FLOOR & RAILS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP74-00005R000100080038-5
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
April 23, 2001
Sequence Number:
38
Case Number:
Publication Date:
June 8, 1971
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 67.42 KB |
Body:
? Approved For ReleaseV01/07/17: CIA-RDP74-00005RO0010QM
8 June 1971
FLOOR 5 RAILS
1. New Rails or Bring Concrete to Top of Rail
2. Level & Straighten the Concrete
3. Tile isn't Setting Tight
4. Concrete ran through the First Floor,
5. Center Aisle will have to be Covered after Bays are Finished
6. Should Concrete be Poured under Stationary Shelves? If it is,
do we need the. Plywood Deck under the Bottom Shelf?
7. Cut out Wooden Deck for the Chain Return Box
8. Concrete, not Bonded to the old Floor. Why? Should it be?
9.* Where are the wheels for the carts and what size are they?
W:11 they work?
1. The fourth brace on each upright angle has been put back on
25X1A9a , per 1VX.
2. Shelves have been straightened, tightened and squared.
3. Brace that holds the electrical wire between shelves tends to
droop and will hit top boxes.
Approved For Release. 20Q1/07/17: CIA-RDP74-00005ROO0100080038-5
Approved For Release 2001/07/17 : CIA-RDP74-00005R000080038-5
4. Shouldn't wire run closer to upright angle where it runs
from top of shelves to chain pick up.
5. If metal is taken off the end shelves, couldn't a "hand"
or box hit the electrical hook-up?
6. Couldn't the motor and control panel and other motor in each
bay set under a fifteen in shelf? (Put a board in front of
motor that could be removed.
7. The wire between first two motors was too short to let you
take out a motor without disconnecting the wire. A new set
of motors was put in. Can the motors be easily changed --
screw changed so that screw head pointed out.
8. How does safety alert wire hook to end panel?
9. Should be cleaned by washing in probably two (2) waters.
Some arrangement should be made to keep shelves clean after
completion of each bay.
10. How is the wire that runs on top, of each row fastened down:
and where?
11. The safety will be put on the second bracket or angle
the floor. Need second nut on turnbuckle.
LIGHTS,
from
1. Small ducts will get one row'of lights on angle.
2. Large ducts will get row of lights on each side at a angle.
3. oversize will get probably a spotlight.
25X1A6a
M ENGINEERS
1. Should the light fixtures that are taken out of building
be kept on lower parking lot for the duration of the project?
(70 so far)
Approved For?Release 2001/07/17 : CIA-RDP74-00005R000100080038-5