APPENDIX I REVISION NO. II
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP69B00279R000100090001-5
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
115
Document Creation Date:
December 12, 2016
Document Release Date:
June 20, 2002
Sequence Number:
1
Case Number:
Content Type:
STATEMENT
File:
Attachment | Size |
---|---|
![]() | 5.55 MB |
Body:
ECP NO.
STAT
22-1-1
STAT
22-2-1
22-3-1
22-5-1
,
- 0001300 79RGOO1C0090001-5
APPENDIX I
REVISION NO. II'
DESCRIPTION
22-6-1 Improved Distance Measuring for ARC-50
22-7-2 ARC-50 Ground Stations
22-8-1 Liquid Oxygen System Installation in
Vehicles 4132 and #133
22-9-2
22-10
22-11-1,
22-12-1
22-13-1
22-14
22-715
22-16
Lightning Tests
Suit Vent Air System Regulator
Oxygen System Balance Valve
A-12 Parachute Improvement Program..
Periscope Improvement Program
Revised INS Rack Installation
Oxygen System Low Pressure Warning Light
22-17 Replace Control Stick Grips on A-12
and AF-12
22-18-1 Retrofit LOX System - A-12's (Already
accomplished on #132 and #133)
STAT
. 22-19
* Redetermined Item.
STAT
TARGET PRICE CEILING PRICE
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
(?ECP NO. .
STAT'
22-20
22-23.
06110411,64. AjR p.0002711,900100090 01-5-
DESCRIPTION
22-22-1 Tacan in all A-12's except #121 and
124. See ECP 22-75 for #124
STAT
22-23
22-24
22-25
22-26
22-27-1
STAT 22-28_1
STAT
TARGET PRICE CEILING PRICE
Drag Chute Deploy Handle
Aero-Med Instrument
Periscope Projector Film Destruct System
Map Case Destruct System
22-29-1 Pilot Voice Recorder
22-30-1 Compressor Inlet Pressure Indicating
System
( 22-31-1 SR-3 Improved Gyro Reference Heading System
#I24. See ECP 22-74.
22-32-1 Improved Fire Wirning System
22-33 Structural Strength
?
? 22.,34 Chine Mod and Refrig.,.
- 22-35..1 All :Altitude Fuel Quantity System
2236-1 :Airplane Control System Checkout Cart (4)
22-37-1 , World Wide Capability plight Tests
22-38 Increased Fuel Quantity Study
22-39 New Servos-Inter-System Leakage
22-40 Dual Initiator Qual.
22-41 Stall Warning System
22-42 Six Addi-(ional Cap Nap (LeCroix)
* Redetermined Item.
Approved For Release 2002/08/16 : CIA-RDP69B00279R000100090001-5
(7; ECP NO. -DESCRIPTION _TARGET PRICE
STAT
STAT
22-43-1 Replace
install new Contro1 Unit
Improve Pilot Fuel Control Capability
Enlarged LN2
Fuel Remaining Instrumentation
ARC-50 ADF Antenna Study Only
ADP Air Inlet Control
Fuel Management Revision
JC-130 Command XMTR and Recovery Chute
Systems
AIC Prototype Changes
22-44
22-45
22-46
22-47
22-48-1
22-49-1
22-50-1
22-51
22-52
22-53
22-54
22-55
22-56-1 ?
22.-57-1
22-58-1
Type I Camera Provisions
A-12 Mod, Studyjp2 Incr. & Stl. Gudgeon
Roll, Pitch and Yaw Study
Hydraulic Rework - ZEE Can
Engine Oil Pressure Transmitter Etsign'
Improvement Testing.
II Hatch
22-60 Inlet Control InstruientatiOn .
22-61 Not Used
22-62 . AF-12 Seat and Parachute Rework Program
22-63-1 Fuel Cooling System
22-64-1 Fuel Qxantity Modification to Five
KC-135's
* Redetermined Item.
Approved For Release 2002/08/16 : CIA-RDP69
STAT
CEILING PRICE
pooloo090061-5
STAT
TARGET PRICE CEILING PRICE
-ECP NO.
22-65-1
22-66-1
STAT 22-67
DESCRIPTION
ARC-52 AY Installation Kits for Five
KC-135's
Alternate Steering System for A7-12's
22-68-1 Retrofit of Production ADP Inlet Control
into S/N's 134 and 135
22-69 Drag Chute Improvements
22-70 Improved Wheels and Brakes for A-12
22-71-1 Forward Look Periscope
22-72-1 Retrofit of Production ADP Inlet Control
into all YF-12A's
22-73-1 Hydrogen Ignition System for YF-12A's
22-74 SR-3, 4124, Breakout of 1 ship from 22-31
for laterinktallation
TAW #124''
err,
22-75
from EC!, 22-22or later of
aaltla
. t, Breakout t
STAT 22-76
V.129, 131. Breakout
.p pa om2-EqP 22-43-1 for later
'Anstallation.
TOTAL
* Redetermined Item.
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
I. REDETERMIRED ITEMS
ECP NO.
2g-i-i
22-2-1.
22-3-1
22-4-1
22-5-1
22-6-1
22-7-2
22-8-1
22-9-2
22-10
22-11-1
. 22-12-1
22-13-1
22-14
22-15
22-16
22-19
22-20
22-21
22-24
22-25
22-26
22-33
22-34
22-38
22-39
22-40
22-42
22-44
22-45
22-46
22-47
22-48-1
22-52
22-53
22-55
22-59
22-60
22-61
22-62
22-63
22-67
22-69
22-70
SUB TOTAL
SUMMARY
TARGET PRICE
CEILING PRICE
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
II. ITEMS TO BE REDETERMINED
ECP NO.
22-17
22-18
22-22-1
22-23
22-27-1
22-28-1
22-29-1
22-30-1
22-31-1
22-32-1
22-35-1
22-36-1
22-37-1
22-41
22-43-1
22-49-1
22-50-1
22-51
22-54
22-56-1
? 22-57-1
? 22-58-1
22-64-1
22-65-1
22-66-1
22-68-1
22-71-1
22-72-1
22-73-1
22-74
22-75
22-76
SUBTOTAL
GPM TOTAL
TARGET PRICE
CETT.TNG PRICE
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
BACRXT
ti
s
704X4011 to year ter of 3 February 1965
monthly report ea ove OXCART
Burma spproved by Director Program B, is accordasce with
the limitation set deem and also a progress report on pre-
view:say approved chaagee. this memorandua restricts itsell
to reportimg on XCIPis approved gime, 6 February. A separate
report till be mods on theme previous coved. Zech SCP
included in this report was under
2. Director, Mamma 11, approved the *CP 's MAW be-
low en 2 larch 11413,
MCP 21-2
Mee ant
Dedgetary est
ammo 1 wale* is te
? prototnno. 11111s
range and to improve
with the tanker*.
Di capability,
This AP covers
develop amid test
reqmired to increase
reodesvous oapabilitY
25X1
25X1
NRO
? 25X1
25X1
25X1
Pilot 'Voice This is a recorder con-
bised with a datreot system for all Ar.12
siraraft, and *over* selection of the re-
corder, development of a destruct eritein, and
produetien of kits for installation. This
had been previously requested by Director,
Program 11, and the MCP represent* the formal
payees'. Xstimmted cost is This
includes installation and spares. This change
will increase recording time to an acceptable
level.
Cfithi? 1
Excluded frm automatic
down:Jading and
declassification
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25)0
251
Approved For Release 2002/08/16 : CIA-RDP69B00279U00100090001-5
MIST
P 1241 Modification* to the Lockheed islet
Us =PI ?over* dollop dowerodimmt and many-
isobar* of eempeseats required to incorporate
islet cemtrol modifications on aircraft 120,
LSO sad 121. The change will reduce call-
bratioa time coasiderably and will provide
mere secarete sad pore reirlo Mach eensora.
Metimated oast is'
MCP 14 Modificatiaa to aircraft 121, 122 and 131 fur
/rips 1 emus= installation. (Other aircraft
see already so oonfigered). This will enable
all aircraft to be capable of flying agora
tiemal missions with Type 1 camera. estimated
cost is
MCP de Measurement of roll pitch and yaw. This
cowers the desiga and mamafactare of ems
eemparater system sad dowetopmest of computer
prisms required to molars* data of Type
mod 1,1* 11 camera systems. it in intended
to improve both the p.rforaanc. an
ef the system*. tiast.d cost in
25X1
25X1
25X1
25X1
25X1
gross of tbisim Mos will be reported at a later
NRO
25X1
25X1
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
Approved For Release 2002/08/16 : CIA-RDP69B002792000100090001-5
4 - AD
6 - 11/1110/06A
6 DAPA/06A
? - 00/08A
? - MASA
O - WINC6/064 (Owosso
10 - SS/06A
ro 1 1or
(4 r.h 1066)
61101111T
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
25X1
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Next 1 Page(s) In Document Exempt
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Rvatase 2002108/16: CIA-RDP691300279ROW0100090001-5
IN ?15I -S E C Y F. T PAGE 2
ECP- 67" 13,:t NACELLE SW ING JO INT PIPING REV ISION SR- 7. S R WO ?
