CJC-66010

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP72B00464R000100100001-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
57
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 17, 2010
Sequence Number: 
1
Case Number: 
Content Type: 
SUMMARY
File: 
AttachmentSize
PDF icon CIA-RDP72B00464R000100100001-3.pdf1.35 MB
Body: 
Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 SUMMARY - RETROFIT AND PRODUCTION - Redesign, Test, Retro- fit Two Units; Acceptance Test Two Units; Environmental Test One Unit; Produce 10 Units Hour s Rate Amount R&D Overhead Pool: Salaried Hourly 31, 268 5.69 178,052 69,684 3.32 231,109 Total Labor $ 409, 161 R&D Overhead @ 135% 552, 367 Materials $437,974 Material Burden @ 14. 9% 65,258 Total - Materials Including Burden 503, 232 Subtotal $1,464,760 Gen. & Adm. Expense @ 7.8% 114, 251 $1,579,012 ad '~ /57_` ?., Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Production Only Hours Rate Amount R&D Overhead Pool: Salaried Hourly 23, 532 5.64 132, 700 62, 402 3.33 207,588 Total Labor $ 340, 288 R&D Overhead @ 135% 459, 389 Materials $342, 426 Material Burden @ 14. 9% 51, 021 Total Materials Incl. Burden 393, 447 Subtotal $1,193,124 Gen. & Adm. At 7.8% 93, 064 $1, 286,187 lay (0Ii-- Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 SUMMARY - Develop, Test, and Produce 250 Flip Chip Amplifiers and 1100 for 10 Production Units Hour s Rate Amount R&D Overhead Pool: Salaried 8,037 Hourly 22, 524 5.84 46,936 2.93 65,995 Total Labor $112, 931 R&D Overhead @ 135% 152,457 Materials $129, 900 Material Burden @ 14. 9% 19,355 Total Materials Incl. Burden 149, 255 Subtotal $414,643 Gen. & Adm. Expense @ 7.81/c 32,342 Total Estimated Cost $446, 985 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Design, Test and Set Up (One Time Charge) Hours Rate Amount R&D Overhead Pool: Salaried Hourly 1, 132 5.84 6,611 1,924 2.93 5,637 $12, 248 R&D Overhead @ 135% 16, 534 $18, 300 Material Burden @ 14. 9% 2, 727 Total Materials Incl. Burden 21, 027 $49, 809 Gen. & Adm. Expense @ 7.8% 3, 885 Total Estimated Cost $53, 694 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C CJC-66010 Manufacture 1, 350 Flip Chip Amplifiers (10 Production and\2 Retrofit) H our s Rate Amount R&D Overhead Pool: Salaried Hourly 6, 905 5.84 40, 325 20,600 2.93 60,358 Total Labor $100,683 R&D Overhead @ 135% 135,922 Materials $111, 600 Materials Burden @ 14. 9% 16, 628 Total Materials Incl. Burden 128, 228 Subtotal $364,833 Gen. & Adm. Expense @ 7.8% 28, 457 Total Estimated Cost $393,290 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C 4-A-2. 1 Manufacture 1, 100 Flip Chip Amplifiers (10 Production Units) Hours Rate Amount -$- -$- R&D Overhead Pool: Salaried 6,102 Hourly 18,320 5.84 35,636 2.93 53,678 Total Labor $ 89,314 R&D Overhead @ 135%o 120, 574 Materials $88,484 Materials Burde @ 14. 9% 13, 184 Total Materials Incl. Burden 101,668 Subtotal $311,556 Gen. & Adm. Expense @ 7.80/c 24, 301 Total Estimated Cost $335, 857 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C 4-B Retrofit Two Units (1-B, 1-C, 1-D, 1-E, 1-F, 1-G, 1-H, 1-I, 1-J, 1-K) Hour s Rate Amount R&D Overhead Pool: Salaried 5,801 Hourly 3,078 5.87 34, 052 3.64 11, 204 Total Labor $ 45, 256 R&D Overhead @ 135% 61,096 Materials $54, 132 Materials Burden @ 14.9% 8,066 Total Materials Incl. Burden 62, 198 Subtotal $168,550 Gen. & A.dm. Expense @ 7. 