERING STUDY 0 IL A. C CHANGE PROPOSAL 11 22-18 DATE April 30, 1964 AFFECTS: PROJECT IA NRO 25X1 NAME OF MAJOR COMPONENT OXYGEN SYSTEM PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL : RETROFIT OF LOA SYSTEM - A.12 ARTICLES STAT NATURE OF PROPOSAL: Provide kits to retrofit B/N 121, 122, 124 - 131 and 134 135 to Liquid Oxygen System. . . Two place articles (B/N 124 134 end 135) vial have the same - oxygen Capacity (20 liters) as single p1ace.artic1es .this iS suffieient capacitY for nortal mieSion_and missions vi.th failure o em-occuring at -mid See ECP 22-8 for development '.cost- and incorporation ofL0)(Byitera on B/N 132 andY 133. REASON FOR PROPOSAL : Headquarters Message ES ESTIMATED COST AND TIME INVOLVED : ADDITIONAL FUNDING REQUIRED: ST AT CP ESTIMATED COST FOR KITS OR PARTS: Budgetary estiraate: Retrofit Kits Installation Total ADDITIONAL FUNDING REQUIRED : ITEMS AFFECTED BY PROPOSAL : SAFETY MISSION PERFORM OPERATING INTER- EFFEC- ANCE PROCEDURE CHANGE- TIVENESS ABILITY WEIGHT OR TOOLS I MAINTE- SERVICE FLIGHT MAINTE. WEIGHT & SUPPORT NANCE LIFE MANUAL NANCE BALANCE EQUIPMENT PROCEDURE MANUAL EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT Service Bulletin to be written DISPOSITION OF SPARES AFFECTED I AVAILABILITY WEEKS AFTER APPROVAL STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 C' Approved For Release LOCKHEED-CALIFORNIA COMPANY 20132/08/16 : GIA-RDP69B002(9 ENGINEERING STUDY ? CHANGE PROPOSAL Utriummuutri-o LAC 22-17 DATE . June 3, 1961, AFFECTS: ED PROJECT 3 NAME OF MAJOR COMPONENT CONTROL STICK PART OR LOWEST SUBASSEMBLY PART No. & MODEL OR TYPE i . TITLE OF PROPOSAL : REPLACE CONTROL STICK GRIPS ON A-I2 AND AP-12 ARTICLES .NATURE OF PROPOSAL: Replace presently used B-9' control stick grip assembly with newly developed units ? made out of Magnesium. B-9 was fully qualified unit with no failures expel:Winced, b' other Users. L.A.C. has had 3o% of units fail. We have developed a new source for the isainesiuzi stick grip.' New unite will also be used on the R-,22., program. . . .; q c...; . ' , - , . . . .. h. .e ' L4 ,.,,., ... .. .. AA , r ' - . ? ,.... ? 4 -REASON FOR PROPOSAL : , '''' -A. .; 1. Replace 'defective' contra stick asseibiles. .. . _ , . , We are proceeding with this job- on the basis of .. . STAT --L. ? ES ESTIMATED COST AND TIME INVOLVED : ADDITIONAL FUNDING REQUIRED: CP ESTIMATED COST FOR KITS OR PARTS: SEE PAINS 2 ' Target Price Ceiling Price ADDITIONAL FUNDING REQUIRED: ITEMS AFFECTED BY PROPOSAL : SAFETY 0 MISSION EFFEC? TIVENESS PERFORM, ' ANCE El OPERATING PROCEDURE DO INTER. CHANGE. ABILITY WEIGHT 00 WEIGHT & BALANCE D TOOLS SUPPORT EQUIPMENT I IL /MINT'. NANCE PROCEDURE SERVICE LIFE FLIGHT MANUAL I MAINTt. NANCE MANUAL EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT S=CE BULLET= 562 AVAILABILITY WEEKS AFTER APPROVAL DISPOSITION OF SPARES AFFECTED ..... - 5XIIIRO 1, SCRAPPED INITIATED BY : - , . 4" 44.,, APPROVED : , 1 --- - 7 0 25X1 TAT STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 -Ap pr-ov ed For Release 2002/08/16 i -6--GIA-RBP691E100279KteeeteeeNeei-5------1 ? LOCKED - CALIFORNIA COMPANY ENGINEERING STUDY CHANGE PROPOSAL DATE 2y October 1964 AFFECTS: RA c 22-24 NO PROJECT rIc 25X1 NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL : DRAG CKUTE DEPLOY HANDLE NATURE OF PROPOSAL: Design effort, fabrication and assembly of kits to modify 13 A-12 articles to accept a drag chute deploy handle. Installation of handle is not a part of this ECP. REASON FOR PROPOSAL: The deploy handle replaces a three-way toggle switch. Pilots requested