ECP GR-35, CONTRACT IP-2264
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP72B00464R000400070067-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 14, 2016
Document Release Date:
October 21, 2002
Sequence Number:
67
Case Number:
Publication Date:
December 22, 1965
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 121.77 KB |
Body:
Approved For Releay2002/10/25 : CIA-RDP72BOO464ROOQ070067-2
22 December 1965
STAT
Subject: ECP GR-35, Contract LP-2264
Dear Chuck,
Item one of this ECP is disapproved by the SPO.
We have no evidence that the present control design for the
multiplex switch contributes to excessive failures of these
switches. There is one advantage, howover, to the present
design in that the multiplex switch. operation can be checked
without having to turn on the
Item two of this change, re-routing of J-Box wiring
is required and approved. We understand that Nat considers this
a contractor responsible change. Accordingly, Nat should be
requested to submit a revised ECP to cover this no cost portion
of the change, unless you think this unnecessary.
Re gards
STATINTL Copy:
STAT
STAT
STATINTL
Approved For Release 2002/10/25 : CIA-RDP72B00464R000400070067-2
M1
Approved For Rele 2002/10/25 : O'pyY 67-2
AKP-I-1.980
8 December 1965
ECP GR-35, 7 copies 11-12-65
N-R Agreement, Serial G-83 of 10-7-65
N-R Agreement, Serial G-158 of 12-6-65
ADP Discrepancy Report No. 87, 10-4-65
Submitted for your approval is ECP GR-35, dated 11-12-65. We are proceed-
ing with this change prior to change proposal approval. The Production
units will be changed as indicated by GR-35.
The eight (8) Prototype units will be retrofitted by GR technicians.
The change to be made to the prototype units include a new relay bracket
P/N 531A620-099-1, which will be used in a 53lA620-028-101 Relay
Assembly that can be mounted into the J-Box on existing mounting hardware.
The total cost for the eight (8) prototype units will be $1603.90 which
includes $1,178.56. engineering costs. Kit costs will be $53.16 per unit.
No costs have been included for providing that portion of the change
associated with the Man 28V DC signal to the Synchronizer in the Programmed
mode.
N/mj
encls.
Approved For Release 2002/10/25 : CIA-RDP72B00464R000400070067-2
11
) r1j, It,/
_ ISPOSITION OF SPARES AFFECTED:
STATI Spares
L
to be
changed
to
latesi,
configu
^ation.
PPB to be changed b change notice to PSO.
F
e
lease
2002/10/25 :
CIA-
RDP72B004W000400070067-2
Approved
TAT
STAT
S I I NTL
E-108
Approved or Release 2002/10/25. 000400070 OF
GA - 531
ENGINEERING STUDY []
G R - 35
CHANGE PROPOSAL El
DATE 11_12-65
AFFECTS: GA531A 0
NAME OF MAJOR COMPONENT
PART OR LOWEST SUBASSEMBLY
PART NO.
System Junction Box
System Junction Box
MODEL OR TYPE
531A620-001-105
No P/N Change
TITLE OF PROPOSAL: Improve control of multiplex switch and provide Man-Prog Mode
compaLability for the Synchronizer.
NATURE OF PROPOSAL:
1. Install 6K12 relay, connector and wiring, and reroute wiring to permit
operation of multiplex switch.
2. Reroute wiring in J-Box to provide circuit to Synchronizer for "Man 28J DC
3. A Mod. No. will be assigned with the incorporation of this change.
REASON FOR PROPOSAL
1. Conserve the operating life of the slave multiplex switch and to
permit slave multiplex switch only when the =is switched on. Ref:
ADP Eng. Discrepancy Report No. 87.
2. Provid; a "Man 2811 DC" signal to the Synchronizer Unit in the
Programmed Mode as well as the present Manual Mode.
REF: N/R No. G-83.
ESTIMATED COST AND TIME INVOLVED:
ES
ADDITIONAL FUNDING REQUIRED:
CP
ESTIMATED COST FOR KITS OR PARTS: $33.23
ADDITIONAL FUNDING REQUIRED: $1154,.7.77 (includes $3,783.3L Engineering)
ITEMS AFFECTED BY PROPOSAL: Units S/N 6051-9 thru -20 will be retrofitted.
Production units S/N 6051 and Subs in line.
SAFETY
MISSION
EFFEC-
PERFORM-
OPERATING
INTER-
CHANGE-
WEIGHT OR
WEIGHT
TOOLS AND
SUPPORT
MAINTE-
NANCE
SERVICE
FLIGHT
MAINTE
NANCE
^
TIVENESS
^
ANCE
PROCEDURE
ABILITY
BALAND ANCE
EQUIPMENT
PROC UR
E LIFE
MANUAL
MANUAL
^
LJ
^
1:1
El
El
11
In
ESTIMATED MAN HOURS REQUIRED TO ACCOMPLISH CHANGE IN FIELD:
8 hours per unit rework time.
SOURCE OF PARTS FOR KIT: GR
6
AVAILABILITY
WEEKS AFTER APPROVAL
INi
L'