STATUS OF TAGBOARD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP70B00501R000100140022-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 15, 2016
Document Release Date: 
August 19, 2003
Sequence Number: 
22
Case Number: 
Publication Date: 
August 18, 1967
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP70B00501R000100140022-6.pdf166.14 KB
Body: 
TOP SECRET Approved For Release 2003/09/30: CIA-RDP701300WROfigq)40022-6 IS) NATIONAL RECONNAISSANCE OFFICE WASHINGTON, D.C. OXCART/TAGBOARD August 18, 1967 MEMORANDUM FOR MR. NITZE MR. HELMS DR. HORNIG SUBJECT: Status of TAGBOARD Attached is a summary paper on the background and status of the TAGBOARD Program. This subject will be discussed at the August 23, 1967 meeting of the Executive Committee. Attachment Status of TAGBOARD NRO review(s) completed. FILE COPY NIS 25X1A TAG30ARD Approved For Release 200 P70B00501R0001001TOi5 TW%E-CA CL Alexander H. Flax . N40-1 TOP SECRET OXCART/TAGBOARD 25X1A Status of TAGBOARD BACKGROUND In late 1966 the DNRO requested and received approval to reorient the TAGBOARD drone program to be launched from a B-52 instead of an A-12. This.decision followed upon inconclusive findings of the investigation of the A-12 drone accident and the recommendation by the DNRO to use the B-52 instead of the A-12. Contractor go ahead was given in January 1967. Three flights were conducted by launch from the A-12 which demonstrated successful operation of the engine inlet, inertial navigation and flight control systems. These flights were respectively 125,,1100, and 1500 nautical miles. We have not yet demonstrated successful termination of flight to include recovery of the payload. MILESTONES ACHIEVED SINCE PROGRAM REDUCTION 1. Modification of the first B-52 has been completed and work on the second aircraft is underway. 2. The inertial navigation system, including the star . ~~acker, has been checked out in the B-52? with an average ,ARI j"'AGBOARD Approved For Release 2003/09/30 : CIA-RDP70B005000100140022-6 -Approved For Release 200T9P/2@ECREF DP70B00501R000100 1iaF_COPIES EKCLUDCD FROM AUTOMATIC REGRAOINO Approved For Release 2003/09/30: CIA-RDP70B0050QP4 40022-6 TOP SECRET OXCART/TAGBOARD 3. The first mated flight with asymmetrical loading and dummy booster has been completed with all load and stability readings satisfactory. NEW TESTING Delivery and firing of the first hot booster on a test stand was successfully demonstrated August 14, 1967. Three more such test firings are planned prior to the launch of the first drone. This test series is late and is currently the c:r ;tica1 pacing item of the program. In addition, four free launches of the drone will be conducted on the Pacific Missile Range from September through December to complete the test program. It should be recognized that every time a TAGBOARD Is flown, the airframe (but not the sensor and certain other high cost components) is expended. SUMMARY 1. At present it is anticipated that the conversion of the TAGBOARD from A-12 to the B-52 for launching of the drone will have been completed with testing by January 1968. How- ever, further delay in rocket motor qualification or unantici- pated problems in launch could slip this date. 2. A decision has been made to procure 12 drones with 1968 funds for delivery in FY 68 and 69. This was considered by the DNRO to be the best.buy from alternatives available 25X1 D 25X1A CONTROL NO Approved.For Release 2003/0I9: S jl0B00501 R00010014QO2 OF COPIES ? .aw.. EKCLUOEO FROM AUTOMATIC REORADINO /ROE-__+r or Doe butetozt .YPN a