- VIOU 't APPROVED.
ECP-67-i12) FUEL CROSSFEED VALVE POSITION INDICATOR SR-71.
e- (A/ -----
pip ?
ECP -SR - 71-19 /3666-.1.39 CO IVA T ID IL IT Y CHANGE SE. APPROVED UNDER
SEPARATE LETTER.
7
ECP.-22--72-2 "ETROFIT 07 PRODUCTION AD INLET CONTROLS IN ALL Y -I2A'S-
.. __a_ ? -
XIS iSA PRICE REDUCTION CHANGE. DISPOSITION- INSTRUCTIONS FOR EXCESS
PART S A ND MATER IAL W ILL BE PRO V IDD BY T HE SPO AT A LATER DATE .
E . C E T TOR : ? 011959Z AUG 67
C R E
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
104
t
NO
' Approved For Rete 200210,814.6:). 9B0027913-4001. 000
r
ECRET
04-5:
"
-----------
N
Ii
ILLEGIBU
25X1
-tV!
9i5t
25X1 I
25X1
25X1
25X1
FO
SECRET t3 I 19.33Z CITE
11 'NFO
25X1
25X1
25X1
25X1
SUBJ APPROVAL OF ECP' S
AT T N
FM I
I HE FOLLOWING ECP' S ARE TECHNICALLY APPROVED
ECP-67' in EMERGENCY FACEPLATE HEAT PROVISIONS FOR ST AB IL IZED
SEAT - SB -5911 IS DISAPPROVED AS WRITTEN IN FAVOR OF COMBINING
ESE PROVISIONS WITH BATTERY INST ALLAT ION IN A SINGLE SERVICE
' BULLETIN.
ECP-67-I08, EMER
ENCY BATTERY POWER Map SR-71.
. ECP- 67-104 FILM TRANSPORTS- MOD Fpli - SR - 71 SIMULATOR COST OF
INSTALLAT ION_ AND CHECKOUT WILL BE" A CHARGE AGAINST LW-3602 CONTRACT .
A
SECRET
5
,
1 tanin. 1
tttc:rpn f4:5:-,.., m4540.1
NATIa COV4:4474t4.41140 I
4,4151.1. l'Act.A5171A14."AItC514 1
vNt".
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
or-reveieeee-teeiletifit-retAIRIDP69130D27G-i000100096001-5
LOCKHEED-CALIFORNIA t3OMPA1Y
ENGINEERING STUDY n
CHANGE PROPOSAL Ea)
rt, A. c 22-56-2
DATE 16 JUNE 1967
AFFECTS:
0 PROJECT
In
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
,
TITLE OF PROPOSAL :
MEASUREMENT OF ROLL, PITCH AND YAW'
NATURE OF PROPOSAL: This ECP mill provide a method of accurately determining airplane
roll, pitch and yam. A 70mm camera will be fixed to the structure of the airplane and
will be run at the same time 88 the Type I or Type II system.
This ECP includes the design and manufacture of one comparator system,development of
the computer program required to analyze comparator data and one (1) ata run with
Type I or Type II System.
REASON FOR PROPOSAL: This ECP provides a method for checking the performance and ,
quality of the airplane camera systma. For a more eamprehensive description of this
program, please refer to the letter J 7to Jo:inn Parangosky, dated 3 September
1964 on the subject of Am.12 optical provisions.
Budgetary ECP approval TWX
Reason for Revision* To reduce the ECP scope to the design and development of the
computer program and analyze the initial data run in lieu of 5 data runs and to
revise the proposed Target Price accordingly.
,
. ES
ESTIMATED COST AND TIME INVOLVED :
N/A
ADDITIONAL FUNDING REQUIRED:
i. C P
ESTIMATED COST FOR KITS OR PARTS :
(See Page 2.)
ADDITIONAL FUNDING REQUIRED:
,
ITEMS AFFECTED BY PROPOSAL :
r---
SAFETY
0
MISSION
EiTEC-
1 IVENESS
0
PEFRM-SMI
aCE
0
ZLM
Ill
INTER.
CFA -WEI
ABILITY
Li
EIVTI*T?at
IT S.
BALANCE
0
SUPPORT
EQUIPMENT
El
AIN1."MCI
PROCEDURE
rA1
li
DiD
Lt2L
irWI4-
NP4(1
MANUAL
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
AVAILABILITY WEEKS. AFTER APPROVAL
N/A
DISPOSITION OF SPARES AFFECTED Si
NF
NIA
r----
L INITIATED BY :
APPROVED :
I
1 1.2
? -0 ?
. PROJEC
. -
?
1 '1'7
-3PAt.F 1 OF 2.
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
?
LO 1 am-CALIFORNIA COMPANY
ENGINEERING STUDY
CHANGE PROPOSAL
II
3
njy 22749-2
NRO
DATE 16 JUNE 1967
AFFECTS :
110 PROJECT
ri 25X1
NAME OF MAJOR COMPONENT
FUEL TANKS
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL
FUEL MANAGEMENT REVISION
NATURE OF PROPOSAL: This ECP covers the engineering design and fabrication of kits
riired to ..? .e the fuel tank sequencing of tanks #3 and #4 in A.12 aircraft(g)
125-132 13 and Also included are kits necessary to accomplidh the transfee
of fuel from to tank #6 and stop the transfer vthen 6800o pounds of fuel re.
main in tank #2 in aircraft 121, 122 and 125-132.
Partial kits vill be provided for the transfer of fuel from tank #2 to tank #6 for
aircraft 134 and 135. :Included in the kits will be:
Part Number Noun Ski
7-860-1 Shutoff Vag-- .
6-160-1 Pressure Refueling Valve . 2
7-160-1 , Pilot Valve 2
REASON FOR PROPOSAL: This ECP will result in tank #4 being the last tank in the fuel
sequencing. As a result, the C.G. of the article viii be moved further aft for a
greater portion of the cruise condition. Moving the C.G. aft reduces trim drag, and
results in greater range. .
?
Reason for Revision: To reflect that partial retrofit kits for the transfer of fuel
tank #2 to tank #6 in aircraft 134 and 133 will be provided and to reduce the proposed
TarrlIce accordingly. The valves procured for these aircraft will be shipped to
th or use as field spares.
This ECP was approved by Headquarters Message 2341, dated 10 February 1965.
S
ESTIMATED COST AND TIMEINVOLVED :
. NA
ADDITIONAL FUNDING REQUIRED :
IESTIMATED
! CP
COST FOR KITS OR PARTS:
s (See Page 2.)
ADDITIONAL FUNDING REQUIRED :
, ITEMS AFFECTED BY PROPOSAL :
1
1-.
SAFE1Y
1
1
1 0
MISSION
I f f EC-
TIVENESS
0
PERFORM-
ANCE
OPERATING
PROCEDURE
INTER.
CHANGE-
ABILITY
WEIGHT OR
WEIGHT IS
BALANCE
TO01.5
SUPPORT
EQUIPMENT
111
IL
MAINTE-
NANCE
PROCEDURE
SERVICE
LIFE
RIGHT
MANUAL
MAINTE .
NANCE
MANUAL
0
MAN/HRS. Raft. TO ACCOMPLISH CHANGE IN FIELD
1EST.
SOURCE OF PARTS FOR KiT4ADP will furnish
under Service Bulletins 649,818,819,871,
878 and 904.
AVAILABILITY WEEKS AFTER APPROVAL
IDISPOSITION OF SPARES AFFECTED
NOTED ON SERVICE BULLETINS
:-
INITIATED BY : .
i
L _ ____Aolged For Release 2002/08/16 ! CIAIRnPR9RnI1279R000100090001-5
APPROVED :
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved ForRelease2WailintiAlATIEF6990(1279Fr0;0100090001-5
LOCKEED-CALIFORNIAcompAn
CHANGE PROPOSAL
Rau.: 22.30_1
Ii
DATE 11+ %TANURY 1966
AFFECTS:
El PROJECT
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL : ?
