LETTER TO HOWARD FROM COLIN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP72B00464R000100010007-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
9
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 5, 2010
Sequence Number: 
7
Case Number: 
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP72B00464R000100010007-7.pdf541.06 KB
Body: 
Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 CJC:69026 1 December 1969 We are forwarding the enclosed Proposal CJC:6 for a system of purging the telescope assembly. The proposal is submitted in response to suggestions by field personnel that a system be devised whereby the system could be purged externally. Purging the telescope in the present configuration requires that the dome assembly be removed and each side of the telescope purged separately. The purge system allows the telescope to be purged by removing only the system purge port and two screws from the manifold. A manifold assembly is installed inside the system purge port. The two chambers of the telescope are connected in a series using Tygon tubing. The tubing also connects the intake and vent port on the telescope to the manifold assembly. The telescope is purged by removing the system purge port and two screws of the manifold assembly and connecting nitrogen to one manifold port and venting through the other port for approximately five minutes. Recent findings suggest that the telescope be purged at each preflight and post flight inspection. It is recommended that the proposed change incorporating the proposed purging system be accom- plished in the next factory overhaul; however, if you do not feel that this is soon enough, field installation is feasible. Kits can be made available in about thirty days after approval from you. Enclosure (1) is a summary of the cost to fabricate and install thirteen each surge systems, twelve for the production group and one spare. Enclosure: (1) Cost Breakdown Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 cJC:69026 Enclosure (1) Material Raw Material $60 Total Materials $ 60 Material Burden @ 11% 6 Total Material Including Burden $ 66 Hours Rate/Hour Amount R&D POOL (Engineering) Salaried Hourly 76 7.00 532 300 4.46 1,338 Total R&D Direct Labor 1,870 Direct Labor Overhead @ 135% 2,525 Total Direct Costs Including Overhead 4,461 General and Administrative Expense @ 14.8% 660 Total Estimated Cost 5,121 Fixed Fee 410 Total Estimated Cost Including Fixed Fee $5,531 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 6A 0 We have reviewed the referenced contract and have the following comments to offer: 1. It is our understanding that AG-1103 is strictly a repair contract. Outside of minor necessary materials, all new spare parts to be used with this contract will have originated under AG-1100 or AG-1104. 2. It is our further understanding that all work chargeable to this contract snail be authorized by a Depot Work Order or an approval from Headquarters. In effect there is no "sustaining" ' money in this contract; such sustaining requirements will be met under AG-1100 until 30 June 1970 after which a new contract will be negotiated. 3. We are unable to execute the certificate, page 3, of this con- tract since the holders of the Corporate seal are not cleared nor aware of the existence of this contract. )4. In accordance with the Changes Clause, it is requested that the following; changes to Appendix I, Exhibit A to the contract be approved: a. Under paragraph 3, besides the 11;0' materials charge, the computer automatically applies a 14.8% G&A as a DCAA approved charge. The 14.8' G&A, the eerore, needs to be added to paragraph 3. (= 'f ``' 1 1 /i ct b. under paragraph 4, travel costs, although covered by riy outside criecking account at cost, also are charged with a 14.8% G&A as "other costs" when I submit a request for additional funds for my account. The 14.8% G&A also needs to be added to paragraph 4. With your concurrence of the foregoing, we are executing the AG-1103 Contract and forwarding herewith Copies 1 and 3. Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 DATE 17 July 1969 MEMORANDUM FOR: Chief, Industrial Audit Division, OSA SUBJECT: Request for Audit CONTRACTOR: Aerojet-General Corp. Contract No: AG-1103 Type of Contract: T&M Type of Audit Required: Dollar Value of Contract: Date Audit Required: NEGOTIATOR: Proposal Attached Cost Analysis $125,000 CMu/-O s7 - MEMORANDUM FOR: Contracts Management Divitis~i.on,~ OSA Audit Scheduled For: DTIK bsm- . STAT Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 SECRET hen Filled In) REQUEST FOR PAYMENT AND POSTING VOUCHER TO ? Accounts Division (Room Bldg. ,THROUGH: Monetary Division (Room Bldg. Request payment be made and/or transaction be recorded as indicated below. Pertinent documentation in support of this transaction is on file in this office. PAYMFNT TO~ Ze4 "2 "T E > ~ , /f2 CASH PAYMENT U.S. TREASURY CHECK THE ATTACHED CHECKS AND/OR CASH IN THE AMOUNT OF 34-36 STATION CODE I HEREBY AUTHORIZE MY AGENT, WHOSE SIGNATURE APPEARS BELOW SHOULD BE TAKEN INTO ACCOUNT AS INDICATED BELOW. DATE SIGNATURE OF PAYEE TO RECEIVE $ JDATE SIGNATURE OF AGENT DESCRIPTION- ADVANCE ACCOUNTS 13-27 32-33 DIV. I 1 T i i I i 1 1 40- 41 E xc P O E D N E D 4-UH U~Ul Ll 42-47 48-49 OBLIG. REF. NO, PAY ADVANCE PER. ACCT. NO._ LIQ. DATE I REVIEWED BY olGENERAL S LEDGER YR ACCT. NO, INVOICE NO(S). J Ad / CONTRACT NO. !