LAC t provide a push-pull device in lieu of the toggle switch. StAT CP ESTIMATED COST AND TIME INVOLVED : ADDITIONAL FUNDING REQUIRED: ESTIMATED COST FOR KITS OR PARTS : ADDITIONAL FUNDING REQUIRED : (See Page 2). Target Price Ceiling Price ITEMS AFFECTED BY PROPOSAL : STAT SAFETY MISSION PERFORM. OPERATING INTER. WEIGHT 01 TOM 11 MAINTE. SERVICE RIGHT ALAINIf ? RUC- MICE PROCEDURE CHANGE WEIGHT 1 SUPPORT NANCE LIFE AtANUAL NANCE I IVENESS ABILITY BALANCE EQUIPMENT PROCEDURE MANUAL 0 El III El I II EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT AVAILABILITY WEEKS AFTER APPROVAL SERVICE BULLETIN 5 90 DISPOSITION OF SPARES AFFECTED NOT APPLICABLE RO INITIATED BY : APPROVED: 25X1 HEADQUARTERS' PILOTS Approved For Rolc\3so 200208/1-6-: Q4A RDPG01300273R00010 030001-5 11.47 PAGE 10F 2. STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Next 4 Page(s) In Document Exempt Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For ReImtel2?:p3//M6A?Gq1A-R13P69-B00279RGOV0RW001-5 CRET DERIIIRRED ROUTINE 1,4URVIV AVAILABLE 20 FEB' ON BASIS OF INDIVIDUAI:PILOTS; CUSHIONS FOR THE SURVIVAL KIT. REPORT ON PROGRESS ONU NT LEAST ONE PLLOT BY 1 MARCH 64. C. DESIGN PAN TO INCORPORATE NEW PARACHUTE RELEAES AND EMERGENCY OXYGEN SUPPLY IN PRESENT PARACHUTE CONFIG, EIGHTY CU. IN. OF OXYGEN TO BE SUPPLIED IN DUAL SYSTEM DESIGN: D. CONTINUE EFFORTS TO REDUCE SUIT CONTROLLER BACK PRESSURE. REQUEST REPORT ON PROGRESS BY 1 MARCH 64. DAVID. CLARK CO. A. PROCEEDWANARIIWITYKAASIS,ON A DESIGN TO Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For, IRMejaFsfL2902tETOtt:ECIA-RIBP69B00279ROM0R90001-5 RET HELM WILL ALIA TIlE PrIOT TO: FLY WITH FAC COCKPIT PRESSURE . , VISOR; S AIJTOMWUC LY COCKPIT ESSURE REDUCEDREPOR PROGRESS MARCH 64. ,, , * 4 REPORT' MiKCH ON PROGRESS OF. NEW DESIGN PRESSURE SUIT GLQ C. INVESTIGATE NEW APPROACHES TO INSURE LIGHTER WEIGHT HELMET AS DISCUSSED IN SUPPLIERS MEETING ON 29 ,AN 64. REPORT ON PROGRESS 15 MARCH 64. D. HAVE PROTOTYPE OF WEDGE SOLE SHOES AND NEW ,ESIGN SPUR BY 15 MARCH 64. INCORPORATE IN FLIGHT FEEDING PORT IN FPS IELMET BY 1 APRIL 64. F. IMPROVE FPS WATCH POCKET DESIGN BY 1 APRIL b4. 25X1 G. REQUEST STATUS ON FACE BARRIER ATION BY MARtH 64. COORDINATING OFFICERS 25X1 ELEASING aFFI REP1ODUCT1ON BY OTHER THAN THE ISSUING OFFICE IS FRO1:116 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 1::o5or Release 2002/08/16 LOCKHEED-CALIFORNIA COMPANY : CIA-RDP69B00270R000100090001-5 ENGINEERING STUDY CHANGE PROPOSAL ? gl R., liek C 22-10 NP1 DATE January 201 1964 AFFECTS: n PROJECT I 2 NAME OF MAJOR COMPONENT PRESSURIZATION SYSTEM PART OR LOWEST SUBASSEMBLY SUIT VENT LINE PART NO. & MODEL OR TYPE AA-13-32 TITLE OF PROPOSAL : SUIT VENT A/R SYSTEM REGULATOR NATURE OF PROPOSAL: Install preasure regulator in airplane pressurisation system. Part No. 392 - - e installed in A-I2 serials 121,122,44 thru 135 and Part , No. 392518-2-1 to be installed in AP-12 serials 1001 thru;1003.-. Dash numbers . indicate pressure settings required: for differences in systems. _ ,- - , REASON FOR PROPOSAL: . ..... Present aireraft system meets all requireraents for szpplyi of air to pilotft e _ pressure suit, however improper regulation- of gait piessure can result in increased oxygen usage due to additional physical exertion imposed. by "stiffness" of suit. Installation of pressure regulator will more precisely Monitor supply of pressure irrespective of manual suit valve setting. , STAT id I S ESTIMATED COST AND TIME INVOLVED : STAT ...