COMPRESSOR INLET PRESSURE INDICATING SYSTEM
NATURE OF PROPOSAL: This system would enable the pilot to see the total inlet pressure
in ,each_compressor and the reouired total pressure on a triple indicator.? (See att-
ached pages 2 - 3 for technical description).
This BOP covers the following activities:
1. Design and development of the Pressure Indicating System.
2. Engineering design required to incorporate the System in A.I2 and YF-12A Air..-
craft.
3. Fabrication of retrofit kits for all A-12,Articles except- SiN 1211., andall YF-12A
aircraft.
'
The affect of this systed on the R-12 program will be covered on a separate 1IT-3664
ECP. (Continued on Page 2.)
REASON FOR PROPOSAL
1. Inlet pressure recovery can be directly checked during climb and cruise.
2. Will permit pilot to determine if inlet controls are functioning in a manner that
will allow completion of mission range.
3. This is only indication of inlet pressure recovery.
4. Present pressure recovery instrument now in use is simply made from a converted
dual reciprocating engine manifold gauge. It has been planned to replace this
with a true pressure recovery indicating system when sufficient flight test data
was available to make tbis possible. .
5. Pilot can read small aircraft yaw angles from differences in right and left inlets
(Continued on Page 3.)
ES
ESTIMATED COST AND TIME INVOLVED :
N/A
ADDITIONAL FUNDING REQUIRED
CP
1'
ESTIMATED COST FOR KITS OR PARTS :
(See Page 4.)
ADDITIONAL FUNDING REQUIRED :
ITEMS AFFECTED BY PROPOSAL
..---.
SAFETY
[
IIIDO
MISSION
EFFEC.
IIVENESS
PERFORM.
ANCE
- OPERATING '-
PROCEDURE
DO
INTER-
CHANGE.
ABILITY
WEIGHT OR
WEIGHT &
BALANCE
0
TOOLS
SUPPORT
EQUIPMENT
in
&
MAME.
NANCE
PROCEDURE
0
SERVICE
LIFE
ii
FLIGHT
MANUAL
El
/ MAINTE?
AF44=
ID
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD ------,
SOURCE OF PARTS FOR Ka ADP will furnish
AVAILABILITY WEEKS AFTER APPROVAL
under Service Bulletins A-662 and AF-345.
cl
DISPOSITION CW SPARES AFFECTED .
PARTS WILL BE RETURNED TO DEPOT FOR DISPOSITION. U)S
INITIATED BY : ?
ADP
APPROVED :
PROJECT
ZE
1337 Approved For Release 2002/08/16 : CIA-RDP69B00279611100090001P-A lOF 4. 3
RO
25X1
ECP 22-30-1
Approved For Release 2002/08/16 : CIA-RDP691300279Rb00184990M1f154.
14 January 1966
NATURE OF PROPOSAL (Continued)--
The proposed system calculates and provides a visual display of the pressure defined
by the expression, P = Ve 2P400. Visual displays of actual left and right static
400
pressures are provided in such a manner as to permit comparison with the calculated
pressure.
The pressure display is obtained through the use of a triple pointer indicator. A
separate electronics package houses the associated amplifiers and bridge circuits.
Potentiometer type pressure transducers are employed to convert the left and right
static pressures into an electrical signal. Intelligence for use in the pressure
calculation is obtained by means of Characterized potentiometers located in and driven
by the Air Data Computer.
One of the potentiometers located in the ADC is characterized to produce an output
which is proportional to Ye 2. The second potentiometer is characterized to produce
400
an output which is proportional to 1 . These potentiometers, in conjunction with
Fr+134.
two (2) fixed resistors and two (2) trim potentiometers, constitute one half (i) of
a Wheatstone bridge. Trim pots and resistors in the electronics package and a re-
balance potentiometer in the indicator, make up the second half of the bridge. Bridge
Unbalance is amplified and a servo motor drives the indicator potentiometer wiper to
the position required to restore balance.
Indicator - The proposed triple pointer indicator contains three (3) motors, three
(3) gear trains, and three (3) rebalance potentiometers within a single square case.
The' indicator places the calculated pressure in the form of a bug type pointer which
provides visual representation of an allowable pressure band width.
Approved For Release 2002/08/16 .: CIA-RDP69600279R000100090001-5
cp
or 4.
Approved For Release 2002/08/16 : CIA-RDP691300279RO001000900014 Je.nun_ry 1966
Control Unit - This unit contains the three (3) bridge circuits and the three (3)
amplifiers required for the system.
Internally, this device consists of five (5) rectangular circuit boards which FLre
supported from the bac:I:plate by means of standoffs. :ix (6) potentiometers are lo-
cated under a cover on the backplate and are used for field adjustment of the system.
Two (2) multipin connectors are employed for making electrical connections.
The circuit used to calculate pressure is essentially a Wheatstone bridge. Ralf of
the bridge is located in the control unit and the other half is in the ADC.
Pressure Transducer - The proposed pressure transducers are of the bellow/potentio-
meter type. Provisions can be made to attach these units to the control unit or they
may be situated at some other convenient point. These devices will be in a location
which will minimize the required pressure line run.
REASON FOR PROPOSAL (Continued)
6. When used with the Lockheed inlet control, this indicator will be used also to
peak 121) the inlet performance when using the manual mode. This indicator is
most essential when on manual mode in order to obtain maximum ensine performance
without inlet blowout.
7. This indicator, of course, tell when the inlet is started.
Red!:,on for .ovision:
To submit Proposed Taret Price. This price reflects a reduction in the engint!erin
and. mmufacturinc effort, the material costs and the deletion of shin 124.
This 'SOP was apl)roved by deadquarters Message 2341, dated 10 February 1965.
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release
LOCYJIEED - CALIFORNIA COMPANY
2002/08/16 : CIA-RDP6960027
ENGINEERING STUDY
CHANGE PROPOSAL
II
g
?
R000100090001-5
ti, A r 22_30
,... i
1
DATF114. October 19611
AFFECTS:
M PROJECT
T",
r
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL:
COMPRESSOR INLET PRESSURE INDICATING SYSTEM
NATURE OF PROPOSAL:
This system would enable the pilot to see the total inlet pressure in each compressor
and. the required total pressure on a triple indicator. (See attached pages 2 - fnr
technical description.)
This ECP covers the following activities:
1. Design and. development of the Pressure Indicating System.
2. Engineering design required to incorporate the System in all A-12 and AF-12 Aircra 1
3. Fabrication of retrofit kits for all A-12 and AF-12 Aircraft,
4. Installation on all A-12 and. AF-12 Aircraft.
The affect of this system on the R-12 program will be covered on a separate HT-3664 EC i
, (Continued- on Page 2)
REASON FOR PROPOSAL :
1. Inlet pressure recovery can be directly checked. during climb and cruise.
2. Will permit pilot to determine if inlet controls are functioning in a manner that
will allow completion of mission range.
3. This is only indication of inlet pressure recovery.
4. Present pressure recovery instrument now in use is simply made from a converted
dual reciprocating engine manifold gauge. It has been plaipaed to replace this
with a true pressure recovery indicating system when suff14ent flight test data
was available to make this possible.
5. Pilot can read small aircraft yaw angles from differences in right and left inlets.
I
(Continued on Page 3)
.
ESTIMATED COST AND TIME INVOLVED
ADDITIONAL FUNDING REQUIRED:
C P
ESTIMATED COST FOR KITS OR PARTS: ECP Budgstary Target Price
See Page 4. Est. of R'ol. Program Costs
ADDITIONAL FUNDING REQUIRED: Total Program Cost
ITEMS AFFECTED BY PROPOSAL :
I
??????n
SAFETY
111
MISSION
EFFEC-
1 I VE NESS
0
PERFORM-
ANC E
0
OPERATING
PROCEDURE
0
INTER-
CHANGE-
ABILITY
M
WEIGHT OR
WEIGHT I
BALANCE
0
TOOLS
SUPPORT
EQUIPMENT
II
&
MAINT
PROCEDURE
E.
NANCE
In
SERVICE
LIFE
0.1
FLIGHT
MANUAL
MAINT E.
NA NC E
MANUAL
0
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
AVAILABILITY WEEKS AFTER APPROVAL
SERVICE BULLETIN TO BE WRITTEN
DISPOSITION OF SPARES AFFECTED
PARTS WILL BE RETURNED 'TO DEPOT FOR DISPOSITION
INITIATED BY :
LAC
? - ---?--
APPROVED :
--- ------
- . _
1337
pprove or e ease UUIV?I1b : - E1 OF i.
RO
25X1
TAT
STAT
'IRO
25X1
Approved For Release 2002/08/16 : CIA-RDP696002791400bgb0bdie1-5
Page 2 of 4.
