EVALUATION REVIEW OF(Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP72B00464R000400090027-4
Release Decision: 
RIFPUB
Original Classification: 
K
Document Page Count: 
6
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 13, 2010
Sequence Number: 
27
Case Number: 
Publication Date: 
November 12, 1965
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP72B00464R000400090027-4.pdf253.48 KB
Body: 
DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON 25, D.C. REPLY TO ATTN OF: Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 V OSA-4300-65 #1723 REPLY TO: Audit Liaison Office P. 0. Box 8155 S. W. Station Washington, D. C. 12 November 1965 SUBJECT: Evaluation Review of ECP-2 Under Contract AF 33(657)-12846 Airborne Instruments Laboratory Deer Park, New York TO Contracting Officer REF: : AIL Proposal ECP #1940-2, dated 22 October 1965 1. A review has been made, to the extent deemed necessary of the contractor's cost proposal for multiplixer switches. This review consisted of an examination of the underlying data in support of proposed labor rates, overhead rates, material pricing, travel and other direct costs. The direct labor hours, material requirements, the necessity for the proposed travel and overtime hours, are referred to for evaluation by a technical representative. 2. A summary of the contractor's proposal by element of cost and the auditor's recommendations are as follows: Per Contractor's Pro osal Auditor's Recommended Reduction Ref. Notes Direct Labor - Engineering 3, 7~ 3 -0- a Direct Labor - Manufacturing 173882 -0- a Engineering Burden 104% 45,628 878 b Manufacturing Burden 72% 13,233 536 b Raw Materials and Purchased Parts 24,295 2,209 c Travel and Subsistance 2,737 -0- d Overtime Premium 1,918 -0- e Packaging and Shipping l40 ?0- f Subtotal $1797-07 3, 62-3 G & A 7.5% 11 228 418 b Total Cost Ti 0 ,~ Fee Re u t d q es e 8% 12 875 Total Proposal 173 09 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Ref. Notes: a. Direct Labor: For the purpose of this report only, the auditor accepts the hourly labor rates used to extend the estimated labor hours. A comparison was made of the.proposed composite rates used in each labor class with the actual incurred to date rates of the 19411942 programs. The subject effort will be performed by the same personnel. This com- parison ascertained the reasonableness of the proposed hourly rates. Attached as Exhibit A. is the contractor's breakdown of the direct labor hours by class of labor and effort, which is offered as a guide for evaluating the estimated labor hours by a qualified tachnical representative. b. Burdens and G & A: The auditor questions the contractor's proposed burdens and G & A rates as excessive. Based on an analysis of the current year book rates (9 months ended 30 September 1965), the auditor is of the opinion, that the contractor may experience a lesser rate than proposed and therefore recommends the following: Engineering Manufacturing Burden Burden G&A Rates Per Contractor's Proposal 104% 74% 7.5% Rates Recommended by the Auditor 102% 71% 7-4% Per cent of Rate Questioned 2% 30 .l Burden Base Per Proposal $43,873 117,M2 Per cent of Rate Questioned 2% 30 Costs Questioned (Base x Rate Reduction) T-777 $ 536 G&A Base Costs Questioned G&A Questioned @7.4% Total G&A Questioned ( 268) The contractor's proposed purchase parts were verified to vendor's quotes and prior buys of like items. The extentions and additions of the bill of materials were verified. No exceptions were noted, but the applicability of the proposed purchased parts to the procured equipment and the frequency of use, should be evaluated by a technically qualified repre- sentative. 149,7o6 .1o 150 32 8 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 The costs questioned of $2,209 represents the auditor's exception to a 10% shrinkage factor applied to the total estimated costs of raw and purchased materials (non-recurring costs excluded.) The contractor could not support this factor with historical data or adequate back-up and is therefore questioned by the auditor. d. Travel and Subsistance: The contractor proposed two 2-day trips to the West Coast at $381 each and two 3-day trips at $416 each for the purpose of visiting the associate contractor. In addition, three 2-day trips are included for visitations to a West Coast vendor at a cost of $381 each. The costs represent round-trip air fare of $305, subsistance of $35 per day and $6 for travel to the airport. The auditor considers these costs' acceptable, but recommends for further consideration of a technical representative the necessity for the number of trips. e. Overtime Premium: The auditor recommends the overtime premium for the further consideration of a qualified technical representative. The contractor's estimate is based on application of a 10% factor to the total estimated hours for labor classes V, VI, VII, VIII, and IX, and priced at 2 of the hourly rates for these classes. The basis for a 10% factor was not supported by the contractor. The contractor's computation of overtime premium is as follows: Labor. Class Hourly Rate Total Estimated Hours Per Proposal Overtime Premium Hours 10% of Estimated Hours Overtime Premium Rate 2 of Hourly Rate Total Overtime Premium Per Proposal V 4.50 2,710 270 2.25 608 VI 3.70 2,590 260 1.85 481 VII 3.27 2,860 290 1.62 470 VIII 2.80 2,390 240 1.40 336 IX 2.33 280 20 1.16 23 TOTAL Overtime Premium per proposal $1,918 f. Packaging and Shipping: Considered acceptable for the purpose of this report. Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 '.r g. Fee Requested: The contractor has requested a fee based on 8% of the WILLIAM F. EDWARDS Auditor General Representative (APL) Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Cfll'TllI I 0lo1' I RTAMP O1i. HOT.fl.S Ln;irre Jr~ln , Dr ..t t.;;.n{ ~, FF.zblicat;ionp -. 100 terra. Adm. A S 0 N D J F M. .25 .5 .5. .5 .5 .5 .25 .75 1.25 1.0 Buy Parts, Schod, Type Proc. &,AB En . Dcsi z EE 7 MM X 200 1400 ME 3 MM x 200 600 Te St Proc. .5 MM X 200 100 H ndbook .:.} NM X 2 00 100 P:;?oto Tort-Unit Bela. .5 MM 100 i.B. --Test 1 MM 200 Prod . To:3-Isar.. ? i3. j cra.. 7 Units x 10 45o Tech. Design D sign & Make B Ass+y. Test Proc. P :oto Teri; BB Test Prod Test 45 7 MM X 130 .5MM'.X180 .5 MM x L8o 2MIX X180 ca. X 10 1260 90 90 360 45o 3 , 0 tit X 180 - 5~; ," 2950 2250 .PC-BS u BS X 180 ea. Assy. Dwc. ECNS 1080 120 300 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 7140 kIr:;, Mfg. Parts & tbs. Page 2 'ot' ' Prato - 50 Hrs. )C 1 Pad . w 2: X 10 Prato w br,l.rigg 6 Bd.'h, 304 1 Asst'. d . 60 Bd s ! 21+ 04. 10 Assay. 80 4% in Proc. 15% Shops W &..~A,',470 Pr~.r t~ . Roc ivth~; X30 ors,.; Program Management Reliability. QA. Management' Adm. Management' ,Frig. Pack and. Ship Man .6 Months Man 6 Months '15 .,h rs . 270 Secretary. 10 Hrs -x MnnthG 1v Approved For Release 2011/01/28: CIA-RDP72B00464R000400090027-4 .5 , Man 6 Months