~ 3 CHECK TO BE DATED OF OFFICIAL FUNDS IN CURRENCY ON MY BEHALF. DATE SIGNATURE OF RECIPIENT 55-56 ALLOT: COST-FAN ACCOUNT SYMBOL 71-60 AMOUNT I 1 , to ri + j{ .I.. 67-70 OBJECT CLASS 68-70 , DUE DATE DATE (SIGNATURE OF CERTIFYING OFFICER MOYI i CCCIWCO AOY AUTOMATIC awwwwwwlws ASS OCC~AOO1.ICATIww Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 AGENT CASHIER CHECK i iBANK CASHIERS CHECK STAT S dG D py pp PUit?raC VOUCHER FOR PURCHASES ANA VOUCHER NO. AO5D00 1034-114 SERVICES OTHER THAN PERSONAL Compl. #1 U.S. DEPARTMENT, BUREAU, OR ESTABLISHMENT AND LOCATION DATE VOUCHER PREPARED SCHEDULE NO. 23 December 1970 CONTRACT NUMBER AND DATE PAID BY AG-1103 5 November 1969 REQUISITION NUMBER AND DATE I Aerojet Electrosystems Company PAYEE'S 1100 W. Hollyvale NAME Azusa, California 91702 DATE INVOICE RECEIVED AND ADDRESS L DISCOUNT TERMS PAYEE'S ACCOUNT NUMBER SHIPPED FROM TO WEIGHT GOVERNMENT B/L NUMBER NUMBER DATE OF ARTICLES OR SERVICES OUAN? UNIT PRICE AMOUNT AND DATE DELIVERY (Enter description, item number of contract or Federal OF ORDER OR SERVICE supply schedule, and other information deemed necessary) TITY COST PER As of 29 Nov. Salary Hours W. 0. 8941-03 2201 19.40 Hr. 42,694.ooy~,6 1970 Hourly Hours W. 0. 8941-03 2523 14.04 Hr. 35,422.92 Final B illing Mat'l & O.D.C. W. 0. 8941-03 5,910.00 Mat'l Burden 11% 650.10 ` G&.A on Mat'l + Burden 14.8% 970.89 - (Use continuation sheet (s)q+,ecessary) (Payee must NOT use the space below) TOTAL PAYMENT: APPRO DFOR EXCHANGE RATE DIFFERENCES COMPLETE t~ =$ -$1.00 .'~ PARTIAL BY 2 ^ FINAL C~ ? PROGRESS TITLE Amount verified; correct for O ADVANCE (Signature or initials) Pursuant to authority vested in me, I certify that this voucher is correct and proper for payment. (Date) (Authoriz Gertifyi g Officer) 2 (Title) ACCOUNTING CLASSIFICATION STA 9 JUL t9 ~` (Da teb CHECK NUMBER ON TREASURER OF THE UNITED STATES CHECK NUMBER ON (Name of bank) m s CASH DATE PAYEE 3 . S - ~ 9. When stated In foreign currency, Insert name of currency. ~ PER 2. If the ability to certify and authority to approve are combined In one person, one Signature only is necessary; otherwise the approving officer will sign In the space provided, over his official title. 3. When a voucher Is recelpted in the name of a company or corporation, the name of the person TITLE writing the company or corporate name, as well as the capacity in which he signs, must appear. For example: "John Doe Company, per John Smith, Secretary", or "Treasurer", as the case may be. Sanitized Co A roved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05 : CIA-RDP72B00464R000100010007-7 -yo T Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 AEROJET-GENERAL CORPORATION AEROJETELECTROSYSTEMS COMPANY P. 0. BOX 296 AAZUSA., CALIFORNIA 91702 CONTRACTOR'S RELEASE Pursuant to the term of Contract No. AG 1103 and in consideration of the sum of Eighty-four thousand, nine-hundred ninety five and no/100 84, 995.00 which has been or is to be paid under the said contract to AEROJET-GENERAL CORPORATION, P. 0. BOX 296, AZUSA, CALIFORNIA, (hereinafter called the Contractor) or to its assignees, if any, the Contractor, upon payment of the said sum by the UNITED STATES OF AMERICA (hereinafter called the Government), does remise,release, and discharge the Government, its officer, agents and employees, of and from all liabilities, obligations, claims, and demands whatsoever under or arising from the said contract except : NONE 1. Specified claims in stated amounts or in estimated amounts where the amounts are not susceptible of exact statement by the Contractor, as follows: Contested Corporate Public/Community Relations Expense commencing the fiscal year ending November 30, 1966 and subsequent fiscal years; such Expense applicable to this contract is estimated to be 2. Claims, together with reasonable expenses incidental thereto, based upon the liabilities of the Contractor to third parties arising out of the performance of the said contract, which are not known to the Contractor on the date of the execution of this release and of which the Contractor gives notice in writing to the Contracting Officer not more than six (6) years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier. 3. Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable expenses incidental thereto, incurred by the Contractor under the provisions of the said contract relating to patents. The Contractor agrees, in connection with patent matters and with claims which are not released as set forth above, that it will comply with all of the provisions of the said contract, including without limitation those provisions relating to notification to the Contracting Officer and relating to the defense or prosecution of litigation. IN WITNESS WHEREOF, this relase has been executed this 30th day of June 19 71 - AEROJET-GENERAL CORPORATION AEROJET ELECTROSYSTEMS COMPANY (Contractor) ,7 r STAT Title Senior o act_Adm-nistrator CERTIFICATE certify that I am the of the corporation named as Contractor in the foregoing release; that who signed said release on behalf of the Contractor was then of said corporation; that said release was duly signed for and in behalf of said corporation by authority of its governing body and is within the scope of its corporate powers. (CORPORATE SEAL) Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Pro. Ile Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 .1 -Y~galc a- hop-, Do o =/)-sfd d Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7 Sanitized Copy Approved for Release 2010/05/05: CIA-RDP72B00464R000100010007-7