NATURE OF PROPOSAL (Continued)--
The proposed system calculates and provides a visual display of the pressure defined
by the expression, P = Ve 2P400. Visual displays of actual left and right static
400
pressures are provided in such a manner as to permit comparison with the calculated
pressure.
The pressure display is obtained through the use of a triple pointer indicator. A'
separate electronics package houses the associated amplifiers and bridge circuits.
Potentiometer type pressure transducers are employed to convert the left and right
static pressures into an electrical signal. ,Intelligence for use in the pressure
calculation is obtained by means of Characterized potentiometers located in and driven
by the Air Data Computer.
One of the potentiometers located in the ADC is characterized to produce an output
2
which is proportional to Ve . The second potentiometer is characterized to produce
400
an output which is proportional to 1 . These potentiometers, in conjunction with
4FTO
two (2) fixed resistors and two (2) trim potentiometers, constitute one half (i) of
a Wheatstone bridge. Trim pots and resistors in the electronics package and a re-
balance potentiometer in the indicator, make up the second half of the bridge. Bridge
unbalance is amplified and a servo motor drives the indicator potentiometer wiper to
the position required to restore balance.
Indicator - The proposed triple pointer indicator contains three (3) motors, three
(3) gear trains, and three (3) rebalance potentiometers within a single square case.
The indicator places the calculated pressure in the form of a bug type pointer which
provides visual representation of an allowable pressure band width.
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69B00279R0001n9Ggi13-
Page 3 of 4.
Control Unit - This unit contains the three (3) bridge circuits and the three (3)
amplifiers required for the system.
Internally, this device consists of five (5) rectangular circuit boards which are
supported from the backplate by means of standoffs. Six (6) potentiometers are lo-
cated under a cover on the backplate and are used for field adjustment of the system.
\
Two (2) multipin connectors are employed for making electrical connections.
The circuit used to calculate pressure is essentially a Wheatstone bridge. Half of
the bridge is located in the control unit and the other half is in the ADC.
Pressure Transducer - The proposed pressure transducers are of the bellowshotentio-
,
meter type., Provisions can be made to attach these units to the contra unit or they
may be situated at some other convenient point. These devices will be in a location
which will minimize the required pressure line run.
REASON FOR PROPOSAL (Continued) --
6. When used with the Lockheed inlet control, this indicator will be used also to
peak up the inlet performance when using the manual mode. This indicator is
most essential when on manual mode in order to obtain maximum engine performance
without inlet blowout.
7. This indicator, of course, tells when the inlet is started or unstarted.
This ECP was Item 0 on our 30 April 1964 ECP listing. We are proceeding based upon
approval given in H's TWX 6882, dated 12 May 1964.
Approved For Release 2002/08/16: CIA-RDP69B0b27814800100090001-5
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
_
Approved For Release
LOCKHEED-CALIFORNIA C01.4PANY
20gigt/i1E6RI:NCdAs-lyg69Bn279000100090001-5
CHANGE PROPOSAL E
1
ft, A. C 22-29-1
I
DATE
14 JANUARY 1966
AFFECTS:
II PROJECT 0
NAME OF MAJOR COMPONENT
VOICE RECORDER
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL :
PILOT VOICE RECORDER
NATURE OF PROPOSAL:
This ECP provides a destructible pilot voice recorder in all A-12 Aircraft (13 Ships).
The program includes the selection of the recorder, development of a destruct system,
modifications to the recorder to increase recording time to the level consistent with
minimum plaYback intelligibility of sound, and production of kits required to incor-
porate the recorder system on all A-12 aircraft.
. .
REASON FOR PROPOSAL: This program satisfies Headquarters revir6ment for a destructi-
ble scratch pad for pilots. The recorder selected as best applicable for tlis re- 1
quirement is a Dictet which is modified to slow down the speed and add a series of
Exothermus Tape for destruct capability. This recorder is outfitted with i mill tape
and provides approximately one hour plus of recording time. The recorder is energized
by an on-off switch and started by means of the pilot microphone button. The recor
time provided should be sufficient for all operational missions presently planned.
The destruct system is triggered by pilot ejection.
This ECP was approved per Headquarters Message 3690, dated 5 March 1965.
Reason for Revision: To submit Proposed Target Price. This price reflects increased
developmental costs.
ES
ESTIMATED COST AND TIME INVOLVED :
NiA
ADDITIONAL FUNDING REQUIRED:
?
CP
ESTIMATED COST FOR KITS OR PARTS :
(See Page 2.) -
ADDITIONAL FUNDING REQUIRED:
ITEMS AFFECTED BY PROPOSAL :
SAFETY
MI
MISSION
Ef FEC.
*I IVENESS
.
PERFORM-
ANCE
OPERATING
PROCEDURE
INTER-
CHANGE-
ABILITY
WEIGHT OR
WEIGHT &
BALANCE
-
TOOLS
SUPPORT
EQUIPMENT
111
I
MAME-
NANCE
PROCEDURE
IIII
SERVICE
LIFE
III
ir
FLIGHT
MANUAL
1
II
MAI
NANCE
MANUAL
NTE-
III
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT ADP will furnish
under Service Bulletin 91.3..
AVAILABILITY WEEKS AFTER APPROVAL
-
DISPOSITION OF SPARES AFFECTED
DISPOSITION
N/A 01 N
INITIATED BY :
PRQJECT HEADQUARTERS ?
APPROVED :
C
1337 Approved For Release 2002/08/16 : CIA-RDP69B00279R000100090001e6GE 1 OF
2.
25X1
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
Approved Rh-ka Release 2002/08/16 : CIA-RDP691300279R000100090001-5
'le
SECRET
MEMORANDUM TOR THE RECORD
SUBJECT; Routine Meeting with the[7:4NR0
N RO 1. At 1600 hours on the 4th of February, 1, as Director of
25X1 Program B, FRO, met with Dr. McMillan, as the DetNRO, on a
routine review of current status of NRO programs.
Z. The primary purpose from my viewpoint of the meeting
was to explain the status of the ECP'. of the OXCART vehicle; to
report on the progress of a two-year program plan for the OXCART;
and to advise him of the forthcoming request for authority to transfer
funds from * surplus in the OXCART airframe account to ? shortage in
the J-58 engine account during the current fiscal year.
3. After a review of the current pending ECPts, the D/NRO
indicated complete satisfaction with my explanation of our proposed
ECP's and that routine approval would be forthcoming shortly. In
addition, he felt that bad sufficient control over the ECP program
NRO and that he would raise the requirement for D/NRO approval on ECP'.
25X1 fron Ilie also indicated that would
receive authority to transier surpluses from the aldrame account to
the engine account as required.
25X1
1,.... ,
litio1 1
lExtli-,,:?.1 ';',":7,1 aatomatIc .
.7:-.._n,3 and
trInzsM?adan
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
Approved Fo Release 2002/08/16 : CIA-RDP691300279R000100090001-5
Noe'
SECRET
25X AD/OSA/JCLedforell
Distribution:
AD/OSA
.2 DD/Sta
.3 D.AD/OSA
14 C/PS/OSA
#5 Di TECH/OSA
.6 - DiTAJOSA
#7 Chrono
le ? RB/OSA
L
Signed1 'Jack C. )iford
JACK C. 1DYOR.D
, Colonel usAr
Assistant Director
(Special Activities)
25X1
25X1
25X1
25X1
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved F.4ifiZelease 2002/08/16 : CIA-RDP69B001W000100090001-5
dynes OF THE UNDER SECRETARY
25X1NRO
25X1 NRO
DEPARTMENT OF THE AIR FORCE
WASHINGTON
MEMORANDUM FOR Director,
NRO Program B
t FEB 17-!,-.
SUBJECT: Approval of Engineering Changes to OXCART
Reference is made to your memorandum of 3 February,
subject as above.
ECP's 22-30, 22-35, 22-36, 22-43, 22-49, and 22-58
are approved as submitted.
My 24 November letter which delegated you authority
to approve ECP's und
reflect ECP's unde
is hereby revised to
Please keep me apprised, on a monthly basis, on new
ECP's approved by you and also progress on major ECP's
'previously approved and in work.
Copy 2-DDCI
25X1:
Brockway M illan
iplificector
National Reconnaissance
Series B:
1-DD/S&T
2-D/TECH/OSA
3-PS/OSA
OXCART
4-CD/OSA
iL FROM AUTOMATIC 1171OR1,j:;
DOD Did. 5200.10 DOES NOT ARM
.7
i
NRO
25)(1
25X1
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
25X1
25X1.
