NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

S-22 INFRARED SYSTEM PROGRESS REPORT NO. 26

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP72B00464R000100060014-4
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 13, 2010
Sequence Number: 
14
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP72B00464R000100060014-4.pdf129.85 KB
Body: 
Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 1 Page I of 3 nSA S_22 INFRARED SYSTEM PROGRESS REPORT NO. 26 INTRODUCTION PROGRAM STATUS Technical Conferences System Integration Development Status PROBLEM AREAS Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 Page 2 of 3 INTRODUCTION Two Model S-22 Infrared Scanners have been developed and are to be retrofitted with new analog electronic modules prior to system evaluation. The following report summarizes the monthly progress from 15 June to 15 July 1967. The only work in process at this time is the production of 100 electronic modules for retrofit. These units, as previously reported, have been rescheduled for delivery due to slippages in production and a higher priority companion program. Delivery of the units is scheduled for early September and integration of the modules into the S-22 system will be done on a non-interference basis with the above- mentioned higher priority program. II PROGRAM STATUS A. Technical Conferences Clay visited John and Al, 28 June 1967; subject: Program Review. B. System Integration No work was done in this area. C. Development Status 1. Thermoelectric Cooler Delivery of this item has been rescheduled to 1 August. Some fabrication problems were experienced and in ad- dition, the vendor shut down work for vacations. This is not a pacing item. Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 Page 3 of 3 2. Analog Electronic Modules The following Table presents the current status in the design and production of the required 100 modules. The problems experienced in this area are as previously reported: poor quality in deposition masks and a low yield in the selection of low noise devices for the pre- amplifier. III PROBLEM AREAS A delivery slippage in excess of 12 weeks exists as a result of poor masks and yielding to a higher priority companion program. ANALOG MICROELECTRONIC STATUS PreAmp-Filter AGC Threshold Circuit Design (C) Complete (C) Complete (C) Complete Package Design (c) (C) (C) Worse Case Analysis (C) (C) (C) Mask Fabrication (C) (C) (C) Deposition & Test 55% 48% 80% Component Delivery 100% 100% 100% Assembly 55% 42% 51% V Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4 O CO1".1'l;AC'C'Oit M0N'i'X[ FINANCIAL 10;P0R'J' "; U1 Nt)WAl3is" `. PJC CO1VTRA.C'i' I. Contr,ct~ Number FH-2510 2. Financi.al Status as of 7/2/67 5? Task Order No. (If Any) (Date) From 5/18/65 To 6/30/67 ],::,tirnf.~tcd Percent;-1,';c of Work. Corr p:feted ;,~1/irrstcd Contract CorrrPletiorl .)atcc (Depends onW-80') 6. Contractor Z'7.>nnrd Cumulative Lx2enditurc;-, to Data Cumulative Ac tua:l_ lb crlci:iturus to Date 8. Contractor l J,cannc d Outr.,ttand .r~jJ Caroni Lric rlts Actual Out?tandin Corn iitmcnte 10. Cumulative Planned T;~ ~crlditure and Outsttanding Cornmitmo,lts to Date (6 -i- ~)) 11. Cumulative Actual Expenditureo and0utstanding Commitments to Date (7. + 9) Variance - L incL 10 - 11 (+ or -) 13. TE;7t:'irrubbe to Complete; Contract :Ll+. Total E,jtirnc ted Amount ite:luirod to Perform Contract (7 1.:1) 15. Contract Fur ds Allocated 16. Variance - Liner: l - 14 (+ or -) 17. Additional Amount for Work Propocod, But not yet Authorized -111154 6-7 $ 75Z, 45Z $ 714.909 -0- $ 752,432 $ 714,909 $ + 37,523 $ 74; 000 $ 788, 909 $ 839, 735 $ + 50, 826. -0- Sanitized Copy Approved for Release 2010/09/13: CIA-RDP72B00464R000100060014-4