8% 13,147 Total Estimated Cost $181, 697 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Fabrication, Assembly, Electrical Test, Optical & Mechanical Assembly Hour s Rate Amount R&D Overhead Pool: Salaried H our ly 9, 282 5.37 49,844 37,566 3.47 130,354 Total Labor $180,198 R&D Overhead @ 135% 243, 267 Materials $252, 182 Materials Burden @ 14. 9% 37, 575 Total Materials Incl. Burden 289,757 $713,222 Gen. & Adm. Expense @ 7.8% 55, 631 Total Estimated Cost $768, 853 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Quality Control and Inspection R&D Overhead Pool: Salaried Hourly Hours Rate Amount 510 5.20 2, 652 3,054 3.67 11, 208 4-D $13, 860 R&D Overhead @ 135% 18,711 Gen. & Adm. Expense @ 7.8% $32, 571 2, 540 Total Estimated Cost $35,111 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C CJC-66010 Program Management Hour s Rate Amount -$- -$- R&D Overhead Pool: Salaried 5,300 5.87 31,111 Hourly 1,008 3.64 3,669 Total Labor $34, 780 R&D Overhead @ 135% 46, 953 $81, 733 Gen. & Adm. Expense @ 7-81/c 6, 375 $88, 108 1-5 -r-r*\ .~I -ea 106W ~- Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Special Test Equipment and Tooling Hours Rate Amount -$- -$- R&D Overhead Pool: Salaried 553 Hourly 1,488 5.37 2, 862 3.47 5, 163 Total Labor $ 8, 025 R&D Overhead @ 135% 10,834 Materials $1,760 Material Burden @ 14. 9% 262 Total Materials Incl. Burden 2, 022 Subtotal $20,881 Gen. & Adm. Expense @ 7.80/c 1, 629 Total Estimated Cost $22, 510 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C CJC-66010 Upgrade Drawings and Manuals R&D Overhead Pool: Salaried Hourly Hours Rate Amount 1, 805 5.87 10, 595 966 3.64 3, 516 Total Labor R&D Overhead @ 135% Gen. &Adm. Expense @ 7. 8% Total Estimated Cost 19, 050 $33, 161 2, 587 $35,748 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 = Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 SUMMARY - Redesign, Test, Retrofit Two Units; Acceptance Test Two Units; Environmental Test One Unit; Produce Ten Units Hour s Rate Amount R&D Overhead Pool: Salaried Hourly 28, 635 5.63 161,076 41,777 2.88 137,791 Total Labor $ 298, 867 R&D Overhead @ 135% 403,470 Materials $435, 602 Material Burden @ 14. 9% 64, 905 Total Materials ;Incl. Burden 500, 507 Subtotal $1, 202, 844 Gen. & Adm. Expense @ 7. 8% 93, 822 Total Estimated Cost $1,296,666 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Production Only - 10 Production Units (5-A-2. 1, 5-C, 5-D, 5-E, 5-F, 5-G, 5-H, 5-I, 5-J, 5-K) R&D Overhead Pool: Hour s Rate Amount Salaried Hourly 23, 673 5.58 132, 023 34,658 2.83 115,477 Total Labor $ 247, 500 R&D Overhead @ 135% 334, 125 $400, 100 Material Burden @ 14. 9% 59, 615 Total Materials Incl. Burden 459, 715 $1,041,340 Gen. & A.dm. Expense @ 7.8% 81, 225 l Estimated Cost T t $1,122, 565 o a ~rz,zs6 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 S-22 5-A Develop, Test, and Produce 135 Flip Chip Amplifiers and 480 for 10 Production Units H ours Rate . Amount R&D Overhead Pool: Salaried 7,332 Hourly 16,069 5.84 42,819 2.93 47,082 Total Labor $ 89,901 R&D Overhead @ 135% 121,366 Materials $91, 202 Material Burden @ 14. 