PROJECTED SOVIET BLOC AND OTHER DEFENSIVE ENVIRONMENTS THROUGH THE 1975-1980 PERIOD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP71B00822R000200130019-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
February 13, 2004
Sequence Number: 
19
Case Number: 
Publication Date: 
July 11, 1968
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP71B00822R000200130019-3.pdf91.85 KB
Body: 
Approved For FJease 2004/?.W@A f, pIA-RDP71 B008220000200130019-3 25X1 Copy ? __-L 11 July 19 68 25X1 MEMORANDUM FOR THE RECORD SUBJECT: Projected Soviet Bloc and Other Defensive Environments through the 1975-1980 Period 25X1 1. Reference (a) is the OSI response to reference (b;{ that OSI project the defensive weapons environment of the "Soviet Bloc" and selected other countries into the 1975- 1980 time period and endeavor to establish a performance ert- velope in which a survivable, quick reaction, aerodynamic, reconnaissance vehicle might viably operate. The memorandum goes into considerable detail regarding the uncertainties of the estimates due primarily to the lack of good intelligence plus the fact that projections so far into the future are difficult to make even with good intelligence as a data baEe. 2. Nevertheless the document does address all of the defensive possibilities and notes that in many regards the projections made are pessimistic from the point of view of OSA's problems. With reference to the USSR, this observation could be designated the "understatement of the year." N ROAr ri (& fWkW2004/O5/21 : CIA-RDP71 B0d 822"00020 39919 25X1 Approved For Release 2004/W~ ,IA-RDP71 B008221 QbO200130019-3 I age 4. Considering first the reconnaissance role outside of the USSR, it is difficult to comprehend a legitimate justification for an advanced concept study other than improve- ment of the OXCART. There have been, at various times, proposals for increasing speed and altitude of the A-12 which when coupled with the established reliability and capability would appear to make this a survivable reconnaissance platform for the 1975-1980 period. The cost of re-establishing a fabrication facility for the A-12 would unquestionably be considerably less than the cost of a completely new develcpment program in addition to providing a known and demonstrated capability and reliability. 5. The capability of the projected USSR defenses has been so positively stated in paragraph 25k of reference (a) that one can take solace only in the fact that this does represent an estimate based on little intelligence and much speculation. However, before initiating any advanced concept study which could potentially result in a billion dollar program, it could appear to be mandatory to concentrate all effort on acquiring firmer intelligence regarding at least the present USSR de- fensive capability from which a more realistic projection could be made. It- is suggested therefore that rather than atter pting to justify an advanced concept study effort, a request be pre- pared for authorization to focus heavily on acquiring USSP defensive data, 6. In'summary, it is recommended that the EXCOM be solicited to approve a performance improvement investigation for the OXCART to be used outside of the "Soviet Bloc" durin the 1975-1980 period 25X1 25X1 25X1 25X1 25X1 ASD/R&D/OSA ASD/R&D/OSA 11 July 68 Distribution: Copy 1 - ASD/R&D/OSA Copy 7 - RB/OSA 2 - D/R&D/OSA 3 - DD/SA 4 - A(T)D/R&D/OSA -%ppr&Va%4ftIW a 2004/05/21 : CIA-RDP71 B00O 25X1 6 - ASD/R&D/OSA(Chrono) SECRET