25X1
25X1NRO
Approved Fgr,?Release 2002iI6iCIARDP69BOO2R000100090001-5
CENTRAL INTELLIGENCE AGENCY
WASHINGTON 25, D.C.
MEMORANDUM FOR: Director,
3 February 1965
gational Reconnaissance Office
SUBJECT: Approval of Engineering Changes to OXCART
25X1
NRO
25X1
1. Forwarded herewith are copies of six ECP's, each of
which is over land therefore requires your approval in
accordance with your letter of 24 November 1964. In addition I NRO
have attached a list of ECP's under ;hat I have approved 25X1
since receipt of your letter. In both cases, a short justification
explaining the reason for the ECP is included. More detailed
explanation may be found on the attached ECP's.
2. It is recommended that you approve the six above
I-land notify me so that the contractor may be advised.
3. The ECP's included in this document, plus those which
have been approved prior to your memorandum of 24 November 1964,
will provide for the so-called major modification program which we
have been studying recently, with the exception of the following:
a. The addition of extra fuel tanks which we are
recommending against.
b. The stiffening of the rudder post arms and the
modification of the air data computer to obtain
climb capability, and,
'
r-.....?,....,7,,,,--,-...............
Ei?.'..T..i1;.', eld
SECRET
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
25X1.
25X1
NRO
25X1
Approved FgRelease 2002/08/16 : CIA-RDP6913001.111R000100090001-5
SECRET
4. At this time it appears that the modifications enumerated
in,paragraph 3 above can be accomplished as service bulletins.
5. Although it appears that some savings could be obtained
by accomplishing some of these ECP's and service bulletins in one
modification program at Palmdale, I do not think the amount of
savings would justify the security risk and the longer-down time of
the aircraft which would result in going to Palmdale. I will have a
program plan for the A-12 for the remainder of FY 65 and 66 within
the next week which will demonstrate that we can accomplish our
objectives with the above ECP program and still be able to re-program
money from the airframe line item to the J-58 engine line item to
accomplish objectives in the engine ro rain.
JACK C. LE FORD
Colonel Director, Program B,
Attachments:
I ECP's underLi
(st)
II ECP's over /List)
III Six ECP's
2
RO
Approved For Release 2002/08/16: CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
NRO
25X1
25X1
25X1
?
24(1
, ?
251
25X1
25X1
Approved Fczatelease 20
-RDP6913002.74R000100090001-5
AD/OSA/JCLedfordn(2 Feb 65)
Distribution:
#1 - D/NRO w/atts
#2 - NRO Comptroller, w/atts I & II
#3 - DD/S&T, w/atts I & II
#4 - AD/OSA, W/atts I & II
#5 - D/TECH/OSA, w/ atts I & II
#6 - D/FA/OSA, w/atts I & II
#7 - CD/OSA, w/atts I & II
#8 - PS/OSA, w/atts I & II
#9 - D/ TECH/OSA (Chrono) w/atts I & II
#10 - RB/OSA, w/ atts I 8z II
3
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
ENGINEERING STUDIES
ES No.
.7 21-2
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
ENGINEERING STUDIES AND CHANGE PROPOSALS
25X1
Title Budgetary Estimate
New Antenna for ARC-50 DF Capability
ENGINEERING CHANGE PROPOSALS - BUDGETARY ITEMS
ECP No. Title
22-29 Pilot Voice Recorder
1- 22-56 Measurement of Roll, Pitch and Yaw
ENGINEERING CHANGE PROPOSALS - TARGET/CEILING ITEMS
ECP No.
25X1
Estimated Related
Contract CT-22 Program Costs Estimated Total
Budgetary Estimate (Other Contracts) Program Costs
Contract CT-22
Title Ceiling Price
Estimated Related
Program Costs Estimated Total
(Other Contracts) Program Costs
25X1
1,22-41 Stall Warning System
?22-5l Modifications to ADP Prototype Inlet
Control System
,-22-54 Modifications to 121: 122, 131 for Type I
2-2-65
Camera
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25X1
Approved For4elease 2002/08/16 : CIA-RDP69600274a000100090001-5
OSA - cPo'/S9-
2 February 1965
To: Contracting Officer, Contracts CT-22 and FT-21
Subject: TRANSMITTAL OF ENGINEERING STUDIES AND MANGE PROPOSALS
Transmitted herewith for your consideration and approval are the
attached Engineering Studies and Change Proposals.
CC:
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
NRO
25X1
25X1
Approved.Fupr
Release 2002/08/16 : CIA-RDP69130172t79R000100090001-5
Attachment 'I
to:
25X1
rIAILL1
25X1
NRO
LIST OF ECP'S UNDFA
25X1
22-7-2 Deletes replacement of two ARC-50 ground
stations. Thi5 WP was previously approved
for a total of I in March 1964 and
amendment No. 1 is merely to gain formal
approval of the deletion.
22-9-2
25X1
22-11-1
25X1
22-12-1
25X1
22-13-1
This amendment tc a previously approved ECP
is to increase the scope of lightning tests
by conducting some on the nose of the aircraft
in addition to the rudder. Ceiling price -
Oxygen system balance valve. This amendment
is to revise the system so as not to lose
oxygen from a system that has failed by re-
moving the failed system from usage. ECP 22-11
Ihad been reviously approved. Ceiling price -
A-12 parachute improvement program. ECP 22-12
had been previously approved. This amendment
Is concerned with developing a method to
provide additional altitude for better seat/
lane separation. The new ceiling price is
nd the work is completed.
Periscope improvement. This was previously
approved and the amendment adds the installation
of a new reticle to provide the pilot with the
ability to set his course by using the sun
compass. Total cost -
22-24 Drag chute deploy handle to replace 3-way
toggle switch. This was requested by the
pilots for more efficiency. Total cost -
22-27-1
25X1
rfr,
25X1
Map case destruct system. Previously approved
t
and this nmAndment s to establish firm ceiling
price Of
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
7:::nrtiq
,..11
25X1
25)(1
25X1
Approved kap Release 2002/08/16 : CIA-RDP69B0W9R000100090001-5
SECRET
Attachment I to:
22-62 Seat and parachute rework to accept more
powerful catapult developed under ECP 22-12-1.
Th* for Kedlock vehicles and was approved
by da1teiI 28 December 1964. Estimate
of re a e
22-66
Alternate steering
left hand, engine
Kedlock vehicles.
December 1964 approved t
system
in case of loss of
ulic pumps for
date?28
for
2
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
25X1
25X1
25X1
25X1
25X1
25X1
"A? i
1 a ro;latic
25X1
25X1
25X1
25X1
25X1
Approved For Release 2002/08/16 : CIA-RDP691300279R000100090001-5
SECRET
LIST OF ECP'S OVER
Attachment II to:
22-30 Compressor inlet pressure indicator to enable
the pilot to see the compressor inlet pressure
in each engine to determine if controls are
functioning in a manner that will allow com-
pletion of mission range. This is a necessary
change and had been approved for all Kcdl?
vehicles. Total program cost -
22-35
All Attitude Fuel Readout System.
At the present time the fuel guage reads
accurately only at an aircraft angle of attack
of 7 1/2 decrees. Estimated total program
costs -I
22-36 Design and develop four carts to aid in com-
plete checkout of control system. This has
been done previously by using whatever con-
tractor equipment available but is needed to
expedite operational checkouts on pre- and
post-flights. The ECP also includes equipment
for the Kedlock program. This ECP had been
previously approved and this is the formal
request. Total estimated cost -
22-43 Replace un all
OXCART venicies being retrotittea with Lockheed
electronic inlet control under ECP-48, previously
approved. Actual go-ahead will be withheld
until a final decision on inlet control.
Total program costs -
- 22-49
Design and engineer kits required to change
the fuel tank sequencing on all aircraft except
#121. This is to reduce trim drag and results
in greater range. Total cost -
22-58 Replace
il pressure transmitter with
to correct flight
aborts. The present transmitter has been
causing too rrenuent borts for reliability.
Total cost -
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25)6
25X1
25X1
2-5x1
25X1
25X1
25X1
25X1
25X1
25X1
A att!aagic
and
de;ImLicatIon
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
L0C1HE2M-CialaT01UiIA COMMITY
ENGINEERING STUDY 0
CHANGE PROPOSAL 0
IL A C 22-22-1
DATE
14 JANUARY 1966
AFFECTS:
0 PROJECT
Fi
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL :
TACAN
NATURE OF PROPOSAL :This EC? covers the development and manufacture of kits required to
incorporate TACAN in A-12 Articles 122,125-132 134 and 135. TACAN will replace the
ARC-15F Receiver and R18A Converter. In addition the Glide Slope Marker Receiver in-
stallation will be removed from the nose per
Installation is a
difficult tank requiring engineering for two (2) sets of Articles (1) 122,125-1aS and
(2) 129-131. Extensive modification is required in the "E-bar, cockpit and chine
areas.