9% 13, 590 Total Materials Incl. Burden 104, 792 Subtotal $316,059 Gen. & Adm. Expense @ 7.81/c 24, 653 Total Estimated Cost $340, 712 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 5-22 5-A-1 Design, Test, and Set-Up (One Time Charge) Hours Rate Amount R&D Overhead Pool: Salaried 1,132 Hourly 1, 924 5.84 6,611 2.93 5,637 Total Labor $12,248 R&D Overhead @ 135% 16, 534 Materials $18, 300 Material Burden @ 14. 9% 2,727 Total Materials Incl. Burden 21, 027 Subtotal $49, 809 Gen. & Adm. Expense @ 7.8% 3, 885 Total Estimated Cost $53, 694 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CjC-66010 Manufacture 615 Flip Chip Amplifiers (10 Production and 2 retrofit) H our s Rate Amount R&D Overhead Pool: Salaried Hourly 6, 200 5.84 36, 208 14,145 2. 93 41,445 Total Labor $ 77,653 R&D Overhead @ 135% 104,832 Materials $72, 902 Material Burden @ 14. 9% 10, 862 Total Materials Incl. Burden 83, 764 Subtotal $266,Z49 Gen. & Adm. Expense @ 7. 8% 20, 767 Total Estimated Cost $287, 016 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010. Manufacture 480 Flip Chip Amplifiers - 10 Production Units H our s Rate Amount R&D Overhead Pool: Salaried 4,860 5.84 Hourly 11,000 2.93 28, 382 32,230 Total Labor $60, 612 R&D Overhead @ 135% 81, 826 Materials $56, 900 Material Burden @ 14. 9% 8, 478 Total Materials Incl. Burden 65, 378 Subtotal $207, 816 Gen. & Adm. Expense @ 7. 8% 16,210 Total Estimated Cost $224, 026 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 S-22 5-B Retrofit Two Units (2-B + 2-C 4 2-D) H ours Rate Amount R&D Overhead Pool: Salaried 1,730 5.87 10,155 Hourly 650 3.64 2,366 Total Labor R&D Overhead @ 135% $1, 200 $12, 521 16, 903 Material Burden @ 14. 9% 179 Total Materials Incl. Burden 1, 379 Subtotal $30, 803 Gen. & Adm. Expense @ 7. 8% 2, 402 Total Estimated Cost $33, 205 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Fabrication - Mechanical - Optical - Optical Coating H ours Rate Amount R&D Overhead Pool: Salaried Hourly 1, 533 5.37 8, 232 9,244 3.47 32, 076 Total Labor $ 40,308 R&D Overhead @ 135% 54, 416 Materials $52, 850 Material Burden @ 14. 9% 7, 874 Total Materials Incl. Burden 60, 724 Subtotal $155,448 Gen. & Adm. Expense @ 7.8%, 12, 125 Total Estimated Cost $167, 573 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 R&D Overhead Pool: Salaried Hourly Hours Rate Amount 168 5.87 986 16 3.64 58 $1, 044 R&D Overhead @ 135% 1,409 Gen. & Adm. Expense @ 7-81/c $2,453 Total Estimated Cost $2, 644 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Electrical Fabrication and Assembly Hours Rate Amount R&D Overhead Pool: Salaried Hourly 7, 352 5.37 39,480 7,760 3.47 26, 927 total Labor $ 66,407 R&D Overhead @ 135% 89, 649 Materials $48, 600 Material Burden @ 14. 90%c 7, 241 Total Materials Incl. Burden 55, 841 Subtotal $211, 897 Gen. &A. dm. Expense @ 7. 8% 16, 528 Total Estimated Cost $228, 425 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Mechanical and Optical Alignment and Check Out Hour s Rate Amount R&D Overhead Pool: Salaried 1,880 5.87 11, 036 Hourly 1, 290 3.64 4,696 Total Labor $15, 732 R&D Overhead @ 135% 21,238 $36-$970 Gen. & Adm. Expense @ 7.8% 2, 884 Total Estimated Cost $39, 854 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 System Alignment and Test Hour s Rate Amount R&D Overhead Pool: Salaried 2, 140 5.87 12, 567 Hourly 2, 140 3.64 7,747 $20, 314 R&D Overhead @ 135% 27, 424 $47, 738 Gen. & Adm. Expense @ 7. 