COST ESTIMATE FOR THE CONVERSION OF(Sanitized)TO RECORDS STORAGE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP74-00005R000100090018-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
June 19, 2000
Sequence Number: 
18
Case Number: 
Publication Date: 
March 2, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP74-00005R000100090018-6.pdf94.3 KB
Body: 
Approved For ReWase 2000/0 P,; 5R00010%09 181#a 25X1A6a COST ES - CONVERSION OF BUILDING COST FOR FISCAL YEAR 1970 A.-'Minimum building modifications (OL estimate) 1. Increase Interior light level, install ous ll ane exterior lighting, and misce connections to existing emergency power 8,000 .system, as required - - - - - - - - - 2. Modifications to secure roof and siding.- 1,000 Modify door openings - - - - - - - - 1,000 Vinyl Asbestos flooring - - - - - - - - - 1,800 Door contact alarms and connection to annunciator in guard office; Detex clock stations; fire detection system - 5,000 6. install'exhaust fan in existing louver - 400 Sub-Total $17,200 7. Contractor percentage - 30% of $17,200 5,160 80 8. Contingency .. 15% of $17,200 2,5 TOTAL $24,940 B. CCTV System, (OS estimate) 1. Five (5) motion detection systems - -- - 15,350 . 2. Six (6) monitors - - - - - - - - - 1,500 3. Installation (Systems, Monitors & GFM) - 5_,620 Sub-Total - - - $22,470 4. Contractor percentage - 30% of $22,470 6,740 15% of $22,470 370 5. Contingency TOTAL $32,580 Approved For Release 200 ...m ,:e:of? 00005R000100090018-6 le, I ,,~pproved Foy.RReeea?e 2000/08/25 -RDP7* 0 1000100090018-6 25X1 C4a C. Design & Inspection Services by Q 10% 5 752 D. for A and B above, $2,494 + $S, 18,000 cubic feet of shelving, purchase-and install ($1.00 per cubic feet - DDS/RAB estimate) $18,000* TOTAL PROJECT COSTS (A+B+C+D) - - - - - - - $81,272 SAY - - - - - - - - - $820000. COST FOR EACH FISCAL YEAR IN USE BEGINNING WITH FY 1971 ,,,,. c nc e and s a 000 r r r r r - - - v, $ ) - - - r (OS estimate This represents the maximum amount of shelving that this building will hold. The exact amount to be used will be determined at a.later date. Approved For Release 2000/08 ,.. ` t~4 RDP74-00005R000100p90018-6 ing of CCTV System + ervi