,
EC? 22-75 will incorporate TACAN in Article 124.
STA
REASON FOR PROPOSAL :
Reason for Revision: To submit Proposed Target Price. This price reflects the trans-
fer of ship 124 to ECP 22 -75 for later installation, a reduction in the scope of
engineering and the deletion of installation costs.
This ECP was approved by Headquarters Message 798, dated 20 July 1964.
a.-
?
e. r
,ES
ESTIMATED COST AND TIME INVOLVED :
N/A
ADDITIONAL FUNDING REQUIRED: ..
CP
ESTIMATED COST FOR KITS OR PARTS: .
(See Page 2.)
ADDITIONAL FUNDING REQUIRED:
ITEMS AFFECTED BY PROPOSAL
SAFETY
111
MISS/ON
EIFEC.
liVENESS
III
PERFORM-
ANCE
OPERATING
PROCEDURE
0
INTER-
CHANGE-
ABILITY
DID
WEIGHT
WEIGHT
BALANCE
OR
I
TOOLS 6
54.1PP0111
EQUIPMENT
MAINTE-
NANCE
PROCEDURE
0
SERVICE
LIFE
0
FLIGHT
MANUAL
0
NAINTE-
NANCE
MANUAL
0
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FiELD
SOURCE OF PARTS FOR KIT ADP will furnish
under Service Bulletins: 605,733,783,882,
950 and 956.
AVAILABILITY WEEKS AFTER APPROVAL
DISPOSITION OF SPARES AFFECTED
Equipment removed from aircraft- wi.U. be returned to the Depot.
INITIATED BY :
PROJECT HEADQUARTERS
APPROVED :
PAGE 1OF 2.
Approved For Release 2002/08/16 :'CIA-RDP691300279R000100090001-5
NRO
25X1
NRO
25X1
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
I,
riocnize-m-CALIFORITIA COMMNY
ENGINEERING STUDY 0
CHANGE PROPOSAL [a
R. A C 22-22-1
DATE
14 JANUARY 1966
AFFECTS:
III
PROJECT
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL :
TACAN
NATURE OF PROPOSAL :This EC? covers the development and manufacture of kits required to
incorporate TACAN in A-12 Articles 122,125-132 1314. and 135. TACAN will replace the
ARC-15F Receiver and D18A Converter. In addition the Glide Slope Marker Receiver in-
stallation will be removed from the nose per
Installation is a
difficult task requiring engineering for twp U) sets of Articles (1) 122,125-139 and
(2) 129-131. Extensive modification is required in the "E -bay, cockpit and chine
areas.
?
ECP 22-75 will incorporate TACAN in Article 124.
STAT
REASON FOR PROPOSAL :
Reason for Revision: To submit Proposed Target Price. This price reflects the trans-
fer of ship 124 to ECP 22 -75 for later installation, a reduction in the scope of
engineering and the deletion of installation costs.
This ECP was approved by Headquarters Message 798, dated 20 July 1964.
,.-
vv?
c- r
S
ESTIMATED COST AND TIME INVOLVED :
N/A
ADDITIONAL FUNDING REQUIRED:
C P
ESTIMATED COST FOR KITS OR PARTS :
( See Page 2.)
ADDITIONAL FUNDING REQUIRED :
ITEMS AFFECTED BY PROPOSAL :
SAFETY
IIII
MISSION
EFFEC.
1 IV ENE SS
LI
PERFORM-
ANCE
LI
?MAW,*
PROCEDURE
0
INTER.
CHANGE.
ABILITY
0
WEIGHT 01
WEIGHT IL
BALANCE
TOOLS 4
SUPPORT
EQUIPMENT
!MINT&
PROCEDURE
MANCE
1111
SERVICE
LIFE
III
MANUAL.
i
NIGHT
is
MAINTE-
NANCE
MANUAL
D
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT ADP will furnish
under Service Bu.Uetins: 605,733,783,882,
950 and 956.
AVAILABILITY WEEKS AFTER APPROVAL
DISPOSITION OF SPARES AFFECTED
Equipment removed fron aircraft will be returned to the Depot.
INITIATED BY :
PROJECT HEADQ,UARTERS
APPROVED :
? -11,7"
Approved For Release 2002/08/16 :,CIA-RDP691300279R000100090001PAGE 10F
25X1
NRO
25X1
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Z 2 ,49
Approvec-t or hm edbe
LOCICHEED-tALIAMIA COMPANY
2Ouru8I1b. AluP ubm127bmmuulumum01-15
ENGINEERING STUDY
CHANGE PROPOSAL
i
[T]
22?.22
li
DATE
26 May 1964
AFFECTS:
0 PROJECT lg.]
f
NAME OF MAJOR COMPONENT?
? AIRCRAFT
PART OR LOWEST SUBASSEMBLY
r
PART NO. & MODEL OR TYPE
'
r
TITLE OF PROPOSAL :
TACAN ni JILL Ar.12' s STAT
NATURE OF PROPOSAL: InErtaLl TAN in all A-12 Articles. TAN ARIET replaces YOB
(ARC...15F receiver and. PaA converter). /n addition,e :._ e , ti .i.,. Marker Receiver
installation will be removed. from the nose per request Installation is
difficult job requiring different engineering for four s s o ,. cies (a) 121, 322,
125-128, 132,133 (b) 129-131 (a) 1211 (d) 134,135. Preliminary evaluation indicates job
can be accomplished. Major modification required in "E" - bay and cockpit as well as
changes in other areas including chines. Assumes TACAN and. Indicator is GFAE to I.
STAT #
/ get 7'
i ?,,
d
t 0
REASON FOR PROPOSAL: t
1.
Requests RCP.
i
2. To identify job and provide budgetary estimate.
3. We are proceeding with this job based upon authorization provided by
This is item 1 on "Anticipated FCP" list !submitted 30 April 1964.
?. STAT
IP ---
ES
ESTIMATED COST AND TIME INVOLVED :
c/ STAT
ADDITIONAL FUNDING REQUIRED:
CESTIMATED
P
COST FOR KITS OR PARTS: Budgetary Estimate Target
ADDITIONAL FUNDING REQUIRED: See Page 2 Ceiling
ITEMS AFFECTED BY PROPOSAL :
SAFETY
MISSION
EFFEC.
I I VENESS
0
-T
PERFORM-
ANC E
0
,
OPERATING
PROCEDURE
DO
INTER.
CHANGE-
ABILITY
,
WEIGHT OR
WEIGHT &
BALANCE
0
TOOLS
SUPPORT
EQUIPMENT
III
&
MAINTE-
PROCEDURE
NANCE
III
:ammo
SIMI
0
If
FL
MANUAL
IGHT
111
/MINH-
NANCE
MANUAL
MI
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE INFIELD .
SOURCE OF PARTS FOR KIT
Service Bulletin to be Written
AVAILABILITY WEEKS AFTER APPROVAL
?
.
DISPOSITION OF SPARES AFFECTED
Equipment removed from Aircraft and Spares will be sent to Depot NF
,
INITIATED BY :
? ? 4 L. If ? 14Ni ? :41.1 4`#:.
: . .. .
APPROVED :
- . . . i
. ...
11-1,1
1337
25X1
TAT
0
5X1
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Next 6 Page(s) In Document Exempt
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Aooroved For Release 2002/08/16 : CIA-RDP69600279R000100090 01-
LOCKHEED - CALIFORNIA COMPANY
ENGINEERING STUDY
CHANGE PROPOSAL
,
LAC 22-18-1
DATE
29 NOVIMER 1965
AFFECTS:
0 PROJECT
t
NAME OF MAJOR COMPONENT
OXYGEN SYSTEM
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL:
RETROFIT OF LOX SYSTM - A-12 ARTICLES ST/
NATURE OF PROPOSAL:
Provide kits to retrofit SiN 121, 122, 124-131 and 134, 135 to Liquid Oxygen
Two-place articles (8/N 124; 134 and 135) viii have the &lie '6zrgezi ia..ei
liters) as si lace articles; this is sufficient' capacity for
System. .,
?
..
mission an an
siions with failure of One system occurring "iir.-...
,
i . ,
'See BCP 22-8 for development cost end' iiieorporittion of LOX system in N .13? ana'133.
. . . ? .... . .. . .
- ... r
6.,.. ^ ..
,
REASON FOR PROPOSAL : .