8% 3, 724 Total Estimated Cost $51,462 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Quality Control and Inspection H ours Rate Amount -$- -$- R&D Overhead Pool: Salaried 440 5.20 229 Hourly 2,200 3.67 8,074 R&D Overhead @ 135% $ 8, 303 11,209 $19, 512 & Adm. Expense @ 7. Gen 8% 1, 522 . Total Estimated Cost $21, 034 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 . Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 S-22 5-I Detector Arrays - Power Supplies and Coolers - Pitch Encoder - Servo Amplifiers - Toger and Tack Materials Material Burden @ 14. 9% $219, 750 32, 743 Total Materials Incl. Burden $252, 493 Gen. & Adm. Expense @ 7. 8% 19,694 Total Estimated Cost $272, 187 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 S-22 5-J CJC-66010 Program Management Hour s Rate Amount R&D Overhead Pool: Salaried 5, 300 5.87 31,111 Hourly 1,008 3.64 3,669 Total Labor $34, 780 R&D Overhead @ 135% 46, 953 Subtotal $81,733 Gen. & Adm. Expense @ 7. 8% 6, 375 Total Estimated Cost $88, 108 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 10% Spares Excluding Microelectronics and Detectors Which Have Spares Materials Material Burden @ 14. 9% $22, 000 3,278 Total Materials Incl. Burden $25, 278 Gen. & Adm. Expense @ 7. 8% 1, 972 Total Estimated Cost $27, 250 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 ? . Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Update Drawings and Manuals H our s Rate Amount R&D Overhead Pool: Salaried 760 5.87 4,461 Hourly 1,400 3.64 5,096 Total Labor $ 9, 557 R&D overhead @ 135% 12, 902 Subtotal $22, 459 Gen. & A.dm. Expense @ 7. 8% 1, 752 Total Estimated Cost $24, 211 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C 6. SUMMARY - Redesign, Test, Retrofit Two Units; Acceptance Test Two Units; Environmental Test One Unit; Produce Ten Units (Combined with S-22) Hours Rate Amount R&D Overhead Pool: Salaried 29, 392 Hourly 66,279 5.69 167,096 3.34 221,133 Total Labor $ 388, 229 R&D Overhead @ 135% 524, 109 Materials $421, 744 Material Burden @ 14. 9% 62, 840 Total Materials Incl. Burden 484, 584 Subtotal $1, 396, 886 Gen. & Adm. Expense @ 7. 8% 108, 957 $1,505,843 /Sa 5F' Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W8 0C 6. Production Only - Combined with S-22 Hour s Rate Amount -$- -$- R&D Overhead Pool: Salaried 22,357 5.63 125, 838 Hourly 60,311 3.34 201,461 Total Labor $ 327, 299 R&D Overhead @ 135% 441, 854 Materials $323, 607 Materials Burden @ 14. 9% 48, 217 Total Materials Incl. Burden Subtotal $1, Gen. & Adm. Expense @ 7.8% $1, 371, 824 140, 977 88, 996 229, 973 /?-a ""2 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C 6-A Develop, Test, and Produce X5`0` Flip Chip Amplifiers Plus 1100 for 10 Production Units (Combined with S-22) Hour s Rate Amount R&D Overhead Pool: Salaried 6,161 Hourly 19,119 5.84 35,980 2.93 56, 019 Total Labor $ 91,999 R&D Overhead @ 135% 124,199 Materials $113, 670 Materials Burden @ 14.9% 16, 937 Total Materials Incl. Burden 130, 607 Subtotal $346, 805 Gen. & Adm. Expense @ 7. 8% 27,051 Total Estimated Cost $373, 856 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Design, Test, and Set-Up (One Time Charge) (Split 50/50 with S-22) Hours Rate Amount R&D Overhead Pool: Salaried Hourly 566 5.84 3,305 962 2.93 2, 819 Total Labor $ 6, 124 R&D Overhead @ 135% 8, 267 $9, 150 Materials Burden @ 14.9% 1, 363 Total Materials Incl. Burden 10, 513 Subtotal $24, 904 Gen. & Adm. Expense @ 7.8% 1, 943 Total Estimated Cost $26, 847 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Manufacture 1, 350 Flip Chip Amplifiers (10 Production Plus Two Retrofit Units) (Combined with S-22) Hour s Rate Amount R&D Overhead Pool: Salaried H our ly 5, 595 5.84 32,675 18,157 2.93 53, 200 Total Labor $85, 875 R&D Overhead @ 135% 115,931 Materials $104, 520 Material Burden @ 14. 