- I i ADDITIONAL FUNDING REQUIRED: CP ESTIMATED COST FOR KITS OR PARTS : Target Price ADDITIONAL FUNDING REQUIRED; SEE PAGE 2 Ceiling Price ITEMS AFFECTED BY PROPOSAL : SAFETY MISSION EFFEC. 1IVENESS X0 PERFORM. ANCE OPERATING PROCEDURE ODD INTER. CHANGE. ABILITY WEIGHT OR WEIGHT I BALANCE TOOLS SUPPORT EQUIPMENT Il L MAINTE. NANCE PROCEDURE SERVICE LIFE FLIGHT MANUAL 1111 MAINTE. NANCE MANUAL EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT AVAILABILITY WEEKS AFTER APPROVAL SB No. 505 & 506 83 138 DISPOSITION OF SPARES AFFECTED ? NR INITIATED BY : LAC ? -- -- APPROVED : - -----_____ w 2 S RE-1 A ease : GIA-FDP69BOO279ROOO1 00090001-5 PAGE 1 OF 2 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release LOCKHPYD - CALIFORNIA COMPANY 2002/08/16 : CIA-RDP69119279R000100090001-5 ENGINEERING STUDY CHANGE PROPOSAL rukc22-9 -2 N.F DATE 29 October 1964 AFFECTS: II PROJECT NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY PART NO. & MODEL OR TYPE TITLE OF PROPOSAL ? . LIGHTNING IIESTS NATURE OF PROPOSAL: 1. Prepare for and conduct lightning tests on a plastic rudder using the metal stub fin from the static test article as supporting structure. 2. Prepare for and conduct lightning tests on a section of the nose. 3. Tests were condueted at 4. Prepare and submit reports on the results of the above tests. REASON FOR PROPOSAL:. These tests are required to increase the safety of the operation. furnish information relating to the strike probability patterns, extent of resultant damage, and indicate problem areas requiring Fixes resulting from these tests are not a part of this ECP. This revised ECP is submitted to add Item 2,above, to the scope /- The tests will the nature and fixes. of the job. ? ESTIMATED COST AND TIME INVOLVED : ADDITIONAL FUNDING REQUIRED: C P ESTIMATED COST FOR KITS OR PARTS : Target Price Ceiling Price ADDITIONAL FUNDING REQUIRED : (See Page 2 - ITEMS AFFECTED BY PROPOSAL : SAFETY MISSION EFFEC? i iv LNESS PERFORM- ANC! III OPERATING PROCEDURE III INTER. CHANGE. ABILITY 0 WEIGHT OR WEIGHT & BALANCE TOOLS SUPPORT EQUIPMENT III & MAINTE- PROCEDURE NANCE SUN SERVICE LIFE v FLIGHT MANUAL MAINTR- NANCE MANUAL 0 EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT NOT APPLICABLE AVAILABILITY WEEKS AFTER APPROVAL DISPOSITION OF SPARES AFFECTED NOT APPLICABLE LU INITIATED BY : MI APPROVED : 25X1 1337 Approved For Release 2002/08/16 : CIA-RDP69B00279R000100090001ISGE 1 OF 2. 0 25X1 TAT TAT TAT 0 STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 25X1 )RIG JNIT 25X1 EXT )ATE: 25X1 CO A ? ? roved For Release 2tI3E/42gitts5li tArMalp02791RGOOI00090CU11-5. ASD/OSA ROUTING SECRET 4Rm4DIRECTOR i?L'NF ? 0 5 fris N70 ILLEGIB ILLEGIB OXCART CS.110 1. AS A RESULT OF THE SUPPLIERS CONFERENCEsOF 29 JAN AT LAC DEALING WITH AEROMEDICAL AND LIFE SUPPORT SYSTEMS3 THE FOLLOWING PRIORITY LISTING OF PROBLEM AREAS ARE DEFINED: LAC A. ASSUME RESPONSIBILITY OF DESIGNING A BALANCING VALVE WHICH WILL INSURE EQUAL FLOW OF OXYGEN FROM BOTH SYSTEMS. ACCEPTABLE TOLERANCE TO BE 200 PSI DIFFERENTIAL. REQUEST BI?MONTHLY REPORTS ON THIS PRIORITY ITEM BE SUBMITTED TO THIS HQS STARTING 1 MARCH 64. B. INSTALL 1100 CU. IN. OXYGEN BOTTLES IN AT LEAST ONE A/C BY 29 FEB 64. ILLEGIB ILLEGIB C. CONTINUE PRESENT EFFORT TO INSTALL NEW REGULATOR FOR SUIT VENT PRESSURE AT 10" ? 40" OF H20 AND APPROX. 12 CFM. IT IS UNDERSTOOD ONE WILL BE INSTALLED BY 1 MARCH 64, TWO BY 15 MARCH 64. COORDINIATINL; OFFICERS PELaASING OFFICER SECRET ..trApp L 4fttaxikaVen NLITHENTICATING OFFICER I) RFPRODUCTION 9', 07-1,FP, THAN T'.H.7 ISSUING OFFICE iS PROFUNTER CO2.! le, Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5 RIG: NOT