Headquarters message
requests ECP.
Reason for Revision: To submit, Target/Ceiling Price.
, -
'ES
ESTIMATED COST AND TIME INVOLVED :
ADDITIONAL FUNDING REQUIRED :
CP
ESTIMATED COST FOR KITS OR PARTS: ?
See Page 2.
ADDITIONAL FUNDING REQUIRED: 4
ITEMS AFFECTED BY PROPOSAL :
SAFETY
II
MISSION
EFFEC-
lIVENESS
PERFORM,.
ANC!
111
OPERATING
PROCEDURE
INTER-
CHANGE.
ABILITY
11
WEIGHT OR
WEIGHT &
BALANCE
TOOLS &
SUPPORT
EQUIPMENT
0
lAAINTE.
NANCE
PROCEDURE
SERVICE
SIN
0
RIGHT
MANUAL
0
ALAINTE-
NANCE
MANUAL
0
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
Service Bulletin: 5744 592, 598, 709
AVAILABILITY WEEKS AFTER AF#PROVAL
.
DISPOSITION OF SPARES AFFECTED'
-,...7
INITIATED BY: _
PROJECT HEOQUARTEEp
APPROVED :
44/ (0
?1',/"1,
' Approved For Release 202i
NRO
25X1
725X1
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
---,t1jr:roved-For ReteasT-40172701871-6=TA7R1376"9130.027914C00100090001-5
LOCIOIRED CALIFORTTIA COMPANY
ENGINEERING STUDY 0
IL A. C
CHANGE PROPOSAL 11
22-18
DATE
April 30, 1964
AFFECTS:
PROJECT IA
NRO
25X1
NAME OF MAJOR COMPONENT
OXYGEN SYSTEM
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL :
RETROFIT OF LOA SYSTEM - A.12 ARTICLES
STAT
NATURE OF PROPOSAL:
Provide kits to retrofit B/N 121, 122, 124 - 131 and 134 135
to Liquid Oxygen System.
. .
Two place articles (B/N 124 134 end 135) vial have the same -
oxygen Capacity (20 liters) as single p1ace.artic1es .this iS
suffieient capacitY for nortal mieSion_and
missions vi.th failure o em-occuring at -mid
See ECP 22-8 for development '.cost- and incorporation ofL0)(Byitera
on B/N 132 andY 133.
REASON FOR PROPOSAL :
Headquarters Message
ES
ESTIMATED COST AND TIME INVOLVED :
ADDITIONAL FUNDING REQUIRED:
ST AT
CP
ESTIMATED COST FOR KITS OR PARTS: Budgetary estiraate: Retrofit Kits
Installation
Total
ADDITIONAL FUNDING REQUIRED :
ITEMS AFFECTED BY PROPOSAL :
SAFETY
MISSION
PERFORM
OPERATING
INTER-
EFFEC-
ANCE
PROCEDURE
CHANGE-
TIVENESS
ABILITY
WEIGHT OR
TOOLS I
MAINTE-
SERVICE
FLIGHT
MAINTE.
WEIGHT &
SUPPORT
NANCE
LIFE
MANUAL
NANCE
BALANCE
EQUIPMENT
PROCEDURE
MANUAL
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
Service Bulletin to be written
DISPOSITION OF SPARES AFFECTED
I
AVAILABILITY WEEKS AFTER APPROVAL
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
C'
Approved For Release
LOCKHEED-CALIFORNIA COMPANY
20132/08/16 : GIA-RDP69B002(9
ENGINEERING STUDY ?
CHANGE PROPOSAL
Utriummuutri-o
LAC 22-17
DATE .
June 3, 1961,
AFFECTS:
ED PROJECT
3
NAME OF MAJOR COMPONENT
CONTROL STICK
PART OR LOWEST SUBASSEMBLY
PART No. & MODEL OR TYPE
i .
TITLE OF PROPOSAL :
REPLACE CONTROL STICK GRIPS ON A-I2 AND AP-12 ARTICLES
.NATURE OF PROPOSAL:
Replace presently used B-9' control stick grip assembly with newly developed units
? made out of Magnesium. B-9 was fully qualified unit with no failures expel:Winced,
b' other Users. L.A.C. has had 3o% of units fail. We have developed a new source
for the isainesiuzi stick grip.' New unite will also be used on the R-,22., program.
. . .; q c...; . '
, - ,
. . .
..
h. .e
' L4 ,.,,., ... .. .. AA ,
r
' -
. ? ,.... ?
4
-REASON FOR PROPOSAL : , '''' -A.
.;
1. Replace 'defective' contra stick asseibiles. ..
. _ ,
. ,
We are proceeding with this job- on the basis of
..
.
STAT
--L.
? ES
ESTIMATED COST AND TIME INVOLVED :
ADDITIONAL FUNDING REQUIRED:
CP
ESTIMATED COST FOR KITS OR PARTS: SEE PAINS 2 ' Target Price
Ceiling Price
ADDITIONAL FUNDING REQUIRED:
ITEMS AFFECTED BY PROPOSAL :
SAFETY
0
MISSION
EFFEC?
TIVENESS
PERFORM,
' ANCE
El
OPERATING
PROCEDURE
DO
INTER.
CHANGE.
ABILITY
WEIGHT 00
WEIGHT &
BALANCE
D
TOOLS
SUPPORT
EQUIPMENT
I
IL
/MINT'.
NANCE
PROCEDURE
SERVICE
LIFE
FLIGHT
MANUAL
I
MAINTt.
NANCE
MANUAL
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
S=CE BULLET= 562
AVAILABILITY WEEKS AFTER APPROVAL
DISPOSITION OF SPARES AFFECTED
..... - 5XIIIRO 1,
SCRAPPED
INITIATED BY : -
, .
4" 44.,,
APPROVED :
,
1 --- -
7
0
25X1
TAT
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
-Ap pr-ov ed For Release 2002/08/16 i
-6--GIA-RBP691E100279KteeeteeeNeei-5------1
?
LOCKED - CALIFORNIA COMPANY
ENGINEERING STUDY
CHANGE PROPOSAL
DATE
2y October 1964
AFFECTS:
RA c 22-24
NO
PROJECT rIc 25X1
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL :
DRAG CKUTE DEPLOY HANDLE
NATURE OF PROPOSAL:
Design effort, fabrication and assembly of kits to modify 13 A-12 articles to
accept a drag chute deploy handle.
Installation of handle is not a part of this ECP.
REASON FOR PROPOSAL:
The deploy handle replaces a three-way toggle switch. Pilots requested LAC t
provide a push-pull device in lieu of the toggle switch.
StAT
CP
ESTIMATED COST AND TIME INVOLVED :
ADDITIONAL FUNDING REQUIRED:
ESTIMATED COST FOR KITS OR PARTS :
ADDITIONAL FUNDING REQUIRED : (See Page 2).
Target Price
Ceiling Price
ITEMS AFFECTED BY PROPOSAL :
STAT
SAFETY
MISSION
PERFORM.
OPERATING
INTER.
WEIGHT 01
TOM 11
MAINTE.
SERVICE
RIGHT
ALAINIf ?
RUC-
MICE
PROCEDURE
CHANGE
WEIGHT 1
SUPPORT
NANCE
LIFE
AtANUAL
NANCE
I IVENESS
ABILITY
BALANCE
EQUIPMENT
PROCEDURE
MANUAL
0
El
III
El
I
II
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
AVAILABILITY
WEEKS
AFTER APPROVAL
SERVICE BULLETIN 5 90
DISPOSITION OF SPARES AFFECTED
NOT APPLICABLE
RO
INITIATED BY :
APPROVED:
25X1
HEADQUARTERS' PILOTS
Approved For Rolc\3so 200208/1-6-:
Q4A RDPG01300273R00010
030001-5
11.47
PAGE 10F 2.
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Next 4 Page(s) In Document Exempt
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For ReImtel2?:p3//M6A?Gq1A-R13P69-B00279RGOV0RW001-5
CRET
DERIIIRRED
ROUTINE
1,4URVIV
AVAILABLE 20 FEB'
ON
BASIS OF INDIVIDUAI:PILOTS;
CUSHIONS FOR THE SURVIVAL KIT. REPORT ON PROGRESS ONU
NT LEAST ONE PLLOT BY 1 MARCH 64.
C. DESIGN PAN TO INCORPORATE NEW PARACHUTE RELEAES
AND EMERGENCY OXYGEN SUPPLY IN PRESENT PARACHUTE CONFIG,
EIGHTY CU. IN. OF OXYGEN TO BE SUPPLIED IN DUAL SYSTEM
DESIGN:
D. CONTINUE EFFORTS TO REDUCE SUIT CONTROLLER BACK
PRESSURE. REQUEST REPORT ON PROGRESS BY 1 MARCH 64.