9% 15, 573 Total Materials Incl. Burden 120, 093 Subtotal $321, 899 Gen. & Adm. Expense @ 7. 8% 25, 108 Total Estimated Cost $347, 007 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C 6-A-2.1 Manufacture 1,100 Flip Chip Amplifiers (10 Production Units) (Combined with S-22) Hours Rate Amount R&D Overhead Pool: Salaried 4,927 Hourly 16,229 5.84 28, 774 2.93 47,551 Total Labor $ 76, 325 R&D Overhead @ 135% 103, 039 Materials $69,665 Materials Burden @ 14. 9% 10, 380 Total Materials Incl. Burden 80, 045 Subtotal $259,409 Gen. & Adm. Expense @ 7. 8% 20, 234 Total Estimated Cost $279, 643 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Retrofit Two Units (1-B, 1-C, 1-D, 1-E, 1-F, 1-G, 1-H, 1-I, 1-J, 1-K) H our s Rate Amount R&D Overhead Pool: Salaried Hourly 5,801 5.87 34,052 3, 078 3.64 11, 204 Total Labor $ 45,256 R&D Overhead @ 135% 61, 096 Materials $54, 132 Materials Burden @ 14. 9% 8, 066 Total Materials Incl. Burden 62, 198 Subtotal $168,550 Gen. & Adm. Expense @ 7.85c 13, 147 Total Estimated Cost $181, 697 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 W80C CJC-66010 Manufacturing Costs (4-C, 4-D, 4-E, 4-F, 4-G) Ten Production Units Hours Rate Amount R&D Overhead Pool: Salaried Hourly 17,430 5.57 97,064 44,082 3.49 153,910 Total Labor $250, 974 R&D Overhead @ 135% 338,815 Materials $253,942 Material Burden @ 14. 9% 37, 837 Total Materials Incl. Burden 291, 779 Subtotal $881, 568 Gen. & Adm. Expense @ 7. 8% 68, 762 Total Estimated Cost $950, 330 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Total Labor $240, 032 Redesign, Test, Retrofit, Two Units; Acceptance Test Two Units; Environmental Test One Unit; Produce Ten Units (Combined with W80C) H ours Rate Amount R&D Overhead Pool Salaried 24, 624 5.59 137,651 Hourly 35,613 2.87 102, 381 R&D Overhead @ 135% $405, 030 Material Burden @ 14. 9% 60, 349 Total Materials Incl. Burden 465, 379 Gen. & Adm. Expense @ 7.8% 324, 043 $1, 029, 454 80, Z97 Total Estimated Cost $1,109,751_ //a?? Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Production Only Hours Rate Amount R&D Overhead Pool: Salaried -7?2, fiii00 5.56 122, 276 Hourly 33,052 2.86 94,415 R&D Overhead @ 135% Material Burden @ 14. 9% $377, 513 56, 249 Total Materials Incl. Burden Gen. & Adm. Expense @ 7.8% Total Estimated Cost $ 216, 691 292, 533 433,762 $ 942,986 73, 553 $1, 016, 539 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 SUMMARY - Develop, Test, and Produce 135 Flip Chip Amplifiers Plus 480 for 10 Production Units (Combined with W80C) H our s Rate Amount R&D Overhead Pool: Salaried Hourly 3, 321 5.84 19, 394 9,905 2.93 29, 022 Total Labor $ 48,416 R&D Overhead @ 135% 65, 362 Materials $60,630 Materials Burden @ 14.9% 9,034 Total Materials Incl. Burden 69, 664 Subtotal $183, 442 Gen. & Adm. Expense @ 7. 