DAVID. CLARK CO.
A. PROCEEDWANARIIWITYKAASIS,ON A DESIGN TO
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For, IRMejaFsfL2902tETOtt:ECIA-RIBP69B00279ROM0R90001-5
RET
HELM WILL ALIA TIlE PrIOT TO: FLY WITH FAC
COCKPIT PRESSURE
. ,
VISOR; S AIJTOMWUC LY COCKPIT
ESSURE REDUCEDREPOR PROGRESS MARCH 64.
,, , *
4
REPORT' MiKCH ON PROGRESS OF. NEW DESIGN
PRESSURE SUIT GLQ
C. INVESTIGATE NEW APPROACHES TO INSURE LIGHTER
WEIGHT HELMET AS DISCUSSED IN SUPPLIERS MEETING ON 29
,AN 64. REPORT ON PROGRESS 15 MARCH 64.
D. HAVE PROTOTYPE OF WEDGE SOLE SHOES AND NEW
,ESIGN SPUR BY 15 MARCH 64.
INCORPORATE IN FLIGHT FEEDING PORT IN FPS
IELMET BY 1 APRIL 64.
F. IMPROVE FPS WATCH POCKET DESIGN BY 1 APRIL b4.
25X1
G. REQUEST STATUS ON FACE BARRIER ATION BY
MARtH 64.
COORDINATING OFFICERS
25X1
ELEASING aFFI
REP1ODUCT1ON BY OTHER THAN THE ISSUING OFFICE IS FRO1:116
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
1::o5or Release 2002/08/16
LOCKHEED-CALIFORNIA COMPANY
: CIA-RDP69B00270R000100090001-5
ENGINEERING STUDY
CHANGE PROPOSAL
?
gl
R., liek C 22-10
NP1
DATE
January 201 1964
AFFECTS:
n PROJECT
I 2
NAME OF MAJOR COMPONENT
PRESSURIZATION SYSTEM
PART OR LOWEST SUBASSEMBLY
SUIT VENT LINE
PART NO. & MODEL OR TYPE
AA-13-32
TITLE OF PROPOSAL :
SUIT VENT A/R SYSTEM REGULATOR
NATURE OF PROPOSAL:
Install
preasure regulator in airplane pressurisation system. Part
No. 392 - - e installed in A-I2 serials 121,122,44 thru 135 and Part ,
No. 392518-2-1 to be installed in AP-12 serials 1001 thru;1003.-. Dash numbers .
indicate pressure settings required: for differences in systems.
_
,- -
,
REASON FOR PROPOSAL: . .....
Present aireraft system meets all requireraents for szpplyi of air to pilotft e _
pressure suit, however improper regulation- of gait piessure can result in
increased oxygen usage due to additional physical exertion imposed. by "stiffness"
of suit. Installation of pressure regulator will more precisely Monitor supply
of pressure irrespective of manual suit valve setting.
,
STAT
id I
S
ESTIMATED COST AND TIME INVOLVED : STAT ...- I i
ADDITIONAL FUNDING REQUIRED:
CP
ESTIMATED COST FOR KITS OR PARTS : Target Price
ADDITIONAL FUNDING REQUIRED; SEE PAGE 2 Ceiling Price
ITEMS AFFECTED BY PROPOSAL :
SAFETY
MISSION
EFFEC.
1IVENESS
X0
PERFORM.
ANCE
OPERATING
PROCEDURE
ODD
INTER.
CHANGE.
ABILITY
WEIGHT OR
WEIGHT I
BALANCE
TOOLS
SUPPORT
EQUIPMENT
Il
L
MAINTE.
NANCE
PROCEDURE
SERVICE
LIFE
FLIGHT
MANUAL
1111
MAINTE.
NANCE
MANUAL
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
AVAILABILITY WEEKS AFTER APPROVAL
SB No. 505 & 506 83 138
DISPOSITION OF SPARES AFFECTED ?
NR
INITIATED BY :
LAC
? -- --
APPROVED :
- -----_____
w 2
S RE-1 A
ease : GIA-FDP69BOO279ROOO1 00090001-5 PAGE 1 OF 2
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release
LOCKHPYD - CALIFORNIA COMPANY
2002/08/16 : CIA-RDP69119279R000100090001-5
ENGINEERING STUDY
CHANGE PROPOSAL
rukc22-9 -2
N.F
DATE 29 October 1964
AFFECTS:
II PROJECT
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO. & MODEL OR TYPE
TITLE OF PROPOSAL ?
. LIGHTNING IIESTS
NATURE OF PROPOSAL:
1. Prepare for and conduct lightning tests on a plastic rudder using the metal
stub fin from the static test article as supporting structure.
2. Prepare for and conduct lightning tests on a section of the nose.
3. Tests were condueted at
4. Prepare and submit reports on the results of the above tests.
REASON FOR PROPOSAL:.
These tests are required to increase the safety of the operation.
furnish information relating to the strike probability patterns,
extent of resultant damage, and indicate problem areas requiring
Fixes resulting from these tests are not a part of this ECP.
This revised ECP is submitted to add Item 2,above, to the scope
/-
The tests will
the nature and
fixes.
of the job.
?
ESTIMATED COST AND TIME INVOLVED :
ADDITIONAL FUNDING REQUIRED:
C P
ESTIMATED COST FOR KITS OR PARTS : Target Price
Ceiling Price
ADDITIONAL FUNDING REQUIRED : (See Page 2
-
ITEMS AFFECTED BY PROPOSAL :
SAFETY
MISSION
EFFEC?
i iv LNESS
PERFORM-
ANC!
III
OPERATING
PROCEDURE
III
INTER.
CHANGE.
ABILITY
0
WEIGHT OR
WEIGHT &
BALANCE
TOOLS
SUPPORT
EQUIPMENT
III
&
MAINTE-
PROCEDURE
NANCE
SUN
SERVICE
LIFE
v
FLIGHT
MANUAL
MAINTR-
NANCE
MANUAL
0
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
NOT APPLICABLE
AVAILABILITY WEEKS AFTER APPROVAL
DISPOSITION OF SPARES AFFECTED
NOT APPLICABLE
LU
INITIATED BY :
MI
APPROVED :
25X1
1337
Approved For Release 2002/08/16 : CIA-RDP69B00279R000100090001ISGE 1 OF 2.
0
25X1
TAT
TAT
TAT
0
STAT Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
25X1
)RIG
JNIT
25X1 EXT
)ATE:
25X1 CO
A ? ? roved For Release 2tI3E/42gitts5li tArMalp02791RGOOI00090CU11-5.
ASD/OSA
ROUTING
SECRET
4Rm4DIRECTOR
i?L'NF ? 0 5 fris
N70
ILLEGIB
ILLEGIB
OXCART
CS.110
1. AS A RESULT OF THE SUPPLIERS CONFERENCEsOF 29 JAN
AT LAC DEALING WITH AEROMEDICAL AND LIFE SUPPORT SYSTEMS3 THE
FOLLOWING PRIORITY LISTING OF PROBLEM AREAS ARE DEFINED:
LAC
A. ASSUME RESPONSIBILITY OF DESIGNING A BALANCING
VALVE WHICH WILL INSURE EQUAL FLOW OF OXYGEN FROM BOTH
SYSTEMS. ACCEPTABLE TOLERANCE TO BE 200 PSI DIFFERENTIAL.
REQUEST BI?MONTHLY REPORTS ON THIS PRIORITY ITEM BE
SUBMITTED TO THIS HQS STARTING 1 MARCH 64.
B. INSTALL 1100 CU. IN. OXYGEN BOTTLES
IN AT LEAST ONE A/C BY 29 FEB 64.
ILLEGIB
ILLEGIB
C. CONTINUE PRESENT EFFORT TO INSTALL NEW REGULATOR
FOR SUIT VENT PRESSURE AT 10" ? 40" OF H20 AND APPROX.
12 CFM. IT IS UNDERSTOOD ONE WILL BE INSTALLED BY 1
MARCH 64, TWO BY 15 MARCH 64.
COORDINIATINL; OFFICERS
PELaASING OFFICER SECRET ..trApp
L 4fttaxikaVen NLITHENTICATING OFFICER I)
RFPRODUCTION 9', 07-1,FP, THAN T'.H.7 ISSUING OFFICE iS PROFUNTER CO2.! le,
Approved For Release 2002/08/16 : CIA-RDP69600279R000100090001-5
RIG:
NOT