8% 14, 308 Total Estimated Cost $197, 750 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 6-A-1 Design, Test, and Set-Up (One Time Charge) (Split 50/50 with W80C) Hour s Rate Amount R&D Overhead Pool: Salaried Hourly 566 5.84 3,305 962 2.93 2, 819 Total Labor $ 6, 124 R&D Overhead @ 135% 8,267 $9, 150 Material Burden @ 14. 9% 1, 363 Total Material Incl. Burden 10, 513 Subtotal $24,904 Gen. & Adm. Expense @ 7.8% 1,943 Total Estimated Cost $26, 847 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Manufacture 6.15 Flip Chip Amplifiers (10 Production plus 2 Retrofits) Hours Rate Amount R&D Overhead Pool: Salaried Hourly 2,755 5.84 16,089 8,943 2.93 26,203 Total Labor $ 42, 292 R&D Overhead @ 135% 57, 094 Materials $51,480 Material Burden @ 14.9% 7,671 Total Materials Including Burden 59, 151 Subtotal $158, 537 Gen. & Adm. At 7. 8% 12,366 Total Estimated Cost $170, 903 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 5-22 6-A.-2.1 Manufacture 480 Flip Chip Amplifiers (10 Production Units) Hour s Rate Amount R&D Overhead Pool: Salaried Hourly 2, 427 7,994 5.84 2.93 14,174 23, 422 Total Labor $ 37, 596 R&D Overhead @ 135% 50,755 Materials $34, 313 Material Burden @ 14. 9% 5,113 Total Materials Incl. Burden 39,426 Subtotal $127,777 Gen. & Administrative @ 7. 8% 9,967 Total Estimated Cost $137,744 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Retrofit Two Units (2-B + 2-C + 2-D) Hours Rate Amount R&D Overhead Pool: Salaried 1,730 5.87 10,155 Hourly 650 3.64 2, 366 Total Labor $12, 521 R&D Overhead @ 135% 16, 903 Material Burden @ 14. 9% $1, 200 Total Materials Incl. Burden 1,379 Subtotal $30, 803 Gen. & Adm. Expense @ 7.8% 2,402 Total Estimated Cost $33, 205 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 CJC-66010 Manufacturing Costs (5-C, 5-D, 5-E, 5-F, 5-G, 5-H, 5-I, 5-J, 5-K, 5-LO Ten Production Units Hour s Rate Amount R&D Overhead Pool: Salaried Hourly 19,573 25,058 5.52 2.83 108, 102 70,993 Total Labor $179,095 R&D Overhead @ 135% 241, 778 $343, 200 Material Burden @ 14. 9% 51,137 Total Material Incl. Burden 394, 337 Subtotal $815, 210 Gen. & Adm. Expense @ 7.80/c 63,586 Total Estimated Cost $878,796 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 SUMMARY - J218 Test Equipment - 4 Units Hour s Rate Amount -$_ -$- R&D Overhead Pool: Salaried 853 5.87 5,007 Hourly 1, 584 3.64 5,766 Total Labor $ 10,773 R&D Overhead @ 135% 14,543 Materials $62, 274 Materials Burden @ 14. 9% 9,279 Total Materials Incl. Burden 71, 553 $ 96,869 Gen. & Adm. Expense @ 7. 8% 7, 556 Total Estimated Cost $104,425 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Mobile Test Cart (Fully Instrumented) Hour s Rate Amount R&D Overhead Pool: Salaried 597 5.87 3,504 Hourly 922 3.64 3, 356 Total Labor $ 6, 860 R&D Overhead @ 135% 9,261 Materials $39,567 Material Burden @ 14. 9% 5, 895 Total Materials Incl. Burden 45,462 Subtotal $61, 583 Gen. & Adm. Expense @ 7.8% 4, 803 Total Estimated Cost $66, 386 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 H our s Rate Amount -$- -$- R&D Overhead Pool: Salaried 256 5.87 1,502 Hourly 662 3.64 2, 410 Total Labor $ 3,912 R&D Overhead @ 135% 5, 281 Materials $10, 327 Material Burden @ 14. 9% 1, 539 Total Materials Incl. Burden 11,866 Subtotal $21, 059 Gen. & Adm. Expense @ 7.80/c 1, 642 Total Estimated Cost $22, 701 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 ? Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Standard Test Equipment Materials Material Burden @ 14. 9% $12, 380 1,846 Total Materials Incl. Burden $14, 226 Gen. & Adm. Expense @ 7. 8% 1,110 Total Estimated Cost $15, 336 I To Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 F -PI, Y', 0~1 rLc vC{Su Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R0001001000001-#3 T-4k ca,,2~i f,} ?.. Ad si+ e 2A c ar -t cXV ev - L . Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 71 r'cL) rQ /0. lF Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 QSSew+ ~pU?~+' 4 e~r.Qt4Cau P ! f ~j . ] ~l, i. ~,w1~~inT'j~f'/''?t tw. ~~~.14~[~~ ~.~/~/ I 1V fa l4r 7 J ,.7 IIfVV~~.' . 11 j wr~'11 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 t,pwc Fkt4 f om4 s4cOt /o/ 6 216 9L Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 a4 0(e- `Pr-JV ,LO g16C , ')`ai1d 6 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 1. C)d Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 V\ (i 1 fa (V 'D 3 ! Imo. Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 4. 7-t- (-"ec-< ,~,,", f~,5/N(j Bc A Jn1 TE 6R.-4 r,c 4 7E ~StfS r ' -i 5 ysT 5 y's r 5Y's v.N,c- LF ,?,z.Z TcSTT t5 s7 2 2 A/Gi ,' z~ Sy3T,,,.s ~r- ~,'IIC CTlf ~G /~Sf //)e iv r7t-'l~ i ,& TrzfF,_ - E114-in, No %C r Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 1 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 S7A TC".~>~:. ,v T ~a C: c The com ens listed below represent changes and' additions enclosure (2) i 19 January 196k. (Doc. #188-0) dated STAT During visit to Aerojet General on 7 February STAT 1967, the revisions to the s ~tement of work were coordinated with .of Aero'et. The revisions were approved, STAT by and he stated\,that should include them in STATAT the final' statement of work. The "signed off" specification for. the W-80C should also be included as part of%the statement of work. A. Page 1, I, Introduction (line 4) 't. . . and maintainability, in accordance with the provisions of the document "Specification for Passive IR Warning Device (W-80C)" approved on 10 January 1967 by the contractor. " B. Page 2, II, Work Items, paragraph 1(b) Change to Read: b) "Manufacture sufficient for two (2) W-80C units plus operational spares in a minimum quantity of 10 modules. C. Page 2, paragraph 2 Add: d) Servo subsystem to-ttie proposed ' State ent of Work W-80C'Retrofit Program, " called Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3 Page 2 D. Page 3, paragraph 5 Change to Read: thermoelectric coolers capable of assuring compliance with paragraph 3.1.7. and paragraph 3. 5. of the document "Specification for Passive IR Warning Device (W-80C). " E. Page 3, paragraph 6 Add: d) Elevation scan e) Cryogenic subsystem F. Page 4, paragraph 12 12. Software items (quantity in accordance with "Specification for Passive IR Warning Device (W-80C)". Appendix B) as follows:. G. Page 4, Paragraph 12 In subparagraphs ''e" "f", ''g'l, "h'', "i" and "k", delete the document quantities. H. Page 5 (new paragraph) 13. Determination of Probability of Detection and Detection Range: Probability of detection and determination of detection range shall be determined by testing of the W-80C at the customer's simulation facility. Parameters specified in paragraphs 3. 2. , 3. 3., 3. 4., 3. 5. , and 3. 6. 4. of the document "Specification for Passive iR Warning Device (W-80C)" shall be used. Sanitized Copy Approved for Release 2010/05/17: CIA-RDP72B00464R000100100001-3